The Records · Michigan Energy Files

Read the file yourself

Every primary document behind the Energy Files, mirrored here unaltered: 83 public records as of October 2, 2026. The earliest was received on August 6, 2026. Each file is a byte-for-byte copy of the one obtained from the source named beneath it; its SHA-256 fingerprint lets anyone check that. Our briefing is the guided tour; this page is the source of truth.

Records mirrored, by date retrieved or received

Records
83
Pages
2,135
Total size
417.7 MB

Largest days

  1. : 20 records — The Application File (9), Township Law (4), State Law & Regulators (2), and 3 other categories (5)
  2. : 14 records — The Meetings (11), Caledonia Township (2), Other township documents captured automatically (1)
  3. : 25 records — Gustin Township Decision (7), State Law & Regulators (6), Caledonia Township (5), and 4 other categories (7)
Records added each day

The line is the running total of records in this library, by the date each one was retrieved or received. Each step up is a day on which records were added.

Records added to the mirror on each date
Date retrieved or receivedAddedRunning totalWhat was added (category, number)
11The Opposition (1)
The title
2021The Application File (9), Township Law (4), State Law & Regulators (2), The Predecessor Project (2), The Courts (2), The Meetings (1)
The 20 titles
122Other township documents captured automatically (1)
The title
224The Opposition (2)
The 2 titles
226Caledonia Township (1), Other township documents captured automatically (1)
The 2 titles
127Township Law (1)
The title
330Caledonia Township (2), Other township documents captured automatically (1)
The 3 titles
1444The Meetings (11), Caledonia Township (2), Other township documents captured automatically (1)
The 14 titles
246Other township documents captured automatically (2)
The 2 titles
2571Gustin Township Decision (7), State Law & Regulators (6), Caledonia Township (5), The Application File (2), Ogemaw County (Logan Solar) (2), The Courts (2), The Meetings (1)
The 25 titles
1283State Law & Regulators (4), Census Data (4), Company Statements (3), Caledonia Township (1)
The 12 titles
All records838311 retrieval dates, Aug 6, 2026 to Oct 2, 2026

Pages: summed over 69 records; 14 have no page count. Total size: 417,695,660 bytes; a megabyte here is 1,000,000 bytes, as on each record below.

Source: this library’s index, records.json, generated Oct 2, 2026. Dates are each record’s retrieved date; page counts and sizes are as listed there. Categories are the library’s section names.

The Application File

Gustin Solar — Application to Gustin Township (May 15, 2026) (121.9 MB)

Consumers Energy's 1,233-page application for the 25 MW addition in Gustin Township. Site plan sheet CV-200-001 (p. 99) carries the Gustin Township capacity and acreage table.

Consumers Energy · May 15, 2026 · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/05/Gustin-Solar-May-15-2026-Consumers-Energy.pdf
sha256 147eec08cee703d9e8940ccf7df920cb3b3c0ba3ca51f1b5742cf607007dac0d

SLUP Cover Letter (143 KB)

Consumers Energy's cover letter submitting the Special Land Use Permit application to Harrisville Township.

Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 2c0ab587900bf1bf31762f215f51ab9a9a875a86a07e4240f92d82363dbe81a6

Special Use Permit Summary (694 KB)

The application's own summary of the project: capacity, acreage, components, and how it claims to meet each ordinance standard.

Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 6d3a0d085f272c80dcf52950f2474e0635a5f1211280db188c6d1a18d2fe24ca

Exhibit A — Landowner Documents (7.9 MB)

Easement and participation documents for the ten parcels enrolled in the Harrisville Township portion.

Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 e5e027d5ed65e951b3a2197ceba99dfd60fffe3cd118233b0b6a8bf51548ae26

Exhibit B — Site Plan (155.6 MB)

Full engineering site plan: array layout, setbacks, cable routes, roads, fencing. The largest and most detailed document in the file.

Consumers Energy · June 2026 · retrieved 2026-10-01 from https://harrisvilletownship.com/wp-content/uploads/2026/06/Exhibit-B_Site-Plan-.pdf
sha256 127c344767fd4e89f76c03daf625190f6b8d4b87d3d0cb48ae72b4603147261c

Correction, Oct 1, 2026: the copy of this file published here from Aug 7 to Oct 1, 2026 was incomplete (136,044,544 of 155,608,782 bytes) and could not be read past the cut. It has been replaced with the complete file from the township. Old fingerprint, of the incomplete copy: d68882e5272c15fd2a27d621010eb5d2e80f90f500217537332f8ee5a9bbe7a6. Corrections log.

Exhibit C — Glare Study (4.1 MB)

The glare study prepared by 1898 & Co., a division of Burns & McDonnell, for the Harrisville Township application. It models the arrays in ForgeSolar at an average height of 5.5 ft above ground, with residences as observation points six feet above the ground (PDF p. 8). The Grobbel comment letter's Finding 5 asks for the study to be re-run and calls the 5.5-ft height “invalid” (letter, p. 3).

Burns & McDonnell for Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 927ab948e7423d4d4d64e833ee9d54f72e33053a657c6059163b7b043c9c9b38

Exhibit D — Operations & Maintenance Plan (548 KB)

How the facility would be operated, inspected, and maintained over its 30-year term.

Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 8274eb3588b3b86e7599a9572f27893caa8892016f42ba2434df39dcefabb140

Exhibit E — Emergency Response Plan (778 KB)

Fire, spill, and emergency procedures for the solar station.

Consumers Energy · Aug 2025 / June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 60bc3fbf6cfb415048db00e6fce04a1bbd038f774a771fe11715798338e4a618

Exhibit F — Preconstruction Sound Study (12.7 MB)

The sound study by Burns & McDonnell for the Harrisville Township application. It models 25 sources, listed as the Gamesa Electric Proteus PV Station, with receptors at “5 feet above grade” (PDF pp. 10–11). The Grobbel comment letter's Finding 6 asks for the study to be re-run with receptors at 35 ft, the height it gives for a two-story home under the township ordinance (letter, p. 3).

Burns & McDonnell for Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 9a97b02459cd677312b77188ab2135db132629ad486ea309e8705dfeb388e32a

Exhibit G — Decommissioning Plan (5.3 MB)

What removal and site restoration would involve after the project's life, and its cost basis.

Black & Veatch for Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 7e0a03f7845df12069ec54cf1db6318245237065687e089d457eaa7097cb4aea

Letter — Preemption of Local Groundwater Regulation (117 KB)

A memo from Heather Prentice, Consumers Energy's Director, Engineering and Environmental Compliance, to the Planning Commission and Zoning Administrator. It asks the commission to find that the groundwater monitoring requirements of ordinance Sec. 3.22.C.1.a “are satisfied by” the EGLE spill prevention program, and argues that the section “is superseded by Part 31 and Part 201 of NREPA” (pp. 1–2). It is undated.

Consumers Energy (Heather Prentice) · undated; posted with the June 2026 application · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 9bf134a84c70c267f8180b57988c9433ec6d156e80ff190c2102a19dba011d11

Gustin Township Decision

Gustin Twp. Planning Commission — March 3, 2026 Minutes (320 KB)

Minutes of the Planning Commission's March meeting.

Gustin Township Planning Commission · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/09/3-3-26-Planning-and-Zoning-Meeting-Minutes.pdf
sha256 3f043540da3aba305e9d6f3ab8a62ab5893c17fb878760ff4f5a23f9c5f3a216

Gustin Twp. Board — July 20, 2026 Minutes (68 KB)

Minutes of the township board's July meeting.

Gustin Township Board · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/08/7-20-26-board-minutes.pdf
sha256 90dba40458da5995564a0bf09bc1dc035b0d5fbee30e98081664ba5011ad75a0

Gustin Twp. Board — Aug 17, 2026 Minutes (72 KB)

Minutes of the township board's August meeting.

Gustin Township Board · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/09/8-17-26-board-minutes.pdf
sha256 6d24ffc33e5713f21e6effcc29d1880b180fc342d9b6a79179ef8ecbd2a438f1

Gustin Twp. — Dec 2, 2024 Special Meeting Minutes (Sapling Solar) (1.7 MB)

Special land use approval for Sapling Solar, 215 MW on about 1,427 acres, and the Zoning Board of Appeals' sound and setback variances.

Gustin Township Planning Commission and Zoning Board of Appeals · scanned document · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/09/12-2-24-Special-Meeting-Minutes-Planning-and-Zoning.pdf
sha256 8fa5b6c041998c8a1fb17011a123bed18079b82caae767f6f95cdf65f6df2738

Gustin Twp. Planning Commission — June 2, 2026 Special Meeting Minutes (974 KB)

Consumers Energy presents the addition to the township, including its figures for total fenced acreage and added megawatts.

Gustin Township Planning Commission · scanned document · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/09/6-2-26-Special-Meeting-Minutes-Planning-and-Zoning.pdf
sha256 2419469067eecafa4fd798ae9a4946905a34f184feeb421850723e396b6911e4

Gustin Twp. Planning Commission — July 13, 2026 Special Meeting Minutes (2.3 MB)

The hearing on the 25 MW addition: Consumers Energy's presentation, public comment, and a motion to approve with conditions that was seconded and then tabled.

Gustin Township Planning Commission · scanned document · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/09/7-13-26-Special-Meeting-Planning-and-Zoning.pdf
sha256 2bf37e393d429365315e56b8408a7e69b087124551902ad0bcb19d9f2e7d5d34

Gustin Twp. Planning Commission — Aug 6, 2026 Minutes (99 KB)

Records the 5–0 vote to rescind the tabled motion to approve, and the 5–0 vote to deny the application the minutes describe as an "Addition to previous permit," with the motion's stated reason.

Gustin Township Planning Commission · posted Sept 7, 2026, not marked approved · retrieved 2026-10-01 from https://gustintwp.gov/wp-content/uploads/2026/09/August-6th-2026-Gustin-Township-Planning-Meeting-Minutes.pdf
sha256 48022319068d644f4c6e04cd89c8e0fbaa365e0b8a48c4fa607d973c517640a6

The Opposition

Grobbel Comment Letter (fact-checked in our briefing) (6.9 MB)

The 26-page public comment urging denial: ten findings on wetlands, glare, noise, and the township master plan. Read alongside our claim-by-claim fact-check. This copy (7,211,217 bytes) is a compressed version: the same 26 pages and text, with images stored at 72 ppi and no PDF creation date. The township's posted copy (50,760,856 bytes) is listed next to it.

Grobbel Environmental & Planning Associates · July 26, 2026 · received 2026-08-06 as a file transfer; sender and original address not recorded
sha256 9423c7409ed9b5408493384e5fd949dfdab3282c0ac135698eb1e3d7726832a4

Grobbel Comment Letter — Harrisville Township's Posted Copy (48.4 MB) NEW

The same 26-page letter as posted on the township website (50,760,856 bytes): images at full resolution (912 ppi on p. 5, where the compressed copy has 72 ppi) and a PDF creation date of July 26, 2026. The text matches the compressed copy.

Grobbel Environmental & Planning Associates · July 26, 2026 · retrieved 2026-08-12 from https://harrisvilletownship.com/wp-content/uploads/2026/08/Gustin-Solar-Grobbel-7-26-26_.pdf
sha256 b7da228b7ea038ccc2800c31acedf9975d74e2846ef84fc0cc967727d3aa91f1

Independent Ordinance Compliance Review — Gustin Solar, Harrisville Twp. (July 29, 2026 hearing) (433 KB) NEW

A 43-page review prepared for the Harrisville Township Planning Commission's July 29, 2026 public hearing by a Michigan-licensed professional engineer (license No. 37232; no name appears in the text). It recommends denial of the special land use permit and site plan and includes a suggested motion to deny.

Author named only by license number · July 2026 · retrieved 2026-08-12 from https://harrisvilletownship.com/wp-content/uploads/2026/08/Gustin_Solar_Report_Harrisville-final-072926.pdf
sha256 8aa559928d545ca759b7e7767b01a0696fadb5077055392ed18f0f33dddf763f

Township Law

Harrisville Township Zoning Ordinance (1.0 MB)

The comprehensive May 2025 rewrite — the ordinance this application is judged against.

Harrisville Township · May 14, 2025 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 5cb9fe82e46297cd9192218cc1f4e0aef6a5affe6b9a6cf312cad61f0dde69c3

Zoning Ordinance Update (122 KB)

December 2025 amendments to the rewritten ordinance.

Harrisville Township · Dec 2025 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 a2baf961b6fc7fe67ff33ff685732cb493a2c423351572a26b691907d4ae02e8

Solar Ordinance 2-2023 (282 KB)

The township's original solar-specific zoning amendment, adopted before Gustin Solar surfaced.

Harrisville Township · 2023 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 8b117030b99399c1ff3253ebcff52e5808eb2ff211a49c0ac43ccf01c3b3d39a

Township Zoning Map (620 KB)

The zoning map (effective Feb 14, 2014) showing the Agricultural district where all ten parcels sit.

Harrisville Township · 2014 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 c4b409f002b67844892fb74f8fb75faca898dec13f2c572f6205988f655f1875

Gustin Township — Ordinance No. 1 of 2025, Battery Energy Storage Systems (4.7 MB) NEW

Zoning amendment that defines battery energy storage systems, adds them to the table of uses and sets standards for off-site systems (new Sec. 7.32). The signed copy gives adoption Dec 15, 2025, publication Dec 24, 2025 and effect Jan 1, 2026.

Gustin Township Board · adopted Dec 15, 2025 · scanned document · retrieved 2026-08-15 from https://gustintwp.gov/wp-content/uploads/2026/08/Gustin-Township-Battery-Energy-Storage-Systems-Ordinance-No-1-of-2025-website.pdf
sha256 e6882b9dfb74da76b2c04f237fd03de1477294ea91a73ebe884bc52be2959744

State Law & Regulators

Michigan House Journal No. 93 — Nov 2, 2023 (Roll Call 483) (1.1 MB)

House Bill 5120 passes the House 56–52 on Roll Call 483 and is given immediate effect (pp. 2319–20). Reps. Roth and Kuhn are excused (pp. 2228, 2242).

Michigan House of Representatives · House Journal No. 93, pp. 2227–2326 · retrieved 2026-10-02 from https://www.legislature.mi.gov/documents/2023-2024/Journal/House/pdf/2023-HJ-11-02-093.pdf
sha256 8c1fccb3cdf10ad2680288b6f269943276ab3a1f3b6270bed962d1bf57a6d6cd

Michigan Senate Journal No. 99 — Nov 8, 2023 (Roll Call 669) (573 KB)

Amendments by Sens. Victory and McBroom are not adopted, and House Bill 5120 passes the Senate 20–18 on Roll Call 669 (p. 2447). Sen. McBroom’s statement, printed as his reason for voting no, is on pp. 2449–52.

Michigan Senate · Senate Journal No. 99, pp. 2439–2500 · retrieved 2026-10-02 from https://www.legislature.mi.gov/documents/2023-2024/Journal/Senate/pdf/2023-SJ-11-08-099.pdf
sha256 1876f537d955880c814a8533d2129d9e73601f9c50e205ab08f4069db4693343

Michigan House Journal No. 96 — Nov 8, 2023 (Roll Call 492) (606 KB)

The House concurs in the Senate substitute (S-4) for House Bill 5120, 56–53, on Roll Call 492 (p. 2366). Rep. Bruck is excused from the session (p. 2348).

Michigan House of Representatives · House Journal No. 96, pp. 2347–2414 · retrieved 2026-10-02 from https://www.legislature.mi.gov/documents/2023-2024/Journal/House/pdf/2023-HJ-11-08-096.pdf
sha256 bd21d41c9632b5806d81d3e926a471d3740465ca1c17ebf40353e6ac56f765f4

Michigan Manual 2023–2024 — Legislative and Congressional Representation by County (101 KB)

Pages 303–310 of the Michigan Manual 2023–2024: for each county, its member of Congress, state senators and state representatives in 2023–24, each with party (R or D) and district. Across the eight pages it names 38 senators (20 D, 18 R) and 110 representatives (56 D, 54 R). The source for the party labels on The Law page.

Michigan Legislature · Michigan Manual 2023–2024, pp. 303–310 · retrieved 2026-10-02 from https://www.legislature.mi.gov/documents/2023-2024/michiganmanual/2023-MM-P0303-P0310.pdf
sha256 93546876a67ed11797b2f5d1e249b465429b22739fac95db5dc9fca77d2f3295

Michigan Zoning Enabling Act — MCL 125.3203 (snapshot, Oct 1, 2026; page source) (23 KB)

Section 203 of the Michigan Zoning Enabling Act (Act 110 of 2006), which says a zoning ordinance “shall be based upon a plan designed to promote the public health, safety, and general welfare.” Quoted in the briefing's check of the Grobbel letter's Finding 1.

Michigan Legislature · statute page · retrieved 2026-10-01 from https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-125-3203
sha256 99b072eefb2ca9f39d36698ea6770d1a99a8d72bc8692658f42884fae0d5ca37

Michigan Environmental Protection Act — MCL 324.1705 (snapshot, Oct 1, 2026; page source) (21 KB)

Section 1705 of Part 17 of the Natural Resources and Environmental Protection Act (Act 451 of 1994), on administrative, licensing and other proceedings. Quoted in the briefing's check of the Grobbel letter's Finding 10.

Michigan Legislature · statute page · retrieved 2026-10-01 from https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-324-1705
sha256 07e6d98f8731d471e6ce4e4862bc5b997408e9d0d3a7a84478bcdeb4e7797e22

ForgeSolar — Help Guide (snapshot, Oct 1, 2026; page source) (289 KB)

The help guide for ForgeSolar, the glare-modeling tool the Exhibit C glare study says it used, including its guidance on panel and observer heights. Quoted in the briefing's check of the Grobbel letter's Finding 5.

ForgeSolar · help page · retrieved 2026-10-01 from https://www.forgesolar.com/help/
sha256 c584aa0791f0906b941ffc02a34dfd28e4e0c95517f07286e10e6e3045806dd6

MPSC — U-21932 Acceleration Solar Siting Issue Brief (snapshot, Oct 1, 2026; page source) (154 KB)

The commission's issue brief for the Acceleration Solar siting case, including its filing and settlement dates.

Michigan Public Service Commission · snapshot · retrieved 2026-10-01 from https://www.michigan.gov/mpsc/consumer/be-informed/tips/u-21932-acceleration-solar-siting-issue-brief
sha256 59d6e4b1926d12ac06f0f2083465b62df00088665a71ba4b16b0801f0b831f44

MPSC News Release — Ingham County Siting Settlement (Aug 27, 2026; page source) (152 KB)

The commission approves a settlement permitting the 90 MW Acceleration Solar facility, Case No. U-21932.

Michigan Public Service Commission · news release · retrieved 2026-10-01 from https://www.michigan.gov/mpsc/commission/news-releases/2026/08/27/mpsc-approves-siting-settlement-on-ingham-county-solar-project
sha256 f0dc7f3af338f1d6be29a51e7f504f6e74c87831ae79db2c547855d21c3f050d

MPSC — Current Siting Applications (snapshot, Oct 1, 2026; page source) (180 KB)

The commission's table of renewable energy and storage siting cases under PA 233: 12 listed, none in Alcona County.

Michigan Public Service Commission · snapshot · retrieved 2026-10-01 from https://www.michigan.gov/mpsc/regulatory/facility-siting/renewable-energy-and-storage-facility-siting
sha256 f7761f749e80be9849d8cdab5a7c668ccc9a3e3a2d26c835973f7d46fefbeab8

Public Act 233 of 2023 (full text) (199 KB)

The full text of the 2023 siting law: when it applies (solar facilities of 50 MW or more), the state certificate route, the definition of a compatible renewable energy ordinance, and the Sec. 226(8) standards.

Michigan Legislature · Nov 2023 · retrieved 2026-08-07 from https://www.legislature.mi.gov/documents/2023-2024/publicact/pdf/2023-PA-0233.pdf
sha256 f6c0877e099e2ec6a359b83cc300ae1a8895ef3ddce00293664d91b951d03dd0

MPSC Act 233 Filing Requirements (619 KB)

The commission's application filing instructions and procedures for a state siting certificate, dated Oct. 10, 2024. On May 7, 2026 the Court of Appeals reversed two interpretations these instructions contain: the definition of an “affected local unit” (Sec. 1.3, PDF page 5) and when the 30-day notice period starts (Attachment C-1, PDF page 46) (opinion, pp. 2, 13, 15). We have not found a later version of these instructions.

Michigan Public Service Commission · 2024 · retrieved 2026-08-07 from https://www.michigan.gov/mpsc/
sha256 961a948e9e0475bf9a61b63ea4e7f0675b6f7de97cea195aa9bf03a5088b4c98

The Predecessor Project

Sapling Solar — Application Narrative (505 KB)

Ranger Power's original 215 MW proposal in Gustin Township (Oct 2024), later absorbed into Gustin Solar.

Ranger Power · Oct 2024 · retrieved 2026-08-07 from https://gustintwp.gov/wp-content/uploads/2024/09/Narrative.pdf (the same file is posted at https://www.alconaconservatives.com/wp-content/uploads/2024/10/Narrative.pdf)
sha256 fcbbb7380a71452d6372e8c17134c62a4da1e0c58f585508025222a170ef1133

Sapling Solar — Local Permitting & Benefits (993 KB)

The predecessor project's community-benefits pitch, including the >$12M lifetime tax revenue claim.

Ranger Power · Oct 2024 · retrieved 2026-08-07 from https://gustintwp.gov/wp-content/uploads/2024/10/Sapling_Local-Permitting-Benefits.pdf
sha256 bbd793c3c408cf5448ba0967422ae60fdd99b8e1b7838a27efbe021bb4140377

Company Statements

Consumers Energy — Solar Energy Projects page, Northern Michigan tab (printed Oct 2, 2026) (358 KB)

The same page printed with its Northern Michigan tab open: Caledonia Solar (117 megawatts, 1,200 acres, 2029), Gustin Solar (335 megawatts, 1,800 acres, 2028), Logan Solar and Munro Solar.

Consumers Energy · company web page · print of the web page · retrieved 2026-10-02 from https://www.consumersenergy.com/about-us/electric-generation/renewables/solar-generation/solar-projects
sha256 0aece99a48cf33e41c3b3f120057aa7bc004e777a1a838403ddb12190fe820c6

Consumers Energy — Solar Energy Projects page (snapshot, Oct 2, 2026; page source) (121 KB)

The page as the company’s server sent it, all three tabs. It lists eight “Active Solar Projects”: Karn, Caledonia, Gustin, Logan, Munro, Liberty Farms, Muskegon Solar Energy Center and Spring Creek Agri-Energy Center. Caledonia Solar: Alcona County, 117 megawatts, 1,200 acres, start of commercial operation 2029.

Consumers Energy · company web page, fetched with a headless browser · retrieved 2026-10-02 from https://www.consumersenergy.com/about-us/electric-generation/renewables/solar-generation/solar-projects
sha256 6448b87a3cdbe9c3c3982b5037d5f7fc3d777783cf634857190fb78ad431df02

Consumers Energy News Release — Gustin Solar announced (Sept 26, 2025; printed Oct 2, 2026) (274 KB)

The company’s announcement of Gustin Solar: 335 megawatts, “enough to power about 60,000 homes”; “Construction should start in mid-2026 with a goal to start operations by July 2029.” Printed to PDF from a headless browser because the company’s firewall refuses scripted downloads.

Consumers Energy · news release · print of the web page · retrieved 2026-10-02 from https://www.consumersenergy.com/news-releases/news-release-details/2025/09/26/consumers-energy-announces-plans-for-new-solar-array-in-northeast-michigan
sha256 70c429345467d85f15c11b4982885691a7ed3554be8728fce5c0074f1d9db3a5

Census Data

Census Bureau — 2025 Gazetteer, County Subdivisions, Michigan (178 KB)

Land and water area for every Michigan township and other county subdivision. Gustin Township's land area is 35.686 square miles and Harrisville Township's 30.316.

U.S. Census Bureau · 2025 Gazetteer Files · data file · retrieved 2026-10-02 from https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_gaz_cousubs_26.txt
sha256 7c4b7a0cc226e6b5968809a1788c10d28db94b4304af07cf35e0d901c7d414db

Census Bureau — County Population Totals, Vintage 2025 (all U.S. counties) (2.1 MB)

Population estimates for every U.S. county, 2020–2025. Alcona County’s estimate for July 1, 2025 is 10,556, 75th of Michigan’s 83 counties.

U.S. Census Bureau · Population Estimates Program, Vintage 2025 · data file · retrieved 2026-10-02 from https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/totals/co-est2025-alldata.csv
sha256 4f5a499d851e2cb48fd7a5405e5a9235453a8a66933657aacd10df0e264f35d5

Census Bureau — Michigan County Population Estimates by Age and Sex, Vintage 2025 (280 KB)

Estimates for each Michigan county by age and sex. For July 1, 2025 (YEAR 7), Alcona County: 10,556 residents, 3,952 of them 65 or older, median age 59.0. Summed over the 83 counties: 2,076,467 of 10,127,884 residents 65 or older.

U.S. Census Bureau · Population Estimates Program, Vintage 2025 · data file · retrieved 2026-10-02 from https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/asrh/cc-est2025-agesex-26.csv
sha256 e23c3a203c5d67cf5f9e4d49ccc1c422d56efb6b7b618804be5655e8dace29fe

Census Bureau — American Community Survey 2020–2024 5-Year, Table B19013 (median household income) (17.9 MB)

The Census Bureau’s summary-file table of median household income for every geography, pipe-delimited. Alcona County (0500000US26001): $54,993. Michigan (0400000US26): $72,875.

U.S. Census Bureau · ACS 5-year summary file · data file · retrieved 2026-10-02 from https://www2.census.gov/programs-surveys/acs/summary_file/2024/table-based-SF/data/5YRData/acsdt5y2024-b19013.dat
sha256 b25a176b0e6c339b6f3a2a0d3d8446bf06f5f080b4395993ec9a8313efb1c229

Caledonia Township

MISO — Generator Interconnection Queue (snapshot, Oct 2, 2026) (2.3 MB)

A point-in-time copy, taken Oct 2, 2026, of MISO's public list of projects seeking to connect to the grid; the list changes as projects are added, studied and withdrawn. It lists two active solar entries in Alcona County with an in-service date of April 1, 2027: J3451 (120 MW) and J3539 (116.9 MW). The queue does not name developers.

Midcontinent Independent System Operator · interconnection queue data · retrieved 2026-10-02 from https://www.misoenergy.org/api/giqueue/getprojects
sha256 2a6fd87b4781b578d2016b835c86438347d9cb0989c613d784d6c9ca3d036150

Caledonia Twp. Board — Aug 11, 2026 Minutes (approved) (457 KB)

Minutes of the township board's August meeting.

Caledonia Township Board · retrieved 2026-10-01 from https://caledoniatwp.net/wp-content/uploads/2026/09/Meeting-approved-minutes-8-11-26.pdf
sha256 cfbcf8228b82c94e5e26e3ebb05fb8bb8c7a5b236d1e31ad2129a286bcb73972

Caledonia Twp. — Amending Ordinance (July 27, 2026 text) (814 KB)

The text of the zoning amendments covering solar, wind and battery storage.

Caledonia Township · retrieved 2026-10-01 from https://caledoniatwp.net/wp-content/uploads/2026/08/Caledonia-Township-Amending-Ordinance-7-27-26.pdf
sha256 4d99ea6809820c7738e47739b34654c5456d68c2398d8938982059e764985423

Caledonia Twp. Board — Sept 8, 2026 Minutes (draft) (210 KB)

The board approves Ordinance 26-01.

Caledonia Township Board · draft · retrieved 2026-10-01 from https://caledoniatwp.net/wp-content/uploads/2026/09/Meeting-Draft-minutes-9-8-26.pdf
sha256 d41b8c7e52379a6be2f54caef376acd0ba15777b34158d3e923b0f8bdddfcc90

Caledonia Twp. Planning Commission — Aug 31, 2026 Hearing Minutes (draft) (104 KB)

The public hearing; the commission approves the zoning ordinance changes and sends them to the Alcona County commissioners.

Caledonia Township Planning Commission · draft · retrieved 2026-10-01 from https://caledoniatwp.net/wp-content/uploads/2026/09/Draft-minutes-August-31-2026.pdf
sha256 9de2f22fe1b8a454ed113811fc2b2ed787ac9871a31ae79b72f58f57cf6ae69b

Caledonia Twp. Planning Commission — Aug 10, 2026 Minutes (final) (107 KB)

Sets the public hearing on the zoning amendments for Aug 31, 2026, and cancels the Sept 14 meeting.

Caledonia Township Planning Commission · retrieved 2026-10-01 from https://caledoniatwp.net/wp-content/uploads/2026/09/Final-minutes-August-10-2026.pdf
sha256 cd495970f3538cedbe472e06e53e4da4c8f5b6b01f5aa74f02b6606ce2b76a5d

Caledonia Twp. Planning Commission — July 13, 2026 Minutes (final) (67 KB) NEW

The commission discusses an ordinance update and votes to send the changes discussed to Denise Kline and to set a public hearing date at its August meeting.

Caledonia Township Planning Commission · retrieved 2026-08-27 from https://caledoniatwp.net/wp-content/uploads/2026/08/final-7-13-26.pdf
sha256 ccc15bc42f1c8676256d28c41d6d344e211cbf345369ed67fc4f19d868ed959a

Caledonia Twp. Planning Commission — Aug 10, 2026 Minutes (draft) (77 KB) NEW

Draft of the Aug 10 minutes: the commission sets the Aug 31 public hearing on the ordinance update, which covers solar and battery storage, and records public comment from 37 signed-in guests. The final version is also in this library.

Caledonia Township Planning Commission · draft · retrieved 2026-08-27 from https://caledoniatwp.net/wp-content/uploads/2026/08/Draft-minutes-August-10-2026.pdf
sha256 4f3ef881e571fbc78185a1a9eaffd621d5d8d5bf4935ed4e23142d70eb85f497

Caledonia Twp. Board — July 14, 2026 Minutes (approved) (454 KB) NEW

Includes the Planning Commission update on ordinance changes to the table of uses and a public hearing to be set.

Caledonia Township Board · retrieved 2026-08-18 from https://caledoniatwp.net/wp-content/uploads/2026/08/Meeting-approved-minutes-7-14-26.pdf
sha256 ea65d6718bc937b127e954a922656b8f38fb77e2e4aca1ed4dbf548a69cc3cd9

Caledonia Twp. Board — Aug 11, 2026 Minutes (draft) (102 KB) NEW

Draft of the Aug 11 minutes. The Planning Commission update gives Aug 31, 2026 as the date of the public hearing on the ordinance update. The approved version is also in this library.

Caledonia Township Board · draft · retrieved 2026-08-18 from https://caledoniatwp.net/wp-content/uploads/2026/08/Meeting-Draft-minutes-8-11-26.pdf
sha256 943a3ce6f4b5903060cdb18f76ec9bcfc1ff3a206af001348fde697ee6fc7683

Caledonia Twp. Board — April 8, 2025 Minutes (approved) (481 KB) NEW

Includes the board's 5–0 roll-call vote approving the new zoning ordinance.

Caledonia Township Board · retrieved 2026-08-13 from https://caledoniatwp.net/wp-content/uploads/2026/08/Meeting-Approved-minutes-4-8-25-1.pdf
sha256 3a2e89a79ff641b7515ab3bf9bccfc5b2221c3a741a8a1687460ffa1a642ac22

Ogemaw County (Logan Solar)

Ogemaw County — Resolution 26-134 Adopting Text Amendment 01-26 (160 KB)

Adopts the one-year moratorium 5–0 and sets out the steps before it takes effect.

Ogemaw County Board of Commissioners · Aug 27, 2026 · retrieved 2026-10-01 from https://drive.google.com/uc?export=download&id=1KX260w90WnrBCRYV4M3nQIijSVCLvF4m
sha256 14074929c4251053ce669e0dc281212979c4bd1641c214806ee0b888be6493a0

Expected Next

Harrisville Twp. Planning Commission — Agenda & Minutes (pending)

The Harrisville side of the application: its commission meets the first Wednesday of even months — next regular session October 7, 2026.

Minutes expected after the Oct 7, 2026 meeting. Auto-added on publication.

Michigan Supreme Court — Order on Leave to Appeal (MSC 170249) (pending)

Whether the Michigan Supreme Court will hear the case (No. 170249): the townships' and counties' application for leave to appeal, and the cross-appeals filed July 16, 2026.

Auto-added when the court posts an order.

The Courts

Michigan Supreme Court — Order of Sept 9, 2026 (Case 170249) (210 KB)

Grants motions by the Michigan Farm Bureau and a group of solar developers to file friend-of-the-court briefs.

Michigan Supreme Court · Sept 9, 2026 · retrieved 2026-10-01 from https://www.courts.michigan.gov/4a57ee/siteassets/case-documents/uploads/sct/public/orders/170249_162_01.pdf
sha256 1c2de1f080462882a4cb97119eefd271760ff495ef2c362a8dd5012fee98634a

Michigan Supreme Court — Case 170249 Docket (snapshot, Oct 1, 2026) (274 KB)

Docket for In re Implementing Provisions of Public Act 233 of 2023: status "Pending on Application"; Court of Appeals No. 373259.

Michigan Supreme Court · docket data snapshot · retrieved 2026-10-01 from https://www.courts.michigan.gov/c/courts/getmichigansupremecourtcasedetaildata/170249
sha256 e3b75327dc0a1696189192758c72eedeea529cabe07881e6172d511f734e670c

Court of Appeals Opinion — In re Implementing Provisions of Public Act 233 of 2023 (553 KB)

The published May 7, 2026 opinion, with the court's May 14 amending order as page 1. Almer Charter Township is the first-listed appellant. The court held that the commission “incorrectly interpreted PA 233 with respect to a statutory timeline” and “improperly expanded the statutory definition of an affected local unit (ALU), but did not otherwise err in its interpretations of PA 233” (opinion p. 2, PDF page 3). In the body of the opinion it describes the commission's definition of an affected local unit as “more limited” than the statute's (p. 13, PDF page 14). It held that the commission “properly interpreted the term CREO in accordance with the statutory definition and the statute as a whole” (p. 11, PDF page 12). Affirmed in part, reversed in part, remanded. COA No. 373259.

Michigan Court of Appeals · May 7, 2026 · retrieved 2026-08-07 from https://www.courts.michigan.gov/4a57ed/siteassets/case-documents/uploads/opinions/final/coa/20260507_c373259_140_373259.opn.pdf
sha256 9e9510dec2742b09551a564c20939a16c8903cf00bae5a366ec785320d437809

Court of Appeals Order — Preliminary Injunction Denied (270 KB)

The January 14, 2025 order refusing to pause the MPSC's PA 233 process while the townships' challenge proceeded.

Michigan Court of Appeals · Jan 14, 2025 · retrieved 2026-08-07 from https://www.courts.michigan.gov/4a57ed/siteassets/case-documents/uploads/coa/public/orders/2025/373259_48_01.pdf
sha256 7d629fdebb59227f14fee871fd6bb43b158ce5b85dcfc14893fd58727c857bad

The Meetings

Harrisville Twp. Zoning Page (snapshot, Oct 1, 2026; page source) (98 KB)

The township's published Planning Commission schedule, including Oct 7, 2026 at 7 p.m., and its listed contacts.

Harrisville Township website · snapshot · retrieved 2026-10-01 from https://harrisvilletownship.com/zoning/
sha256 01892aff812819c7c44d3e3ebfa331d1b8fbce62b781278e142947258c674878

Harrisville Twp. Board — Sept 9, 2025 Minutes (48 KB) NEW

Minutes of the township board's September 2025 meeting. Records a motion to approve a wind ordinance, which passed.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/9-9-25.pdf
sha256 78817e96c7b40561185636b25e222b847fb35aafb24f1fb6130ea0bbc784a6d7

Harrisville Twp. Board — July 14, 2026 Minutes (81 KB) NEW

The board accepts Assessor Randy Thompson's resignation, appoints Jon Fackler assessor and hires Matt Wojwa as township attorney on a 3–1 roll call. Residents asked about the assessor serving on the Planning Commission.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/7-14-26.pdf
sha256 4c7da25cb9c31a1a771d0b40c0bd591c8eeb1dd11dde19acc45e69041e6af1be

Harrisville Twp. Board — June 9, 2026 Minutes (82 KB) NEW

In public comment, multiple residents raised concerns and questions about the solar farms. The minutes record no action on the project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/6-9-26.pdf
sha256 5b148570c10e91b4f326fb191c6d641658e62a42d1fc8b7f2c0b12a1f871ee9a

Harrisville Twp. Board — May 12, 2026 Minutes (53 KB) NEW

A Consumers Energy representative attended to answer questions about solar panels. The minutes record no action on the project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/5-12-26.pdf
sha256 bab202f689d340b780c4a0c5aa3d03e58f71c5baeb855428e4e61532e9aa2a66

Harrisville Twp. Board — April 14, 2026 Minutes (106 KB) NEW

Minutes dated April 14, 2026 (the township's file name reads 4-11-26). In public comment, two residents raised concerns and questions about solar panels in the township.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/4-11-26.pdf
sha256 98e949bc1283a214147992c0c2ee58a694b4999254f4024e3f625600a88d8c8e

Harrisville Twp. Board — March 10, 2026 Budget and Regular Meeting Minutes (110 KB) NEW

Minutes of the budget meeting and the regular meeting, including a motion to adopt the 2026–2027 budget. The minutes do not mention the solar project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/3-10-26.pdf
sha256 d54828e861af27447bc3918c5252501c752420570543dc15fd87d5a3d4779735

Harrisville Twp. Board — Feb 10, 2026 Minutes (81 KB) NEW

Minutes of the township board's February 2026 meeting, including a report that Randy Thompson was voted chair of the Planning Commission. The minutes do not mention the solar project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/2-10-26.pdf
sha256 745964123604a4fa892d3ad70c77a303928e4c582f28089e5f47f5fd746a6523

Harrisville Twp. Board — Dec 9, 2025 Minutes (49 KB) NEW

Minutes of the township board's December 2025 meeting, including pay rates for the zoning administrator, assessor and Planning Commission members. The minutes do not mention the solar project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/12-9-25.pdf
sha256 d598b25a74228d3dba1e10bb9bedd76d552f4cd7446e6ee5edb4607078c2c122

Harrisville Twp. Board — Nov 11, 2025 Minutes (44 KB) NEW

Minutes of the township board's November 2025 meeting: reports and bills. The minutes do not mention the solar project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/11-11-25.pdf
sha256 3ce37d3bf6bd91d95c1f2b1596c246d435596227ccd6598c244481a5cd8df87a

Harrisville Twp. Board — Oct 14, 2025 Minutes (48 KB) NEW

Minutes of the township board's October 2025 meeting: department reports, bills and cemetery map scanning. The minutes do not mention the solar project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/10-14-25.pdf
sha256 cfd5995319e243b30a3cd16e19384c3188ea76a45270df5c074ac9cb5da2aba0

Harrisville Twp. Board — Jan 13, 2026 Minutes (48 KB) NEW

Minutes of the township board's January 2026 meeting, including the purchase of a fire department skid unit. The minutes do not mention the solar project.

Harrisville Township Board · retrieved 2026-08-27 from https://harrisvilletownship.com/wp-content/uploads/2026/08/1-13-26.pdf
sha256 a0a00dcb0c42db7b6eff23d568df228830f6f8e45094aa9f6f26c64aed397b5b

Gustin Twp. Planning Commission — Notice for the Aug 6, 2026 Meeting (35 KB)

Notice relocating the meeting to The Sunrise Center (Lincoln) for expected crowds — agenda: un-table and potentially take FINAL ACTION on the Gustin Solar special land use application.

Gustin Township · Aug 2026 · retrieved 2026-08-07 from https://gustintwp.gov/wp-content/uploads/2026/08/NOTICE-OF-LOCATION-CHANGE-FOR-THE-GUSTIN-TOWNSHIP-PLANNING-COMMISSION-MEETING.pdf
sha256 2baf47a412560db29df966a6315e32b1fd2e827819883e148ef99cfb229931f8

Other township documents captured automatically

Posted by Caledonia Township and captured by our watcher. They are kept as filed, but they are not records of a decision on the projects we follow.

Caledonia Twp. — Treasurer's Report, Month Ending July 2026 (17 KB) NEW

The treasurer's monthly statement of balances in the township's general, road and fire funds.

Caledonia Township Treasurer · retrieved 2026-08-08 from https://caledoniatwp.net/wp-content/uploads/2026/08/JULY-2026.pdf
sha256 c5d1842f49b6b27fd99db581b7bf24e505293896013d2919b2b6ec5d0ac9e1c0

Caledonia Twp. — Treasurer's Report, Month Ending August 2026 (17 KB) NEW

The treasurer's monthly statement of balances in the township's general, road and fire funds.

Caledonia Township Treasurer · retrieved 2026-09-06 from https://caledoniatwp.net/wp-content/uploads/2026/09/August-2026.pdf
sha256 e31b43f09ac497afb08953c760739981502ee67d6a8b87176fc54a0a57e25109

Caledonia Twp. — Proposed Bills To Be Paid, August 2026 (version 1 of 3) (43 KB) NEW

The list of bills to be presented to the board, which notes it “is not always what is approved at the meeting.” First of three posted versions (PDF dated Aug 18, 2026).

Caledonia Township · retrieved 2026-08-18 from https://caledoniatwp.net/wp-content/uploads/2026/08/8.2026-Bills-To-Be-Paid.pdf
sha256 83fe0446ebc89d4dd7c8876e81050690d578f16eb040fc5a76ccb9848ae41a9e

Caledonia Twp. — Proposed Bills To Be Paid, August 2026 (version 2 of 3) (44 KB) NEW

Second posted version (PDF dated Aug 26, 2026). It differs from the first in one payment: check 8473 is void and the Crystal Spring Estates dust control payment ($2,051.36) is listed as check 8478.

Caledonia Township · retrieved 2026-08-27 from https://caledoniatwp.net/wp-content/uploads/2026/08/8.2026-Bills-To-Be-Paid-2.pdf
sha256 009b58654d597d695ccba5b3ba30957ce5c47e9f252f78fe6f06ebf4c50a1753

Caledonia Twp. — Proposed Bills To Be Paid, August 2026 (version 3 of 3) (44 KB) NEW

Third posted version (PDF dated Sept 6, 2026). It differs from the second in two check numbers: check 8472 (dust control, $2,915.07) is void and listed again as check 8480, and Crystal Spring Estates moves to check 8479.

Caledonia Township · retrieved 2026-09-06 from https://caledoniatwp.net/wp-content/uploads/2026/09/8.2026-Bills-To-Be-Paid-3.pdf
sha256 896f32fe66040a7d297381166bbcda45257bdb6c560b5ed8bc051498675c2606

Caledonia Twp. Board — May 13, 2025 Minutes (approved) (480 KB) NEW

Includes the board's request that the Planning Commission look into short-term rentals and recommend action. The minutes do not mention solar.

Caledonia Township Board · retrieved 2026-08-13 from https://caledoniatwp.net/wp-content/uploads/2026/08/Meeting-approved-minutes-5-13-25-1.pdf
sha256 5e57e66b6fd9f1d230d62afa2046aff467320056e83228aa3137dea582c91bae

What is not mirrored: news coverage (Alpena News, Bridge Michigan, WMUK and others) remains copyrighted — the briefing links and quotes it instead. The Michigan Supreme Court leave application (MSC No. 170249, filed June 18, 2026, pending) is not publicly posted by the courts.