SLUP Cover Letter (143 KB)
Consumers Energy's cover letter submitting the Special Land Use Permit application to Harrisville Township.
Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 2c0ab587900bf1bf31762f215f51ab9a9a875a86a07e4240f92d82363dbe81a6
Special Use Permit Summary (694 KB)
The application's own summary of the project: capacity, acreage, components, and how it claims to meet each ordinance standard.
Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 6d3a0d085f272c80dcf52950f2474e0635a5f1211280db188c6d1a18d2fe24ca
Exhibit A — Landowner Documents (7.9 MB)
Easement and participation documents for the ten parcels enrolled in the Harrisville Township portion.
Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 e5e027d5ed65e951b3a2197ceba99dfd60fffe3cd118233b0b6a8bf51548ae26
Exhibit B — Site Plan (129.7 MB)
Full engineering site plan: array layout, setbacks, cable routes, roads, fencing. The largest and most detailed document in the file.
Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 d68882e5272c15fd2a27d621010eb5d2e80f90f500217537332f8ee5a9bbe7a6
Exhibit C — Glare Study (4.1 MB)
The disputed glare analysis. The opposition letter's strongest technical critique targets this study's 5.5-ft panel-height assumption.
Burns & McDonnell for Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 927ab948e7423d4d4d64e833ee9d54f72e33053a657c6059163b7b043c9c9b38
Exhibit D — Operations & Maintenance Plan (548 KB)
How the facility would be operated, inspected, and maintained over its 30-year term.
Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 8274eb3588b3b86e7599a9572f27893caa8892016f42ba2434df39dcefabb140
Exhibit E — Emergency Response Plan (778 KB)
Fire, spill, and emergency procedures for the solar station.
Consumers Energy · Aug 2025 / June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 60bc3fbf6cfb415048db00e6fce04a1bbd038f774a771fe11715798338e4a618
Exhibit F — Preconstruction Sound Study (12.7 MB)
The noise model for 25 inverter/transformer sources — the study whose 5-ft receptor height the opposition letter contests.
Burns & McDonnell for Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 9a97b02459cd677312b77188ab2135db132629ad486ea309e8705dfeb388e32a
Exhibit G — Decommissioning Plan (5.3 MB)
What removal and site restoration would involve after the project's life, and its cost basis.
Black & Veatch for Consumers Energy · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 7e0a03f7845df12069ec54cf1db6318245237065687e089d457eaa7097cb4aea
Letter — Preemption of Local Groundwater Regulation (117 KB)
The developer-side letter arguing Michigan law preempts township groundwater requirements — the legal fight in miniature, already in the file.
Consumers Energy counsel · June 2026 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 9bf134a84c70c267f8180b57988c9433ec6d156e80ff190c2102a19dba011d11
Grobbel Comment Letter (fact-checked in our briefing) (6.9 MB)
The 26-page public comment urging denial: ten findings on wetlands, glare, noise, and the missing master plan. Read alongside our claim-by-claim fact-check.
Grobbel Environmental & Planning Associates · July 26, 2026 · retrieved 2026-08-07 from Public comment to Harrisville Township
sha256 9423c7409ed9b5408493384e5fd949dfdab3282c0ac135698eb1e3d7726832a4
Gustin Solar Report Harrisville Final 072926 (433 KB) NEW
Captured automatically within hours of appearing on harrisvilletownship.com and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
harrisvilletownship.com · retrieved 2026-08-12 from harrisvilletownship.com
sha256 8aa559928d545ca759b7e7767b01a0696fadb5077055392ed18f0f33dddf763f
Gustin Solar Grobbel 7 26 26 (48.4 MB) NEW
Captured automatically within hours of appearing on harrisvilletownship.com and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
harrisvilletownship.com · retrieved 2026-08-12 from harrisvilletownship.com
sha256 b7da228b7ea038ccc2800c31acedf9975d74e2846ef84fc0cc967727d3aa91f1
Harrisville Township Zoning Ordinance (1.0 MB)
The comprehensive May 2025 rewrite — the ordinance this application is judged against.
Harrisville Township · May 14, 2025 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 5cb9fe82e46297cd9192218cc1f4e0aef6a5affe6b9a6cf312cad61f0dde69c3
Zoning Ordinance Update (122 KB)
December 2025 amendments to the rewritten ordinance.
Harrisville Township · Dec 2025 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 a2baf961b6fc7fe67ff33ff685732cb493a2c423351572a26b691907d4ae02e8
Solar Ordinance 2-2023 (282 KB)
The township's original solar-specific zoning amendment, adopted before Gustin Solar surfaced.
Harrisville Township · 2023 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 8b117030b99399c1ff3253ebcff52e5808eb2ff211a49c0ac43ccf01c3b3d39a
Township Zoning Map (620 KB)
The zoning map (effective Feb 14, 2014) showing the Agricultural district where all ten parcels sit.
Harrisville Township · 2014 · retrieved 2026-08-07 from https://harrisvilletownship.com/zoning/
sha256 c4b409f002b67844892fb74f8fb75faca898dec13f2c572f6205988f655f1875
Public Act 233 of 2023 (full text) (199 KB)
The law that changes everything: MPSC siting authority for solar ≥50 MW, the CREO rules, and the state default standards.
Michigan Legislature · Nov 2023 · retrieved 2026-08-07 from https://www.legislature.mi.gov/
sha256 f6c0877e099e2ec6a359b83cc300ae1a8895ef3ddce00293664d91b951d03dd0
MPSC Act 233 Filing Requirements (619 KB)
How a developer actually files at the Public Service Commission if local review fails or is bypassed.
Michigan Public Service Commission · 2024 · retrieved 2026-08-07 from https://www.michigan.gov/mpsc/
sha256 961a948e9e0475bf9a61b63ea4e7f0675b6f7de97cea195aa9bf03a5088b4c98
Sapling Solar — Application Narrative (505 KB)
Ranger Power's original 215 MW proposal in Gustin Township (Oct 2024), later absorbed into Gustin Solar.
Ranger Power · Oct 2024 · retrieved 2026-08-07 from gustintwp.com (mirrored by alconaconservatives.com)
sha256 fcbbb7380a71452d6372e8c17134c62a4da1e0c58f585508025222a170ef1133
Sapling Solar — Local Permitting & Benefits (993 KB)
The predecessor project's community-benefits pitch, including the >$12M lifetime tax revenue claim.
Ranger Power · Oct 2024 · retrieved 2026-08-07 from https://gustintwp.com/
sha256 bbd793c3c408cf5448ba0967422ae60fdd99b8e1b7838a27efbe021bb4140377
Meeting Approved Minutes 7 14 26 (454 KB) NEW
Captured automatically within hours of appearing on caledoniatwp.net and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
caledoniatwp.net · retrieved 2026-08-18 from caledoniatwp.net
sha256 ea65d6718bc937b127e954a922656b8f38fb77e2e4aca1ed4dbf548a69cc3cd9
Meeting Draft Minutes 8 11 26 (102 KB) NEW
Captured automatically within hours of appearing on caledoniatwp.net and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
caledoniatwp.net · retrieved 2026-08-18 from caledoniatwp.net
sha256 943a3ce6f4b5903060cdb18f76ec9bcfc1ff3a206af001348fde697ee6fc7683
8.2026 Bills To Be Paid (43 KB) NEW
Captured automatically within hours of appearing on caledoniatwp.net and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
caledoniatwp.net · retrieved 2026-08-18 from caledoniatwp.net
sha256 83fe0446ebc89d4dd7c8876e81050690d578f16eb040fc5a76ccb9848ae41a9e
Meeting Approved Minutes 5 13 25 1 (480 KB) NEW
Captured automatically within hours of appearing on caledoniatwp.net and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
caledoniatwp.net · retrieved 2026-08-13 from caledoniatwp.net
sha256 5e57e66b6fd9f1d230d62afa2046aff467320056e83228aa3137dea582c91bae
Meeting Approved Minutes 4 8 25 1 (481 KB) NEW
Captured automatically within hours of appearing on caledoniatwp.net and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
caledoniatwp.net · retrieved 2026-08-13 from caledoniatwp.net
sha256 3a2e89a79ff641b7515ab3bf9bccfc5b2221c3a741a8a1687460ffa1a642ac22
July 2026 (17 KB) NEW
Captured automatically within hours of appearing on caledoniatwp.net and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
caledoniatwp.net · retrieved 2026-08-08 from caledoniatwp.net
sha256 c5d1842f49b6b27fd99db581b7bf24e505293896013d2919b2b6ec5d0ac9e1c0
Gustin Twp. Planning Commission — Aug 6 Meeting Minutes (pending)
The record of last night's meeting on "final action" for the Gustin Solar application — the single most consequential document in the pipeline.
Projected: mid-to-late August 2026 (minutes are typically approved at the following meeting). This page updates automatically when it publishes.
Harrisville Twp. Planning Commission — Agenda & Minutes (pending)
The Harrisville side of the application: its commission meets the first Wednesday of even months — next regular session October 7, 2026.
Projected: agenda late September; minutes mid-October 2026. Auto-added on publication.
Michigan Supreme Court — Order on Leave to Appeal (MSC 170249) (pending)
Whether the state's top court will take the PA 233 local-control fight — the ruling that defines how much say townships keep.
Projected: fall 2026 (leave decisions commonly take 3–6 months). Auto-added when the court posts an order.
Court of Appeals Opinion — In re Implementing Provisions of PA 233 (Almer Twp. v. MPSC) (553 KB)
The published May 7, 2026 opinion (with its May 14 amending order, page 1) that largely upheld MPSC siting authority while restoring broader CREO eligibility. Affirmed in part, reversed in part, remanded. COA No. 373259.
Michigan Court of Appeals · May 7, 2026 · retrieved 2026-08-07 from courts.michigan.gov
sha256 9e9510dec2742b09551a564c20939a16c8903cf00bae5a366ec785320d437809
Court of Appeals Order — Preliminary Injunction Denied (270 KB)
The January 14, 2025 order refusing to pause the MPSC's PA 233 process while the townships' challenge proceeded.
Michigan Court of Appeals · Jan 14, 2025 · retrieved 2026-08-07 from courts.michigan.gov
sha256 7d629fdebb59227f14fee871fd6bb43b158ce5b85dcfc14893fd58727c857bad
Gustin Township Battery Energy Storage Systems Ordinance No 1 Of 2025 Website (4.7 MB) NEW
Captured automatically within hours of appearing on gustintwp.gov and mirrored unaltered — the fingerprint below proves it. Editor's note to follow.
gustintwp.gov · retrieved 2026-08-15 from gustintwp.gov
sha256 e6882b9dfb74da76b2c04f237fd03de1477294ea91a73ebe884bc52be2959744
Gustin Twp. Planning Commission — Notice for the Aug 6, 2026 Meeting (35 KB)
Notice relocating the meeting to The Sunrise Center (Lincoln) for expected crowds — agenda: un-table and potentially take FINAL ACTION on the Gustin Solar special land use application.
Gustin Township · Aug 2026 · retrieved 2026-08-07 from gustintwp.gov
sha256 2baf47a412560db29df966a6315e32b1fd2e827819883e148ef99cfb229931f8
What is not mirrored: news coverage (Alpena News, Bridge Michigan, WMUK and others) remains copyrighted — the briefing links and quotes it instead. The Michigan Supreme Court leave application (MSC No. 170249, filed June 18, 2026, pending) is not publicly posted by the courts. The outcome of Gustin Township’s August 6 meeting will be added when minutes publish.