Michigan Energy Files · Tracker
Michigan energy project tracker
Every project in the Energy Files and every case on the Michigan Public Service Commission's list of current siting applications, as of October 1, 2026. Each row links to the record it comes from. Rows without a primary source are not published.
Dates: every dated event in these files, past and scheduled, is on the meeting calendar, with a calendar feed.
About the dates: eleven of the twelve MPSC cases carry only the date we captured the commission's table (Oct 1, 2026), so the map shows them from that date. Their earlier filing dates are not yet in our records, so the map is sparse before today.
Michigan Energy Files · the tracker
Where the tracked projects stand
16 utility-scale energy projects in 15 Michigan counties, as of Oct 1, 2026: the 12 cases on the Michigan Public Service Commission’s siting table and 4 projects followed from township and county records.
Auto-play is off because your device asks for reduced motion. Use the slider or the event buttons.
Legend
- Announced, no application 1
Named by the developer; no application found in any record. - Under local review 1
An application is before a township or county body. - Approved locally 0
A township or county body approved it. - At the MPSC 10
An application is on the Michigan Public Service Commission’s siting table and not decided. - MPSC certificate granted 1
The MPSC table lists the case as “Certificate Granted”. - Withdrawn 1
The applicant withdrew the application. - Local moratorium 1
The county or township has paused new applications. - Not yet verified 1
No record establishes a status. - Outer ring
Parts of the project have different outcomes; see its card.
Pins mark the county, not the site. Each pin sits at the centre of the project’s county; projects that share a county are set side by side, and a project in two counties sits between them. Counties with a tracked project are tinted.
Projects by status
Announced, no application 1
Under local review 1
At the MPSC 10
- Birch Valley SolarTuscola County
- Fiddlehead SolarEaton and Jackson counties
- Glacier Meadows SolarLenawee County
- Headland SolarLivingston County
- Lakeside SolarMuskegon County
- Otisville SolarGenesee County
- Riverbend WindSanilac County
- Rouget Road SolarLenawee County
- Silver Maple SolarOttawa County
- Washtenaw Solar EnergyWashtenaw County
MPSC certificate granted 1
Withdrawn 1
Local moratorium 1
Not yet verified 1
How to read this
Each pin is one tracked project. Its shape and colour show where it stands in the approval process; they say nothing about whether the project is good or bad. Select a pin to see the developer, size, townships, the status in the source’s own words, the next dated event and a link to the record.
The slider moves the map back in time. A pin appears on the date of the first dated record we hold for that project, which is not always the date the project began. The state’s table gives no filing dates, so 11 of the 12 state cases and Munro Solar appear only on the date that table was captured.
Sources: Michigan Public Service Commission, “Current Siting Applications” table, captured Oct 1, 2026 (mirrored copy, live page); township and county records linked in each row of the table below. County outlines: U.S. Census Bureau cartographic boundary file, 2023. Compiled Oct 1, 2026. Inside Michigan takes no position for or against any project.
Every tracked project
Michigan Energy Files · pipeline counter
Megawatts by status
2,481 MW in the bar, from 13 of 16 tracked projects.
1 MW less than the sum of the table below, because Gustin Solar is counted here by part.
3 projects have no verified megawatt figure and are not in the bar: Caledonia Solar, Logan Solar, Munro Solar.
Announced, no applicationno verified MW · 1 project
- Caledonia Solar, no verified MW figure · Alcona County · Consumers Energy · Solar
Source: Caledonia Twp. minutes, Aug 31, 2026 (draft) · verified Oct 1, 2026
- Caledonia Solar, no verified MW figure · Alcona County · Consumers Energy · Solar
Under local review94 MW · part of 1 project
- Gustin Solar, part: Under review in Harrisville Township, 94 MW · Alcona County · Consumers Energy · Solar
Source: Harrisville Twp. permit summary · verified Oct 3, 2026
- Gustin Solar, part: Under review in Harrisville Township, 94 MW · Alcona County · Consumers Energy · Solar
Approved locally215 MW · part of 1 project
- Gustin Solar, part: Approved Dec 2, 2024 (Sapling Solar), 215 MW · Alcona County · Consumers Energy · Solar
Source: Gustin Twp. application, May 15, 2026, p. 1207 · verified Oct 3, 2026
- Gustin Solar, part: Approved Dec 2, 2024 (Sapling Solar), 215 MW · Alcona County · Consumers Energy · Solar
Denied locally25 MW · part of 1 project
- Gustin Solar, part: Addition denied Aug 6, 2026, 25 MW · Alcona County · Consumers Energy · Solar
Source: Gustin Twp. application, May 15, 2026, p. 1207 · verified Oct 3, 2026
- Gustin Solar, part: Addition denied Aug 6, 2026, 25 MW · Alcona County · Consumers Energy · Solar
At the MPSC1,907 MW · 10 projects
- Birch Valley Solar, 162 MW · Tuscola County · Ranger Power · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Fiddlehead Solar, 225 MW · Eaton and Jackson counties · Hecate Energy Springport Solar, LLC · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Glacier Meadows Solar, 200 MW · Lenawee County · Ørsted Onshore North America · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Headland Solar, 220 MW · Livingston County · Ranger Power · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Lakeside Solar, 150 MW · Muskegon County · Geronimo Power · Solar + storage
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Otisville Solar, 125 MW · Genesee County · EDF · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Riverbend Wind, 300 MW · Sanilac County · REV Renewables · Wind
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Rouget Road Solar, 175 MW · Lenawee County · RWE · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Silver Maple Solar, 200 MW · Ottawa County · RWE · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026 - Washtenaw Solar Energy, 150 MW · Washtenaw County · Invenergy · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026
- Birch Valley Solar, 162 MW · Tuscola County · Ranger Power · Solar
MPSC certificate granted90 MW · 1 project
- Acceleration Solar, 90 MW · Ingham County · Ranger Power · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026
- Acceleration Solar, 90 MW · Ingham County · Ranger Power · Solar
Withdrawn150 MW · 1 project
- Walker Road Solar, 150 MW · Clinton County · RWE · Solar
Source: MPSC siting table, captured Oct 1, 2026 · verified Oct 1, 2026
- Walker Road Solar, 150 MW · Clinton County · RWE · Solar
Local moratoriumno verified MW · 1 project
- Logan Solar, no verified MW figure · Ogemaw County · Consumers Energy · Solar
Source: Ogemaw County Resolution 26-134 · verified Oct 1, 2026
- Logan Solar, no verified MW figure · Ogemaw County · Consumers Energy · Solar
Not yet verifiedno verified MW · 1 project
- Munro Solar, no verified MW figure · Cheboygan County · Consumers Energy · Solar
Source: Inside Michigan projects page (no primary record yet) · verified Oct 1, 2026
- Munro Solar, no verified MW figure · Cheboygan County · Consumers Energy · Solar
Gustin is counted by part: 215 MW approved, 25 MW denied, 94 MW under review, 334 MW in all. Consumers' application gives 241 MWac for the Gustin side (site plan; p. 237); added together, the approval and the addition are 240 MWac (p. 1208). Lakeside Solar’s 150 MW / 600 MWh battery is listed by the MPSC and is not added.
How to read this: The bar’s length is the verified megawatts of the projects selected. Each block is one status, in the order the tracker lists them, sized by its megawatts and marked with its own pattern. A project whose parts have different outcomes is counted part by part. Blocks under 2 percent of the bar are drawn at 2 percent so they stay visible. Open a status to see its projects and the record for each. Every project, with or without a verified figure, is in the table below.
Data generated Oct 1, 2026; status as of Oct 1, 2026. Source: /data/projects.json, the data behind the project tracker, where each project’s record is linked. Inside Michigan takes no position for or against any project.
| Project | Type | MW | County and townships | Status | Next date | Source · verified |
|---|---|---|---|---|---|---|
| Acceleration SolarRanger Power · U-21932Tracker only | Solar | 90 | InghamLeslie, Onondaga, Vevay Twps. | MPSC certificate grantedMPSC table status: “Certificate Granted”. The Commission approved a settlement agreement on Aug 27, 2026. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-21932Verified Oct 1, 2026 |
| Birch Valley SolarRanger Power · U-22072Tracker only | Solar | 162 | TuscolaArbela Twp. | At the MPSCMPSC table status: “Schedule suspended; Case paused”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22072Verified Oct 1, 2026 |
| Caledonia SolarConsumers EnergyFull file | Solar | Not verified117 MW per the developer’s listing, not an application | AlconaCaledonia Twp. | Announced, no applicationNo application filed. Planning Commission minutes of Aug 31, 2026: “nothing has been submitted in Caledonia Township at this time.” | None in the record | Caledonia Twp. minutes, Aug 31, 2026 (draft)Verified Oct 1, 2026 |
| Fiddlehead SolarHecate Energy Springport Solar, LLC · U-22041Tracker only | Solar | 225 | Eaton and JacksonBrookfield, Hamlin, Springport Twps. | At the MPSCMPSC table status: “Incomplete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22041Verified Oct 1, 2026 |
| Glacier Meadows SolarØrsted Onshore North America · U-22044Tracker only | Solar | 200 | LenaweeBlissfield, Deerfield Twps. | At the MPSCMPSC table status: “Under Review, Complete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22044Verified Oct 1, 2026 |
| Gustin SolarConsumers EnergyFull file | Solar | 335Gustin Twp.: 215 + 25; Harrisville Twp.: 94 | AlconaGustin, Harrisville Twps. | Under local reviewGustin Township: 215 MW approved Dec 2, 2024; 25 MW addition denied Aug 6, 2026. Harrisville Township: 94 MW under review; the Planning Commission next meets Oct 7, 2026. | Oct 7, 2026Harrisville Twp. Planning Commission meets, 7 p.m. | Gustin Twp. minutes, Aug 6, 2026Verified Oct 3, 2026 |
| Headland SolarRanger Power · U-22004Tracker only | Solar | 220 | LivingstonCohoctah, Conway Twps. | At the MPSCMPSC table status: “Under Review, Complete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22004Verified Oct 1, 2026 |
| Lakeside SolarGeronimo Power · U-22143Tracker only | Solar + storage | 150plus a 150 MW / 600 MWh battery | MuskegonWhite River Twp. | At the MPSCMPSC table status: “Incomplete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22143Verified Oct 1, 2026 |
| Logan SolarConsumers EnergyTracker only | Solar | Not verified | OgemawTownship not verified | Local moratoriumOgemaw County adopted a one-year moratorium on new solar, wind, battery-storage and data-center applications on Aug 27, 2026 (Resolution 26-134). Its effective date, and whether it covers Logan Township, are not yet confirmed. | None in the record | Ogemaw County Resolution 26-134Verified Oct 1, 2026 |
| Munro SolarConsumers EnergyTracker only | Solar | Not verified | CheboyganTownship not verified | Not yet verifiedThe site’s projects page lists it as “A Consumers Energy project in Cheboygan County. Records collection has begun.” No primary record is mirrored yet. | None in the record | Inside Michigan projects page (no primary record yet)Verified Oct 1, 2026 |
| Otisville SolarEDF · U-21956Tracker only | Solar | 125 | GeneseeForest, Thetford Twps. | At the MPSCMPSC table status: “Under Review, Complete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-21956Verified Oct 1, 2026 |
| Riverbend WindREV Renewables (The MPSC docket link in the table names MI Energy Developments LLC as the applicant.) · U-22036Tracker only | Wind | 300 | SanilacElk, Fremont, Speaker Twps. | At the MPSCMPSC table status: “Under Review, Complete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22036Verified Oct 1, 2026 |
| Rouget Road SolarRWE · U-22003Tracker only | Solar | 175 | LenaweePalmyra Twp. | At the MPSCMPSC table status: “Under Review”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22003Verified Oct 1, 2026 |
| Silver Maple SolarRWE · U-22071Tracker only | Solar | 200 | OttawaJamestown, Zeeland Twps. | At the MPSCMPSC table status: “Under Review”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22071Verified Oct 1, 2026 |
| Walker Road SolarRWE · U-22130Tracker only | Solar | 150 | ClintonBingham Twp. | WithdrawnMPSC table status: “Application withdrawn”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-22130Verified Oct 1, 2026 |
| Washtenaw Solar EnergyInvenergy · U-21962Tracker only | Solar | 150 | WashtenawSaline Twp. | At the MPSCMPSC table status: “Under Review, Complete Application”. | None in the record | MPSC siting table, captured Oct 1, 2026MPSC docket U-21962Verified Oct 1, 2026 |
No projects match these filters.
Status as of Oct 1, 2026. “Verified” is the date the row was last checked against the linked record. An empty MW cell means no primary record in our mirror states the figure. The MPSC table gives no filing dates, so most state cases have no dated next step.
Note: the table always shows each project's status as of today; the map follows the slider.