[{"id":3395348,"projectNumber":"J4182","queueDate":"2025-10-08T00:37:52+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"ERAS Study Cycle 2","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395349,"projectNumber":"J4176","queueDate":"2025-10-06T23:46:01+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"","state":"","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"","summerNetMW":1750.0,"winterNetMW":1750.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395350,"projectNumber":"J4179","queueDate":"2025-10-07T20:34:28+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":735.0,"winterNetMW":735.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395351,"projectNumber":"J4184","queueDate":"2025-10-07T20:25:22+00:00","inService":"2030-02-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":755.0,"winterNetMW":755.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395352,"projectNumber":"J4186","queueDate":"2025-10-07T19:20:31+00:00","withdrawnDate":"2026-07-01T04:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1540.0,"winterNetMW":1540.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395353,"projectNumber":"J4177","queueDate":"2025-10-07T23:07:23+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":735.0,"winterNetMW":735.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395354,"projectNumber":"J4183","queueDate":"2025-10-07T01:41:17+00:00","inService":"2027-04-28T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"","state":"","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"","summerNetMW":99.9,"winterNetMW":99.9,"dp1ErisMw":23.0,"dp1NrisMw":23.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395355,"projectNumber":"J4180","queueDate":"2025-10-07T20:00:44+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":755.0,"winterNetMW":755.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395356,"projectNumber":"J4175","queueDate":"2025-10-07T19:08:44+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395357,"projectNumber":"J4181","queueDate":"2025-10-07T20:21:33+00:00","withdrawnDate":"2026-04-28T04:00:00+00:00","inService":"2030-02-01T05:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":755.0,"winterNetMW":755.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395358,"projectNumber":"J4146","queueDate":"2025-09-06T01:17:28+00:00","inService":"2028-08-04T04:00:00+00:00","negInService":"2028-08-04T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"","state":"","studyCycle":"0MW GIA","studyGroup":"NA","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395359,"projectNumber":"J3833","queueDate":"2024-10-01T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Cass","state":"ND","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Buffalo 115 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395360,"projectNumber":"J3487","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CAYUGA 345","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395361,"projectNumber":"J4187","queueDate":"2025-10-07T20:12:47+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":755.0,"winterNetMW":755.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395362,"projectNumber":"J4185","queueDate":"2025-10-07T19:50:56+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":755.0,"winterNetMW":755.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395363,"projectNumber":"J3464","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fernald","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395364,"projectNumber":"J3834","queueDate":"2024-09-19T04:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Gibson","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta - Francisco 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395365,"projectNumber":"J3463","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-06-09T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Jefferson","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LORMAN SS (CE) - FAYETTE 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395366,"projectNumber":"J3462","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-06-04T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tama","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Dysart - Traer 161kV","summerNetMW":187.0,"winterNetMW":187.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395367,"projectNumber":"J3461","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Muscatine","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SUB 56 - SUB 89 161.0kV","summerNetMW":156.0,"winterNetMW":156.0,"dp1ErisMw":156.0,"dp1NrisMw":156.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395368,"projectNumber":"J3485","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RAPSON","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395369,"projectNumber":"J3483","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4RANTOUL  - 4RISING   138.0kV","summerNetMW":137.4,"winterNetMW":137.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395370,"projectNumber":"J3482","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Other_","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395371,"projectNumber":"J3484","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-02-28T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"EL DORADO EHV - SAREPTA 345/115 SS 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395372,"projectNumber":"J4178","queueDate":"2025-10-07T19:42:02+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":755.0,"winterNetMW":755.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395373,"projectNumber":"J3831","queueDate":"2024-10-08T04:00:00+00:00","withdrawnDate":"2025-12-22T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Madison","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Noblesville (Duke) - Fall Creek (AEP/PJM) 345.0kV","summerNetMW":215.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395374,"projectNumber":"J3832","queueDate":"2024-07-30T04:00:00+00:00","withdrawnDate":"2025-12-22T05:00:00+00:00","inService":"2028-04-05T04:00:00+00:00","transmissionOwner":"ITC","county":"Macomb","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lenox 120kV Substation (Bus #264749)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395375,"projectNumber":"J3486","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Muskegon","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rogers 138 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395376,"projectNumber":"J3490","queueDate":"2024-03-21T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Caldwell","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Caldwell County","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395377,"projectNumber":"J3491","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-04-11T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Gibson (Duke Terminal) 345.0kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395378,"projectNumber":"J3492","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-04-11T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Gibson (Duke Terminal) 345.0kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395379,"projectNumber":"J3337","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Stoddard","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"5VANDUSER","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395380,"projectNumber":"J3402","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Juneau","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"New J1502 TO Switching Station (Emerson)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395381,"projectNumber":"J3457","queueDate":"2024-04-12T04:00:00+00:00","inService":"2027-02-28T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":215.0,"winterNetMW":215.0,"dp1ErisMw":215.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395382,"projectNumber":"J3319","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SAREPTA 345/115 SS","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395383,"projectNumber":"J3336","queueDate":"2024-04-05T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RINGLE","summerNetMW":41.8,"winterNetMW":41.8,"dp1ErisMw":41.8,"dp1NrisMw":41.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395384,"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Hamilton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hamilton","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":202.19,"dp1NrisMw":202.19,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395385,"projectNumber":"J3792","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"ERIS","poiName":"ALMA - VESTABURG 138.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395386,"projectNumber":"J3794","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Daviess","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Daviess County - Utica 69.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395387,"projectNumber":"J3793","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"East Leesville - Rodemacher 230.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395388,"projectNumber":"J3798","queueDate":"2024-03-27T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Winnebago","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bison - Colby 345kV","summerNetMW":320.0,"winterNetMW":320.0,"dp1ErisMw":320.0,"dp1NrisMw":320.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395389,"projectNumber":"J3499","queueDate":"2024-04-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Kosciusko","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LEESBURG - DEEDSVILLE (DUKE) 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395390,"projectNumber":"J3297","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"St. Clair","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Herzog","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395391,"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Towerline","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395392,"projectNumber":"J3488","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CAYUGA 345","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395393,"projectNumber":"J3493","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"McDonough","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395394,"projectNumber":"J3335","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":222.0,"winterNetMW":222.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395395,"projectNumber":"J3334","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"LaPorte","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MAPLE","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395396,"projectNumber":"J3802","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-04T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RITCHIE SWYD - TARLETON 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395397,"projectNumber":"J3776","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TittabawASSEe","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395398,"projectNumber":"J3777","queueDate":"2024-04-12T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Cheboygan","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MC GULPIN - RIGGSVILLE (MILL CREEK) 138.0kV","summerNetMW":91.8,"winterNetMW":91.8,"dp1ErisMw":91.8,"dp1NrisMw":91.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395399,"projectNumber":"J3779","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-08-13T04:00:00+00:00","inService":"2026-10-15T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Henderson","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395400,"projectNumber":"J3400","queueDate":"2024-03-20T04:00:00+00:00","inService":"2028-04-19T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Deuel","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Astoria 345kV substation","summerNetMW":142.2,"winterNetMW":142.2,"dp1ErisMw":142.2,"dp1NrisMw":142.2,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395401,"projectNumber":"J3407","queueDate":"2024-04-11T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Manistee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LINDEMAN - TIPPY 138.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395402,"projectNumber":"J3795","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Knox","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7FABIUS - 7MAYWOOD 345.0kV","summerNetMW":91.0,"winterNetMW":91.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395403,"projectNumber":"J3797","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Edgar","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7KANSAS   - 08SUGCRK 345.0kV","summerNetMW":141.23,"winterNetMW":141.23,"dp1ErisMw":141.23,"dp1NrisMw":109.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395404,"projectNumber":"J3456","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"San Jose Rail Switching Station","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395405,"projectNumber":"J3293","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395406,"projectNumber":"J3294","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-16T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Daviess","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GPC Primary - Sandborn Primary 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395407,"projectNumber":"J3778","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-08-15T04:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES - TRANSMISSION","county":"Otter Tail","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fergus Falls MRES/WMMPA","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395408,"projectNumber":"J3498","queueDate":"2024-04-13T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Knox","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395409,"projectNumber":"J3608","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"New Castle I Avenue","summerNetMW":77.6,"winterNetMW":77.6,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395410,"projectNumber":"J3502","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ARGENTA - PALISADES 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395411,"projectNumber":"J3548","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-07-09T04:00:00+00:00","inService":"2027-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Marshall","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Laurel","summerNetMW":62.0,"winterNetMW":62.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395412,"projectNumber":"J3372","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macoupin","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rezzy","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395413,"projectNumber":"J3295","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cole - Penton Road 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395414,"projectNumber":"J3299","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEVIL","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395415,"projectNumber":"J3824","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2024-06-28T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Roberts","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Twin Brooks 345 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395416,"projectNumber":"J3500","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CHISAGO COUNTY","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395417,"projectNumber":"J3549","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Mower","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NOT IN DROPDOWN MENU","summerNetMW":484.5,"winterNetMW":515.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395418,"projectNumber":"J3550","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Dubois","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Duff - Dubois 138.0 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395419,"projectNumber":"J3574","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Wayne","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395420,"projectNumber":"J3612","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fisher - Many 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395421,"projectNumber":"J3614","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ashley","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CROSSETT NORTH - HAMBURG 115.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395422,"projectNumber":"J3610","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-03-25T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Tyler","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DOUCETTE","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395423,"projectNumber":"J3671","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-07-27T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4NEOGA 2 - 4SHELBYVL E 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395424,"projectNumber":"J3501","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Wexford","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"KEYSTONE - TIPPY 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395425,"projectNumber":"J3544","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-09T04:00:00+00:00","inService":"2027-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tama","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Abbott","summerNetMW":62.0,"winterNetMW":62.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395426,"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mahaska","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEACON","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395427,"projectNumber":"J3611","queueDate":"2024-04-18T04:00:00+00:00","inService":"2026-12-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Hamilton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7W_FRFT_E - 7NORRIS   345.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395428,"projectNumber":"J3609","queueDate":"2024-04-02T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-12-27T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Beauregard","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"NELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV","summerNetMW":93.1,"winterNetMW":93.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395429,"projectNumber":"J3672","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-10-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Big Stone","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Big Stone South - Alexandira 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395430,"projectNumber":"J3690","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Scott","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5STODDARD - 5MORLEY (AECI) 161.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395431,"projectNumber":"J3708","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2027-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LEGEND","summerNetMW":735.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395432,"projectNumber":"J3709","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-31T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Marion","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Georgetown","summerNetMW":47.0,"winterNetMW":47.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395433,"projectNumber":"J1896","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Henderson to AB Brown 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395434,"projectNumber":"J2125","queueDate":"2021-08-21T04:00:00+00:00","withdrawnDate":"2024-08-16T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Xenia to W Mt Vernon 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395435,"projectNumber":"J2144","queueDate":"2021-09-02T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Jasper","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Schahfer 345 kV Sub","summerNetMW":155.2,"winterNetMW":195.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395436,"projectNumber":"J2286","queueDate":"2021-07-14T04:00:00+00:00","withdrawnDate":"2021-09-10T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Praire - Winger 230kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395437,"projectNumber":"J3725","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Louisa","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SUB 93 LOUISA - SUB T HASKINS 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395438,"projectNumber":"J3682","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"ERIS","poiName":"FOUR MILE - WHITE ROAD 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395439,"projectNumber":"J3701","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Taylor","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"ORIENT - NORTHBORO 345.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395440,"projectNumber":"J3715","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Jackson","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395441,"projectNumber":"J2207","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Henderson to AB Brown 138 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395442,"projectNumber":"J2182","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2021-09-17T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tallahatchie","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"webb 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395443,"projectNumber":"J3404","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-08-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395444,"projectNumber":"J3607","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"New Castle I Avenue","summerNetMW":47.4,"winterNetMW":47.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395445,"projectNumber":"J3613","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ashley","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CROSSETT NORTH - HAMBURG 115.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395446,"projectNumber":"J3615","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STUTTGART NORTH SS - STUTTGART RICUSKEY 115.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395447,"projectNumber":"J3669","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-02-01T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Stevens","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Big Stone South - Alexandria 345.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395448,"projectNumber":"J3691","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REYNOLDS","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395449,"projectNumber":"J3692","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"METC","county":"Cheboygan","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PORT CALCITE - RIGGSVILLE 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395450,"projectNumber":"J3724","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"","county":"Vigo","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sandford","summerNetMW":132.0,"winterNetMW":132.0,"dp1ErisMw":132.0,"dp1NrisMw":132.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395451,"projectNumber":"J3733","queueDate":"2024-05-25T04:00:00+00:00","inService":"2028-04-17T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Gibson","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Oakland City  - Old Ben Coal 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":""},{"id":3395452,"projectNumber":"J3405","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-06-09T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"St. Louis","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Shannon - Minntac 230kV","summerNetMW":144.0,"winterNetMW":144.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395453,"projectNumber":"J3410","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-08-15T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7PR STATE - 7MTVERNW 345.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395454,"projectNumber":"J3409","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Newton","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"HARTBURG - CYPRESS 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395455,"projectNumber":"J3421","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SEASIDE","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395456,"projectNumber":"J3416","queueDate":"2024-03-21T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"VAN TYLE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395457,"projectNumber":"J3422","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lawrence","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SWIFTON - AECC HOXIE SOUTH 161.0kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395458,"projectNumber":"J2194","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom - Gibson 345 kV Line","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395459,"projectNumber":"J2076","queueDate":"2021-08-09T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"San Jacinto","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"COLEY CREEK to PELICAN ROAD 138 kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395460,"projectNumber":"J3447","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Perry","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Purvis Bulk 161 - Hintonville 161 161.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395461,"projectNumber":"J3423","queueDate":"2024-05-16T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-04T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PECAN ST - AECC BALCH 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395462,"projectNumber":"J3718","queueDate":"2024-03-20T04:00:00+00:00","withdrawnDate":"2025-12-24T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Greene","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Roodhouse West","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395463,"projectNumber":"J3727","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Madison","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mississippi","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395464,"projectNumber":"J3408","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HARTBURG - AEP LAYFIELD 500.0kV","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395465,"projectNumber":"J3418","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7AUSTIN - 7TURNER 345.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395466,"projectNumber":"J3450","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-23T04:00:00+00:00","inService":"2028-08-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Panola","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BATESVILLE [MS] - MOON LAKE SS 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395467,"projectNumber":"J3428","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"McPherson","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale 345 - Twin Brooks 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395468,"projectNumber":"J3247","queueDate":"2024-04-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SPELTERVILLE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395469,"projectNumber":"J3259","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-06T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Renville","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cedar Mountain","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395470,"projectNumber":"J3269","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2027-11-02T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Hamilton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7W_FRFT_E - 7NORRIS   345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395471,"projectNumber":"J2338","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"McPherson","state":"SD","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ellendale - Twin Brooks 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395472,"projectNumber":"J2326","queueDate":"2022-09-13T04:00:00+00:00","inService":"2025-10-28T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Outagamie","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Werner West","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395473,"projectNumber":"J2327","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"LaMoure","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ellendale 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395474,"projectNumber":"J3268","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REGAL","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395475,"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ogemaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GALLAGHER - TWINING 138.0kV","summerNetMW":290.0,"winterNetMW":290.0,"dp1ErisMw":290.0,"dp1NrisMw":290.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395476,"projectNumber":"J2342","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-05-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Worth County","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":150.0,"dp1NrisMw":141.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395477,"projectNumber":"J2336","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-08-29T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Union","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sterlington - Downsville 115 kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395478,"projectNumber":"J2333","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"McPherson","state":"SD","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ellendale - Twin Brooks 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395479,"projectNumber":"J2354","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marinette","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Crivitz","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395480,"projectNumber":"J3606","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PARKIN - KUHN ROAD 161.0kV","summerNetMW":197.7,"winterNetMW":197.7,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395481,"projectNumber":"J3670","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-03-13T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"LaSalle","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Corbin 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395482,"projectNumber":"J2103","queueDate":"2021-09-01T04:00:00+00:00","withdrawnDate":"2021-12-03T05:00:00+00:00","inService":"2024-10-04T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jasper","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Buna SW to Call Transmission Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395483,"projectNumber":"J3419","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SEASIDE","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395484,"projectNumber":"J3438","queueDate":"2024-03-26T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MURPHY","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395485,"projectNumber":"J3441","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Houston","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395486,"projectNumber":"J3449","queueDate":"2024-03-26T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pope","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MORRILTON EAST - ATKINS 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395487,"projectNumber":"J3240","queueDate":"2024-04-14T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395488,"projectNumber":"J2332","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lyon County - Cedar Mountain 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395489,"projectNumber":"J2343","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Marion","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Georgetown  - North 138.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":130.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395490,"projectNumber":"J2323","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Webster","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Webster-Lehigh 345kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395491,"projectNumber":"J2330","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"","county":"Leflore","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"GREENWOOD","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395492,"projectNumber":"J2339","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cocodrie-Forest Hill 230kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395493,"projectNumber":"J2335","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Plover 115 kV Substation (J1573 substation)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395494,"projectNumber":"J2341","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ricuskey-Woodward 230kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395495,"projectNumber":"J2340","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Rush","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RUSHVILLE 69 kV - HEMILROY 69 kV","summerNetMW":43.0,"winterNetMW":43.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395496,"projectNumber":"J2352","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Woodbury","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Raun - Lehigh 345 kV","summerNetMW":118.0,"winterNetMW":118.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395497,"projectNumber":"J2337","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-28T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"St. Francois","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"St. Francois 138kV 4ST FRANC 1 bus 345774","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395498,"projectNumber":"J2328","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Keo 500kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395499,"projectNumber":"J2345","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marathon","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gardner Park-Stone Lake 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395500,"projectNumber":"J2357","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lafourche","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Thibodaux 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395501,"projectNumber":"J2353","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REYNOLDS - BURR OAK 345.0kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":190.0,"dp1NrisMw":190.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395502,"projectNumber":"J2355","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-11-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Greene","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"A Tap on 4JERSEYVL-4ROODHSE","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395503,"projectNumber":"J2348","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Minden to Sarepta 115 kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395504,"projectNumber":"J3242","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-05-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Flint 138 kv","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395505,"projectNumber":"J3243","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Parke","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395506,"projectNumber":"J2356","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cash-Newport AB 161 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395507,"projectNumber":"J2331","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Franklin","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"West Frankfort East Substation 345kV","summerNetMW":127.0,"winterNetMW":127.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395508,"projectNumber":"J3249","queueDate":"2024-04-13T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Vanderburgh","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Elliott - Francisco 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395509,"projectNumber":"J3270","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-04T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC AUBREY - RITCHIE SWYD 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395510,"projectNumber":"J3342","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"J2192 POI","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395511,"projectNumber":"J3344","queueDate":"2024-04-13T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Knox","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395512,"projectNumber":"J3364","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Martin","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ST MARTINVILLE (L-625A) TAP - CADE SS 69.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395513,"projectNumber":"J3377","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Madison","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"DELHI - TALLULAH 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395514,"projectNumber":"J3379","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-02-18T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Johnson","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7JORD - 7MASS 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395515,"projectNumber":"J3435","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395516,"projectNumber":"J2346","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lyon County - Cedar Mountain 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395517,"projectNumber":"J2347","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Roscommon","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Higgins - Mio Dam 138 kV Line","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395518,"projectNumber":"J3437","queueDate":"2024-05-06T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Ogemaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LIVINGSTON - TITTABAWASSEE 345.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395519,"projectNumber":"J3452","queueDate":"2024-04-13T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395520,"projectNumber":"J3406","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2028-04-09T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Nelson - Carlyss (J2154 POI)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395521,"projectNumber":"J3411","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Randolph","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"5ADAIR    - 5THMHIL (AECI)  161.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395522,"projectNumber":"J3417","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-06T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Oreana","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395523,"projectNumber":"J3415","queueDate":"2024-03-18T04:00:00+00:00","withdrawnDate":"2025-07-24T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Mercer","state":"ND","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Coyote Switchyard","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395524,"projectNumber":"J3320","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-05-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ROOSEVELT","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395525,"projectNumber":"J3324","queueDate":"2024-04-18T04:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Palo Alto","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PALO ALTO - KOSSUTH COUNTY 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395526,"projectNumber":"J3420","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"McPherson","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale 345 - Twin Brooks 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395527,"projectNumber":"J3427","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DELL EHV - NEW MADRID (AECI) 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395528,"projectNumber":"J3444","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC PINEBERGEN","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395529,"projectNumber":"J3248","queueDate":"2024-04-13T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown - Farm Bureau 138.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395530,"projectNumber":"J3358","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"De Witt","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tabor","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395531,"projectNumber":"J3376","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Blytheville North","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395532,"projectNumber":"J3429","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pemiscot","state":"MO","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"JIM HILL - HAYTI SOUTH 161.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395533,"projectNumber":"J3439","queueDate":"2024-04-11T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Sherburne","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RICE LAKE SWITCH ELSM11 - ZIMMERMAN TAP - SS2858 - ELS1 69.0kV","summerNetMW":72.0,"winterNetMW":72.0,"dp1ErisMw":72.0,"dp1NrisMw":72.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395534,"projectNumber":"J3256","queueDate":"2024-04-13T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4GALLATIN - 4KANSAS   138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395535,"projectNumber":"J2325","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bastrop to Sterlington 115 kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395536,"projectNumber":"J2344","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Stutsman","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Jamestown 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395537,"projectNumber":"J2329","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wabash River-Whitesville South 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395538,"projectNumber":"J2351","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"","county":"Clay","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC RECTOR NORTH - RECTOR 161kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395539,"projectNumber":"J2350","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"WHITE BLUFF EHV - WRIGHTSVILLE 115.0kV","summerNetMW":115.5,"winterNetMW":115.5,"dp1ErisMw":115.5,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395540,"projectNumber":"J3443","queueDate":"2024-04-12T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Big Stone","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Big Stone South - Alexandira 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395541,"projectNumber":"J3446","queueDate":"2024-04-04T04:00:00+00:00","withdrawnDate":"2025-09-12T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Kent","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gaines substation 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395542,"projectNumber":"J2349","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Jackson","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Jackson to Campbell Hill 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395543,"projectNumber":"J3257","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Pulaski","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"EAST WINAMAC - MONTICELLO 138.0kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395544,"projectNumber":"R5098","queueDate":"2026-05-26T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395545,"projectNumber":"S1157","queueDate":"2026-04-13T22:36:28+00:00","inService":"2026-08-29T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"","state":"TX","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":534.0,"winterNetMW":534.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395546,"projectNumber":"S1171","queueDate":"2026-05-26T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"White Bluff EHV 500MW","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395547,"projectNumber":"J3266","queueDate":"2024-04-11T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-17T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Sargent","state":"ND","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Forman 230 kV Substation","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395548,"projectNumber":"J3315","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-07-09T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Pike","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"COLONIAL PIPELINE - FERNWOOD 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395549,"projectNumber":"J3359","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2030-12-31T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Eastern Substation 138 kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395550,"projectNumber":"J3445","queueDate":"2024-04-11T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"GridUnity","county":"Olmsted","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Westside","summerNetMW":45.0,"winterNetMW":49.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395551,"projectNumber":"S1184","queueDate":"2026-04-04T02:04:30+00:00","withdrawnDate":"2026-09-22T04:00:00+00:00","inService":"2027-06-07T04:00:00+00:00","transmissionOwner":"METC","county":"Fayette","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Ramsey","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395552,"projectNumber":"S1156","queueDate":"2026-04-13T22:38:55+00:00","inService":"2026-08-29T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"","state":"TX","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":632.0,"winterNetMW":632.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395553,"projectNumber":"J3719","queueDate":"2024-03-20T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greentown  - Walton. 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395554,"projectNumber":"J3453","queueDate":"2024-04-13T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395555,"projectNumber":"R5092","queueDate":"2026-04-10T09:43:08+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Washington","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"NRIS","poiName":"4JORD - 4ASHLEY 138.0kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395556,"projectNumber":"J3805","queueDate":"2024-03-27T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Coffeen North-Ramsey East-4557","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395557,"projectNumber":"J3728","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-02-01T05:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Franklin","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ameren E. West Frankfort - Franklin 138.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395558,"projectNumber":"J3604","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom (HED) -  Dresser 345.0kV","summerNetMW":650.0,"winterNetMW":650.0,"dp1ErisMw":650.0,"dp1NrisMw":650.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395559,"projectNumber":"J3603","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395560,"projectNumber":"J3859","queueDate":"2024-12-17T05:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395561,"projectNumber":"J3852","queueDate":"2024-12-31T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"KIRK","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395562,"projectNumber":"J3809","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2026-06-03T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Winnebago","summerNetMW":199.99,"winterNetMW":199.99,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395563,"projectNumber":"J3729","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-02-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Franklin","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Benton Northwest","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395564,"projectNumber":"J3884","queueDate":"2025-02-09T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Benton","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BENTON COUNTY 345 - START DBL CKT W/EW LINE 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395565,"projectNumber":"J3721","queueDate":"2024-03-20T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Spencer","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Culley - Dubois 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395566,"projectNumber":"J3835","queueDate":"2024-07-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Saginaw","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395567,"projectNumber":"J3836","queueDate":"2024-10-24T04:00:00+00:00","inService":"2028-10-06T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ONEIDA","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395568,"projectNumber":"J3529","queueDate":"2024-05-20T04:00:00+00:00","inService":"2028-05-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Mahnomen","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mahnomen - Winger 115.0kV","summerNetMW":64.0,"winterNetMW":64.0,"dp1ErisMw":64.0,"dp1NrisMw":64.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395569,"projectNumber":"J3599","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Lunsford","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395570,"projectNumber":"J3600","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"OAK RIDGE (LA) - SWARTZ 115.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395571,"projectNumber":"J3858","queueDate":"2024-12-18T05:00:00+00:00","withdrawnDate":"2026-07-22T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Madrid Substation 120 kV - Bus number 265650","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395572,"projectNumber":"J3850","queueDate":"2024-12-31T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pine","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ROCK CREEK","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395573,"projectNumber":"J3825","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"230kV Greenacres Substation","summerNetMW":730.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395574,"projectNumber":"J3837","queueDate":"2024-12-02T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ARGENTA - PALISADES 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395575,"projectNumber":"J3800","queueDate":"2024-04-17T04:00:00+00:00","inService":"2019-01-21T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Baraga","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Silver River","summerNetMW":1.8,"winterNetMW":1.8,"dp1ErisMw":1.8,"dp1NrisMw":1.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395576,"projectNumber":"J3460","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FITZ","summerNetMW":290.0,"winterNetMW":290.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395577,"projectNumber":"J3489","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"McDonough","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395578,"projectNumber":"J3475","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-05-13T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Mason","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Indian Creek","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395579,"projectNumber":"J3474","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BUCK CREEK - HAZELWOOD 138.0kV","summerNetMW":128.0,"winterNetMW":128.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395580,"projectNumber":"J3720","queueDate":"2024-03-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Ralls","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5SPALDNG (AECI) - 5PENOCRK  161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395581,"projectNumber":"J3873","queueDate":"2024-12-19T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Gibson","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Owensville Primary","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395582,"projectNumber":"J3521","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Neoga","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395583,"projectNumber":"J3723","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Wexford","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"KEYSTONE - LUDINGTON 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395584,"projectNumber":"J3543","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Dakota","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Chub Lake 115 kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":135.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395585,"projectNumber":"J3602","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":""},{"id":3395586,"projectNumber":"J3601","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"OAK RIDGE (LA) - SWARTZ 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395587,"projectNumber":"J3841","queueDate":"2024-10-31T04:00:00+00:00","withdrawnDate":"2025-09-11T04:00:00+00:00","inService":"2028-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Richland","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Smalling 230kV Substation","summerNetMW":735.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395588,"projectNumber":"J3844","queueDate":"2024-11-26T05:00:00+00:00","inService":"2029-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"St. Joseph","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BATAVIA - MORROW  138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395589,"projectNumber":"J3854","queueDate":"2024-12-26T05:00:00+00:00","withdrawnDate":"2025-04-09T04:00:00+00:00","inService":"2028-01-03T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4PURO - 4HAVANA3 138.0kV","summerNetMW":44.33,"winterNetMW":44.33,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395590,"projectNumber":"J3855","queueDate":"2024-12-26T05:00:00+00:00","withdrawnDate":"2025-12-31T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"CANTON - PICKENS 230.0kV","summerNetMW":197.5,"winterNetMW":197.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395591,"projectNumber":"J3799","queueDate":"2024-04-18T04:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BLACKFOOT - MADRID 345.0kV","summerNetMW":1452.0,"winterNetMW":1452.0,"dp1ErisMw":1452.0,"dp1NrisMw":1452.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395592,"projectNumber":"J3459","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CASH - NEWPORT AB 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395593,"projectNumber":"J4296","queueDate":"2026-08-29T02:17:46+00:00","inService":"2031-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1440.0,"winterNetMW":1440.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395594,"projectNumber":"J3258","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-22T05:00:00+00:00","inService":"2028-09-06T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TYLER","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395595,"projectNumber":"J3265","queueDate":"2024-04-11T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-17T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Brookings","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BROOKINGS COUNTY","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395596,"projectNumber":"J3272","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-08-18T04:00:00+00:00","inService":"2028-04-09T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"VIDALIA","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395597,"projectNumber":"J3271","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-03T04:00:00+00:00","inService":"2028-09-04T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395598,"projectNumber":"J3343","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Knox","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4MONM BLVD W - 4CASTRO_JCT 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395599,"projectNumber":"J3365","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AMITE - KENTWOOD 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395600,"projectNumber":"J3368","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ville Platte - West Fork 230.0kV","summerNetMW":199.9,"winterNetMW":199.9,"dp1ErisMw":199.9,"dp1NrisMw":199.9,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395601,"projectNumber":"J3378","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jackson","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"DANVILLE [LA]","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395602,"projectNumber":"J3451","queueDate":"2024-04-05T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Alcona","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"IOSCO - SPRUCE ROAD 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395603,"projectNumber":"J3448","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Grant","state":"WI","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON DEWEY (ATC) - GRAN GRAE (ATC) 161.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395604,"projectNumber":"J4302","queueDate":"2026-09-08T19:22:08+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395605,"projectNumber":"J4282","queueDate":"2026-09-01T05:00:35+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":242.8,"winterNetMW":242.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395606,"projectNumber":"J3425","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT","county":"Jasper","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Peachtree Substation","summerNetMW":59.2,"winterNetMW":59.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395607,"projectNumber":"J4258","queueDate":"2026-08-06T21:56:48+00:00","inService":"2031-02-22T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":787.3,"winterNetMW":787.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395608,"projectNumber":"J3476","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"St. Croix","state":"WI","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pine Lake Tap - APPLE RIVER  (DPC) 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395609,"projectNumber":"J4306","queueDate":"2026-09-08T17:16:50+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Ford","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395610,"projectNumber":"J3871","queueDate":"2024-12-19T05:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Charles","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WATERFORD 500 SS","summerNetMW":735.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395611,"projectNumber":"J3722","queueDate":"2024-03-27T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Hillsdale","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"COLDWATER - MOORE ROAD 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395612,"projectNumber":"J3527","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Allamakee","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Lansing - Postville (DPC) 161kV","summerNetMW":136.0,"winterNetMW":136.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395613,"projectNumber":"J3528","queueDate":"2024-04-15T04:00:00+00:00","inService":"2026-12-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CASEY    - 7NEWTON   345.0kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395614,"projectNumber":"J4283","queueDate":"2026-09-01T05:02:38+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":243.4,"winterNetMW":243.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395615,"projectNumber":"J4286","queueDate":"2026-08-29T01:04:17+00:00","inService":"2030-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395616,"projectNumber":"J3598","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-02-19T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":9.0,"winterNetMW":9.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395617,"projectNumber":"J3605","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2027-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"JACINTO","summerNetMW":430.0,"winterNetMW":465.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395618,"projectNumber":"J3843","queueDate":"2024-11-21T05:00:00+00:00","inService":"2027-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GOSS - SLATE 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395619,"projectNumber":"J3842","queueDate":"2024-10-31T04:00:00+00:00","withdrawnDate":"2025-09-11T04:00:00+00:00","inService":"2028-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Richland","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Smalling 230kV Substation","summerNetMW":735.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395620,"projectNumber":"J3857","queueDate":"2024-12-26T05:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Iosco","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ALCONA - WHITTEMORE 138.0kV","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395621,"projectNumber":"J3851","queueDate":"2024-12-31T05:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McDonough","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Macomb West","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395622,"projectNumber":"J3856","queueDate":"2024-12-26T05:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Wabash","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"08GIBSON (PSI) - 7ALBION   345.0kV","summerNetMW":235.0,"winterNetMW":235.0,"dp1ErisMw":235.0,"dp1NrisMw":153.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395623,"projectNumber":"J3458","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TWIST - PARKIN 161.0kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395624,"projectNumber":"J4288","queueDate":"2026-08-18T20:43:39+00:00","inService":"2029-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395625,"projectNumber":"J4292","queueDate":"2026-09-01T00:40:58+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":242.3,"winterNetMW":242.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395626,"projectNumber":"J4293","queueDate":"2026-09-01T00:45:02+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":242.8,"winterNetMW":242.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395627,"projectNumber":"J4294","queueDate":"2026-09-03T22:01:48+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395628,"projectNumber":"J4308","queueDate":"2026-09-09T23:09:09+00:00","inService":"2030-05-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395629,"projectNumber":"J4303","queueDate":"2026-09-09T00:49:01+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395630,"projectNumber":"J4295","queueDate":"2026-08-28T20:00:20+00:00","inService":"2030-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395631,"projectNumber":"J4298","queueDate":"2026-09-08T01:52:17+00:00","inService":"2031-05-02T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":976.1,"winterNetMW":976.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395632,"projectNumber":"J4289","queueDate":"2026-08-25T20:50:47+00:00","inService":"2030-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"North Rochester - Prairie Island 345.0kV","summerNetMW":215.0,"winterNetMW":215.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395633,"projectNumber":"J3741","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cleveland","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WOODWARD 115 SUB - RISON 115.0kV","summerNetMW":155.0,"winterNetMW":155.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395634,"projectNumber":"J4299","queueDate":"2026-09-09T01:50:43+00:00","inService":"2031-05-02T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395635,"projectNumber":"J4111","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Hot Spring","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SHERIDAN EHV - MAGNET COVE 500.0kV","summerNetMW":650.0,"winterNetMW":650.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395636,"projectNumber":"J4113","queueDate":"2025-10-06T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer","summerNetMW":787.4,"winterNetMW":787.4,"dp1ErisMw":525.0,"dp1NrisMw":525.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395637,"projectNumber":"J3765","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2024-04-18T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. James","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"ST JAMES","summerNetMW":8.0,"winterNetMW":8.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395638,"projectNumber":"J3756","queueDate":"2024-04-17T04:00:00+00:00","inService":"2019-01-21T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marquette","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Huron","summerNetMW":4.2,"winterNetMW":4.2,"dp1ErisMw":4.2,"dp1NrisMw":4.2,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395639,"projectNumber":"J3746","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Grant","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rodemacher - Sherwood 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395640,"projectNumber":"J3742","queueDate":"2024-06-06T04:00:00+00:00","inService":"2028-12-15T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Otter Tail","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wahpeton - Fergus Falls 230.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395641,"projectNumber":"J3763","queueDate":"2024-04-18T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DBGEN GIS","summerNetMW":7.5,"winterNetMW":7.5,"dp1ErisMw":7.5,"dp1NrisMw":7.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Waste Heat Recovery","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395642,"projectNumber":"J3761","queueDate":"2024-04-05T04:00:00+00:00","inService":"2027-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ogemaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GALLAGHER - TWINING 138.0kV","summerNetMW":145.8,"winterNetMW":145.8,"dp1ErisMw":145.8,"dp1NrisMw":145.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395643,"projectNumber":"J3750","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-10-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mercer","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"OAK GROVE - SANDBURG (AMRN) 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395644,"projectNumber":"J3504","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Bollinger","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5HERITAGE - 5FREDTN  161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395645,"projectNumber":"J3523","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Barron","state":"WI","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BARRON  - WASHCO  161.0kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":115.0,"dp1NrisMw":115.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395646,"projectNumber":"J3766","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-04-09T04:00:00+00:00","inService":"2026-10-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pottawattamie","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ROLLING HILLS - PONY CREEK 345.0kV","summerNetMW":235.0,"winterNetMW":235.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395647,"projectNumber":"J3506","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2024-08-13T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pike","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hull 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395648,"projectNumber":"J3554","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-07-09T04:00:00+00:00","inService":"2027-10-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Adair","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SOUTHERN HILLS","summerNetMW":96.0,"winterNetMW":96.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395649,"projectNumber":"J3589","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Lincoln","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FRANKLIN EHV - MCCOMB 115.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395650,"projectNumber":"J3751","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Madison","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7COFFEEN  - 7ROXFORD  345.0kV","summerNetMW":236.0,"winterNetMW":236.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395651,"projectNumber":"J3747","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WHITE BLUFF EHV - KEO EHV 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395652,"projectNumber":"J3553","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-11-30T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Adair","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Orient Energy Center Substation","summerNetMW":244.0,"winterNetMW":263.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395653,"projectNumber":"J3590","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Humphreys","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BELZONI - BELZONI TAP SS 115.0kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395654,"projectNumber":"J3586","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Montgomery","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"JACINTO - PEACH CREEK 230.0kV","summerNetMW":205.8,"winterNetMW":205.8,"dp1ErisMw":205.8,"dp1NrisMw":165.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395655,"projectNumber":"J3591","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-29T05:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Helena","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MCKNIGHT - PLANT DANIEL 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395656,"projectNumber":"J3630","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Feliciana","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MOLER - COLFEL 230.0kV","summerNetMW":77.0,"winterNetMW":77.0,"dp1ErisMw":77.0,"dp1NrisMw":77.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395657,"projectNumber":"J3625","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2027-10-27T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Winn","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"JELD WEN - WINNFIELD 115 SUB 115.0kV","summerNetMW":82.0,"winterNetMW":82.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395658,"projectNumber":"J3254","queueDate":"2024-04-15T04:00:00+00:00","inService":"2026-12-30T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5CAPE GIR3 - 5JOPPA SR 161.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395659,"projectNumber":"J3331","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Sullivan","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Petersburg - Sullivan (AEP/PJM) 345.0kV","summerNetMW":470.0,"winterNetMW":470.0,"dp1ErisMw":470.0,"dp1NrisMw":470.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395660,"projectNumber":"J3631","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Vermilion","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GUEYDAN TAP - MORSE 69.0kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395661,"projectNumber":"J3628","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2027-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Jefferson","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FRANKLIN EHV - GRAND GULF TRANSMISSION 500.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395662,"projectNumber":"J3505","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Bollinger","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5HERITAGE - 5FREDTN  161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395663,"projectNumber":"J3524","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Watonwan","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Crandall - Fieldon 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395664,"projectNumber":"J3522","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bison","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395665,"projectNumber":"J3592","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - TILLATOBA 230.0kV","summerNetMW":57.0,"winterNetMW":57.0,"dp1ErisMw":57.0,"dp1NrisMw":37.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395666,"projectNumber":"J3276","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-08-27T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mound City","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395667,"projectNumber":"J3413","queueDate":"2024-03-29T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-18T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"L.R. 145TH ST - L.R. PORT 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395668,"projectNumber":"J3627","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"JONESBORO (APL) - CASH 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395669,"projectNumber":"J3275","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-04T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Benton","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mud Lake - Benton County (GRE) 230kV","summerNetMW":249.0,"winterNetMW":249.0,"dp1ErisMw":249.0,"dp1NrisMw":249.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395670,"projectNumber":"J4304","queueDate":"2026-09-09T05:44:23+00:00","inService":"2031-09-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395671,"projectNumber":"J4114","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-07-31T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Washington","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SUB T HASKINS","summerNetMW":525.0,"winterNetMW":525.0,"dp1ErisMw":525.0,"dp1NrisMw":525.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395672,"projectNumber":"J3339","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hendricks","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AMO","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395673,"projectNumber":"J3414","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Gibson (Duke Terminal) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395674,"projectNumber":"J3412","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Ford","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395675,"projectNumber":"J3839","queueDate":"2024-05-31T04:00:00+00:00","withdrawnDate":"2026-01-04T05:00:00+00:00","inService":"2028-07-03T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Union","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MARION SS (LAGEN) - HUTTIG SS 115.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395676,"projectNumber":"J3332","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Calumet","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Forest Junction - Cypress 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395677,"projectNumber":"J3355","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"4IPAVA 3 - 4HAVANA2 138.0kV","summerNetMW":100.6,"winterNetMW":100.6,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395678,"projectNumber":"J3356","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Pike","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RATTS - ALGIERS 69.0kV","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395679,"projectNumber":"J3845","queueDate":"2024-11-27T05:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2029-02-09T05:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BROWNSTOWN - ENRICO FERMI #3 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395680,"projectNumber":"J3864","queueDate":"2024-12-09T05:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GOSS - THETFORD 345.0kV","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":230.0,"dp1NrisMw":230.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395681,"projectNumber":"J3866","queueDate":"2024-12-06T05:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Lapeer","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BENNET - GREENWOOD 120.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395682,"projectNumber":"J3862","queueDate":"2024-12-11T05:00:00+00:00","withdrawnDate":"2025-08-20T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Deuel","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Astoria - Deuel County 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395683,"projectNumber":"J3657","queueDate":"2024-04-04T04:00:00+00:00","withdrawnDate":"2025-10-06T04:00:00+00:00","inService":"2028-06-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Washington","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greer Solar substation J1458","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395684,"projectNumber":"J3867","queueDate":"2024-12-02T05:00:00+00:00","withdrawnDate":"2025-12-29T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Iroquois","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Watseka","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395685,"projectNumber":"J3860","queueDate":"2025-01-27T05:00:00+00:00","inService":"2030-04-02T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395686,"projectNumber":"J4112","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-08-25T04:00:00+00:00","inService":"2030-10-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Rock Island","state":"IL","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"OAK GROVE - SUB 93 LOUISA 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395687,"projectNumber":"J3748","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Washington","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gerald Andrus 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395688,"projectNumber":"J3660","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Rock Island","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Oak Grove 161 kV sub","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395689,"projectNumber":"J3652","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEECHER - KNOWLES 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395690,"projectNumber":"J3654","queueDate":"2024-04-05T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395691,"projectNumber":"J3697","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Jennings","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":44.0,"winterNetMW":44.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395692,"projectNumber":"J3659","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-12-27T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Avoyelles","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Yellow Bayou","summerNetMW":90.25,"winterNetMW":90.25,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395693,"projectNumber":"J3696","queueDate":"2024-04-15T04:00:00+00:00","inService":"2026-12-30T05:00:00+00:00","transmissionOwner":"METC","county":"Montcalm","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON ROAD - VERGENNES 345.0kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395694,"projectNumber":"J3698","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-10-16T04:00:00+00:00","transmissionOwner":"METC","county":"Roscommon","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HIGGINS - MIO DAM 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395695,"projectNumber":"J2295","queueDate":"2021-09-09T04:00:00+00:00","withdrawnDate":"2023-04-04T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Merom Substation 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395696,"projectNumber":"J3764","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Andes Substation 230 kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395697,"projectNumber":"J3473","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Bay","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395698,"projectNumber":"J3861","queueDate":"2024-12-13T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2028-07-28T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WAGNER","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395699,"projectNumber":"J3863","queueDate":"2024-12-11T05:00:00+00:00","withdrawnDate":"2025-07-07T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Itasca","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Boswell 230 - Blackberry 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395700,"projectNumber":"J3816","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BULLOCK - SAGINAW RIVER 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395701,"projectNumber":"J3653","queueDate":"2024-04-05T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395702,"projectNumber":"J3503","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Morrison Ditch 345 kV substation (LRTP projects 15 & 16) - BUS #255210","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395703,"projectNumber":"J3552","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"McLeod","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hutchinson Municipal - GRE Big Swan 115.0kV","summerNetMW":112.0,"winterNetMW":112.0,"dp1ErisMw":112.0,"dp1NrisMw":112.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395704,"projectNumber":"J3555","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-07-09T04:00:00+00:00","inService":"2027-10-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Boone","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEAVER CREEK","summerNetMW":84.0,"winterNetMW":84.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395705,"projectNumber":"J3588","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lawrence","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"J2733 Sub","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395706,"projectNumber":"J3662","queueDate":"2024-04-13T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Monroe","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Valmeyer 138kV.","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395707,"projectNumber":"J3712","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":350.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395708,"projectNumber":"J1854","queueDate":"2021-08-18T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Wabash","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wabash - Greentown 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395709,"projectNumber":"J2096","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Terrebonne","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Schriever 230 kV Substation","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395710,"projectNumber":"J3587","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"PORT ACRES BULK","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Co-gen","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395711,"projectNumber":"J3629","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DELTA SWYD - DREW [MS] 115.0kV","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395712,"projectNumber":"J3626","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395713,"projectNumber":"J3333","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MAJESTIC - MILAN 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395714,"projectNumber":"J3711","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2029-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395715,"projectNumber":"J3713","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wapello","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Ottumwa Generation - Woody 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395716,"projectNumber":"J2126","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2024-08-16T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Garner SS to Seracy  Price 115kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395717,"projectNumber":"J2137","queueDate":"2021-10-26T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-10-15T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Ohio","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"345 kV Wilson Substation","summerNetMW":78.23,"winterNetMW":78.23,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395718,"projectNumber":"J3735","queueDate":"2024-04-05T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEVERIDGE 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395719,"projectNumber":"J2535","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Vermilion","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cooper - Leesville 138 kV","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395720,"projectNumber":"J2460","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"White Bluff EHV 500kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395721,"projectNumber":"J2506","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"CITY OF COLUMBIA, MISSOURI (WATER AND LIGHT DEPT.)","county":"Boone","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5BOLSTAD 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395722,"projectNumber":"J3345","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Moultrie","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Faraday","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395723,"projectNumber":"J3354","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clinton","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hanover","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395724,"projectNumber":"J3865","queueDate":"2024-12-08T05:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CORNELL - LAYTON 138.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395725,"projectNumber":"J3655","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Dallas","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"OVERLAND TRAIL - FALLOW AVENUE 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395726,"projectNumber":"J3658","queueDate":"2024-03-25T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clark","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GURDON - BEIRNE 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395727,"projectNumber":"J3656","queueDate":"2024-03-26T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Saginaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BAUER","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395728,"projectNumber":"J2281","queueDate":"2021-08-20T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-10-07T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reynolds 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395729,"projectNumber":"J2522","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC Manila - Dell EHV 161 kV (J2089 POI)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395730,"projectNumber":"J2132","queueDate":"2022-10-31T04:00:00+00:00","withdrawnDate":"2024-08-16T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cayuga 230 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395731,"projectNumber":"J2291","queueDate":"2021-09-07T04:00:00+00:00","withdrawnDate":"2021-12-07T05:00:00+00:00","inService":"2025-07-23T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Winger","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395732,"projectNumber":"J2437","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"BRINKLEY EAST - AECC AUBREY 230.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395733,"projectNumber":"J2406","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pickens - Canton 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395734,"projectNumber":"J2527","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Allen","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Caney 138 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395735,"projectNumber":"J2534","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Mason","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pere Marquette 138 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395736,"projectNumber":"J2516","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"White Bluff EHV 500kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395737,"projectNumber":"J2524","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"","county":"Stoddard","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5STODDARD - 5MORLEY (AECI) 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395738,"projectNumber":"J2456","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"","county":"Phillips","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC AUBREY-RITCHIE SES SWITCHYARD 230 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395739,"projectNumber":"J2363","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washington","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marshalltown-Laurel 161kV","summerNetMW":226.0,"winterNetMW":226.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395740,"projectNumber":"J2515","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"White Bluff EHV 500kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395741,"projectNumber":"J2367","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"LaMoure","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ellendale 345kV SS","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395742,"projectNumber":"J2526","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Red River","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Layfield - Western Kraft 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395743,"projectNumber":"J2380","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-11-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Meade","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Meade County 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395744,"projectNumber":"J2409","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Independence","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"INDEPENDENCE-ISES 500kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395745,"projectNumber":"J2458","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Conway","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pleasant Hill 500kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395746,"projectNumber":"J2459","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"White Bluff EHV 500kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395747,"projectNumber":"J2508","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado Ehv - Sarepta 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395748,"projectNumber":"J2411","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"De Soto","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Red River-Mansfield 138kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395749,"projectNumber":"J2416","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Trempealeau","state":"WI","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Rochester-Briggs Road 345kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395750,"projectNumber":"J2365","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Werner West - Rocky Run 345kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395751,"projectNumber":"J2529","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cocodrie - Hineston 230kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395752,"projectNumber":"J2384","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"","county":"Shelby","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"4PANA 1 - 4SHELBYVL E 138.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395753,"projectNumber":"J2537","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Shawano","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Highway 22 345 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395754,"projectNumber":"J2484","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395755,"projectNumber":"J2426","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kinmundy 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395756,"projectNumber":"J2488","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Almeda Junction-Shale 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395757,"projectNumber":"J2427","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kinmundy 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395758,"projectNumber":"J3731","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport  - Vincennes 138.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395759,"projectNumber":"J2530","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clinton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Thorntown to Kokomo HP 230 kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395760,"projectNumber":"J2510","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stuttgart Rcuskey - Woodward 230kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395761,"projectNumber":"J2511","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Conway","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pleasant Hill 500kV Substation","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395762,"projectNumber":"J2364","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Page","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Madison-Orient 345kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395763,"projectNumber":"J2523","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Independence","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"INDEPENDENCE-ISES","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395764,"projectNumber":"J2368","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"LaMoure","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ellendale 345kV SS","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395765,"projectNumber":"J2369","queueDate":"2022-09-14T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Taylor","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Madison-Orient 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395766,"projectNumber":"J2366","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Werner West - Rocky Run 345kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395767,"projectNumber":"J2497","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-03-07T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jefferson","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"West Mt. Vernon","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395768,"projectNumber":"J2412","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"LR Alexander 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395769,"projectNumber":"J2498","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-03-07T05:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Hamilton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hortonville-Noblesville Line 345 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395770,"projectNumber":"J2499","queueDate":"2022-09-12T04:00:00+00:00","inService":"2026-03-07T05:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blendon 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395771,"projectNumber":"J2418","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Burr Oak 138kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395772,"projectNumber":"J2453","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Casey West 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395773,"projectNumber":"J2408","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-03-07T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Switzerland","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fairview 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395774,"projectNumber":"J2422","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Washington","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Baldwin","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395775,"projectNumber":"J2486","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"LALLENDORF - MONROE 345.0kV","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":85.0,"dp1NrisMw":85.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395776,"projectNumber":"J2491","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Edenville - Price Rd. Jct 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395777,"projectNumber":"J2429","queueDate":"2022-09-12T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Madison 69kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395778,"projectNumber":"J2430","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Red Gum 115kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395779,"projectNumber":"J2431","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Memphis-Genpower Keo 500kV Line Break (located at \"CHALKBLUFFPV\" 500kV POI SS, co-located with ","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395780,"projectNumber":"J2496","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-03-07T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reynolds 345 kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395781,"projectNumber":"J2413","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hoopeston West 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395782,"projectNumber":"J2428","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Coahoma","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Clarksdale 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395783,"projectNumber":"J2493","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Arenac","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gallagher - Tittabawassee 345 kV","summerNetMW":184.0,"winterNetMW":184.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395784,"projectNumber":"J2385","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Franklin","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SWARTZ 115 KV","summerNetMW":179.0,"winterNetMW":179.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395785,"projectNumber":"J2407","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Dresser-Merom (HED) 345kV line break","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395786,"projectNumber":"J2415","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Richard 138kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395787,"projectNumber":"J2359","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":58.5,"winterNetMW":58.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395788,"projectNumber":"J2410","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pottawattamie","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pony Creek-Rolling Hills Wind 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395789,"projectNumber":"J2414","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hoopeston 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395790,"projectNumber":"J2358","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":113.98,"winterNetMW":113.98,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395791,"projectNumber":"J2417","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Trempealeau","state":"WI","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Rochester-Briggs Road 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395792,"projectNumber":"J2376","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"4PANA 1 - 4SHELBYVL E 138.0kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395793,"projectNumber":"J2419","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Huntley 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395794,"projectNumber":"J2421","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Rush","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greensboro-Gwynneville 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395795,"projectNumber":"J2485","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BLACKFOOT - MADRID 345.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395796,"projectNumber":"J2424","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Manuel 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395797,"projectNumber":"J2490","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Tuscola-Arrowhead 120kV Transmission Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395798,"projectNumber":"J2434","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hoopeston West 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395799,"projectNumber":"J2435","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Webster","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Webster-Wright 161kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395800,"projectNumber":"J2370","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BOLTON - RAYMOND-CAPLINE 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395801,"projectNumber":"J2420","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Huntley 345kV","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395802,"projectNumber":"J2544","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Shawano","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Highway 22 345 kV Substation","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395803,"projectNumber":"J2423","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"","county":"Columbia","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Columbia-North Madison 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395804,"projectNumber":"J2438","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Montgomery","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7MONTGMRY -7ENON 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395805,"projectNumber":"J2461","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2022-11-30T05:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pana 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395806,"projectNumber":"J2425","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Montgomery","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7ENON - 7MONTGMRY 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395807,"projectNumber":"J2487","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gallagher-Tittabawassee 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395808,"projectNumber":"J2382","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-04-24T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Randolph","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5ADAIR    - 5THMHIL (AECI)  161.0kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":115.0,"dp1NrisMw":115.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395809,"projectNumber":"J2464","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ledyard-Colby 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395810,"projectNumber":"J2494","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Clare Jct to Vernon Jct 138 kV","summerNetMW":178.0,"winterNetMW":178.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395811,"projectNumber":"J2433","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Wadena","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wing River-Riverton 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395812,"projectNumber":"J2463","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Baldwin","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395813,"projectNumber":"J2525","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dunn - Oak Ridge 115 kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395814,"projectNumber":"J2532","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"","county":"Sangamon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Latham","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395815,"projectNumber":"J2545","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Buchanan","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Duane Arnold","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395816,"projectNumber":"J2518","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"LaMoure","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Jamestown 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395817,"projectNumber":"J2466","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Howard","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hazleton-Mitchell County 345kV line","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395818,"projectNumber":"J2444","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ARGENTA - TWIN BRANCH 345.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395819,"projectNumber":"J2436","queueDate":"2022-09-12T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Webster","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Webster-Lehigh 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395820,"projectNumber":"J2468","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado East 115kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395821,"projectNumber":"J2469","queueDate":"2022-09-12T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sub K (Tiffin)-Duane Arnold 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395822,"projectNumber":"J2495","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-04-29T04:00:00+00:00","transmissionOwner":"","county":"Benton","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Benton County 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395823,"projectNumber":"J2462","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ledyard-Colby 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395824,"projectNumber":"J2452","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cleveland","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sheridan EHV- EL Dorado EHV 500 Kv","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395825,"projectNumber":"J2371","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"DUNN - OAK RIDGE (LA) 115.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395826,"projectNumber":"J2539","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Trimble (LGEE) - Speed 345 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395827,"projectNumber":"J2390","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Ipava 138kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395828,"projectNumber":"J2546","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Deuel","state":"SD","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Astoria 345kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395829,"projectNumber":"J2492","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Wilkin","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wahpeton 230kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395830,"projectNumber":"J2505","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bon Wier to Cooper 138 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395831,"projectNumber":"J2541","queueDate":"2025-10-22T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Graves","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bryan Road","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395832,"projectNumber":"J2501","queueDate":"2022-09-13T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NORTH ROCHESTER","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395833,"projectNumber":"J2465","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Goose Creek Energy Center to Maroa East 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395834,"projectNumber":"J2467","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Manuel 138kV","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395835,"projectNumber":"J2481","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pocahontas","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Webster-Irvington 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395836,"projectNumber":"J2542","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Vesta Rd 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395837,"projectNumber":"J2533","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Union","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bernice - Vienna 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395838,"projectNumber":"J2381","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Union","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DOWNSVILLE- RUSTON EAST (LAGEN) 115 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395839,"projectNumber":"J2372","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bloomington Brokaw 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395840,"projectNumber":"J2538","queueDate":"2025-10-22T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Speed  - Trimble (LGEE) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395841,"projectNumber":"J2540","queueDate":"2025-10-22T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Graves","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bryan Road","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395842,"projectNumber":"J2392","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Mason","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PERE MARQUETTE 138 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395843,"projectNumber":"J2441","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Bay - Centennial 138 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395844,"projectNumber":"J2483","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2023-03-21T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GILLSBURG SS (CE)-LIBERTY115 Kv","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395845,"projectNumber":"J2386","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marked Tree 161 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395846,"projectNumber":"J2443","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Kosciusko","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Leesburg 345 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395847,"projectNumber":"J2479","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Red Gum to Metropolis 115 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395848,"projectNumber":"J2405","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-14T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Peters Road 230 kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395849,"projectNumber":"J2476","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Otego 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395850,"projectNumber":"J2442","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Ripley","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Batesville 138 kV","summerNetMW":84.0,"winterNetMW":84.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395851,"projectNumber":"J2512","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Kosciusko","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Leesburg 345 kV","summerNetMW":173.0,"winterNetMW":173.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395852,"projectNumber":"J2482","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395853,"projectNumber":"J2504","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mattoon East 138 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395854,"projectNumber":"J2514","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Pike","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gibson Sta to Petersburg (IP&L) 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395855,"projectNumber":"J2521","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marked Tree 161 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395856,"projectNumber":"J2489","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Red River","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Western Kraft-Layfield 230 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395857,"projectNumber":"J2507","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Pike","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gibson Sta to Petersburg (IP&L) 345 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395858,"projectNumber":"J2520","queueDate":"2022-09-13T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Adams","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Saratoga-ACEC Badger West 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395859,"projectNumber":"J2547","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-18T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"McCracken","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bryan Road - McCracken County 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395860,"projectNumber":"J2513","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wabash River-Whitesville South 230 kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395861,"projectNumber":"J2517","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC  Aubrey to Brinkley East 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395862,"projectNumber":"J2361","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-22T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Perry","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC Oppelo 161 kV Substation","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395863,"projectNumber":"J2360","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-05-07T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TH Pfizer Jct. - Worthington (HED)","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395864,"projectNumber":"J2440","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-07-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Benton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"GOODLAND - MORRISON DITCH 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395865,"projectNumber":"J2552","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-18T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Rock Island","state":"IL","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SUB 39 - CORDOVA 345.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395866,"projectNumber":"J2519","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Richland","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Smalling","summerNetMW":600.0,"winterNetMW":600.0,"dp1ErisMw":600.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395867,"projectNumber":"J2379","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"","county":"Clay","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Xenia","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395868,"projectNumber":"J2472","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-05-07T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gibson Sta - Merom (HED) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395869,"projectNumber":"J2455","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"La Crosse","state":"WI","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"FRENCH ISLAND","summerNetMW":92.0,"winterNetMW":92.0,"dp1ErisMw":92.0,"dp1NrisMw":92.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395870,"projectNumber":"J2548","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-18T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"McCracken","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bryan Road - McCracken County 161.0kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395871,"projectNumber":"J2550","queueDate":"2022-09-14T04:00:00+00:00","inService":"2030-07-18T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Yellow Medicine","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HAZEL CREEK","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395872,"projectNumber":"J2551","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-18T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Putnam","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395873,"projectNumber":"J2383","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-05-07T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Faraday","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395874,"projectNumber":"J2375","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-05-07T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Faraday","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395875,"projectNumber":"J2446","queueDate":"2022-09-12T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dunn","state":"WI","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Allen S King - Eau Claire 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395876,"projectNumber":"J2393","queueDate":"2023-08-25T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kansas West Substation 138kV","summerNetMW":164.0,"winterNetMW":164.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395877,"projectNumber":"J2445","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Greene","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Karma 161kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395878,"projectNumber":"J2553","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":210.0,"dp1NrisMw":210.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395879,"projectNumber":"J2555","queueDate":"2023-08-28T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Ingham","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DELHI to TOMPKINS 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395880,"projectNumber":"J2404","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Baton Rouge","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EAST","summerNetMW":38.81,"winterNetMW":38.81,"dp1ErisMw":38.8,"dp1NrisMw":38.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395881,"projectNumber":"J2388","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Faraday","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395882,"projectNumber":"J2474","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"4AUSTIN - 4VIRDEN   138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395883,"projectNumber":"J2450","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tippecanoe","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WESTWOOD 345 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395884,"projectNumber":"J2448","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Haynesville South to Sarepta 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395885,"projectNumber":"J2378","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Macomb","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"LENOX - ST.CLAIR 120.0kV","summerNetMW":152.0,"winterNetMW":152.0,"dp1ErisMw":152.0,"dp1NrisMw":152.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395886,"projectNumber":"J2432","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lula-Tunica 115kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395887,"projectNumber":"J2439","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marathon","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gardner Park-Stone Lake 345kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395888,"projectNumber":"J2389","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Adams","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Monument","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395889,"projectNumber":"J2475","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Toll Rd 120kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395890,"projectNumber":"J2502","queueDate":"2022-09-13T04:00:00+00:00","inService":"2025-02-27T05:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morton","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Square Butte 230 kV Substation East","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395891,"projectNumber":"J2470","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Donahue-Marksville 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395892,"projectNumber":"J2471","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Lenawee","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Beecher-Cement City 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395893,"projectNumber":"J2451","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gerald Andrus SES Switchyard-Lake Village Bagby 230 Kv","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395894,"projectNumber":"J2391","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tallahatchie","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Webb 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395895,"projectNumber":"J2449","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Faulkner","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Mayflower EHV 500 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395896,"projectNumber":"J2387","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Stoddard","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Stoddard 161 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395897,"projectNumber":"J2500","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bon Wier to Cooper 138 kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395898,"projectNumber":"J2536","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"LaSalle","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fox River - Ottawa 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395899,"projectNumber":"J3661","queueDate":"2024-04-14T04:00:00+00:00","withdrawnDate":"2025-09-02T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Henry","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7MAYWOOD - 7SUB T  3 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395900,"projectNumber":"J2503","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lincoln","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Downsville - Ruston East 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395901,"projectNumber":"J2528","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Parkin to Kuhn Road 161 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395902,"projectNumber":"J3707","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-07-01T04:00:00+00:00","inService":"2027-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395903,"projectNumber":"J1892","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Livingston - Keystone 345 kV","summerNetMW":64.8,"winterNetMW":64.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395904,"projectNumber":"J2531","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Union","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bernice - Vienna 115 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395905,"projectNumber":"J2395","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395906,"projectNumber":"J2401","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"","county":"Johnson","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7W_FRFT_E - 7SHAWNEE FP 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395907,"projectNumber":"J2403","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"","county":"Johnson","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7JORD - 7MASS 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395908,"projectNumber":"J1864","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-10-12T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Emery 161kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395909,"projectNumber":"J3732","queueDate":"2024-04-15T04:00:00+00:00","inService":"2026-12-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Niles 138 kV (J1208/J1209) to be built near existing Harco Tap","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395910,"projectNumber":"J2454","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-12T05:00:00+00:00","transmissionOwner":"ITC","county":"Montcalm","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Eureka - Vestaburg 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395911,"projectNumber":"J2477","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":600.0,"winterNetMW":600.0,"dp1ErisMw":600.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395912,"projectNumber":"J2478","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV","summerNetMW":550.0,"winterNetMW":550.0,"dp1ErisMw":550.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395913,"projectNumber":"J2480","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Daviess","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reid to Daviess County 161 kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395914,"projectNumber":"J4108","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-01-27T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Webster","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SAREPTA","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395915,"projectNumber":"J4036","queueDate":"2025-07-01T04:00:00+00:00","withdrawnDate":"2025-12-31T05:00:00+00:00","inService":"2029-09-06T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Cross","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WYNNE INDUSTRIAL","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395916,"projectNumber":"J2509","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tippecanoe","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Westwood 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395917,"projectNumber":"J2549","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-07-18T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Clark","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sub T to Maywood 345kV line","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395918,"projectNumber":"S1082","queueDate":"2025-01-13T05:00:00+00:00","inService":"2028-04-30T04:00:00+00:00","negInService":"2029-05-12T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"DU PONT - WHITE LAKE 138.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395919,"projectNumber":"S1093","queueDate":"2025-03-06T05:00:00+00:00","withdrawnDate":"2026-06-18T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Mitchell","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Mitchell County","summerNetMW":202.0,"winterNetMW":202.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395920,"projectNumber":"J4110","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Lafayette","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"Rork - Sellers Road 230.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395921,"projectNumber":"J4109","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Iberville","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DONALDSONVILLE - EVERGREEN 230.0kV","summerNetMW":1300.0,"winterNetMW":1300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395922,"projectNumber":"J2447","queueDate":"2025-10-22T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395923,"projectNumber":"J2457","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY NEW ORLEANS, LLC ENTO","county":"Orleans","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PATERSON","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395924,"projectNumber":"J2374","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J1557 Sub","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395925,"projectNumber":"J2543","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Bay - Centennial 138 kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395926,"projectNumber":"J2473","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Marion","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hanna 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395927,"projectNumber":"J2399","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Independence ISES - Powerline Road 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395928,"projectNumber":"J2400","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Bienville","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Sailes Substation 115kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395929,"projectNumber":"J2402","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"","county":"Johnson","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7W_FRFT_E - 7SHAWNEE FP 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395930,"projectNumber":"J2373","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-01-25T05:00:00+00:00","inService":"2025-01-06T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"230kV Graywood or (new) Big Lake","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Waste Heat Recovery","facilityType":"Steam Turbine (including Nuclear, Geothermal and Solar Steam)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395931,"projectNumber":"J3663","queueDate":"2024-04-13T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395932,"projectNumber":"J4240","queueDate":"2026-05-13T02:35:53+00:00","inService":"2031-06-28T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Big Stone South 345 kV substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395933,"projectNumber":"S1166","queueDate":"2026-05-04T19:33:45+00:00","inService":"2029-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"MN","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":108.93,"winterNetMW":108.93,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395934,"projectNumber":"J2377","queueDate":"2024-11-07T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CLINTON  - 7BROKAW 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395935,"projectNumber":"J2394","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Independence ISES - Powerline Road 500 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395936,"projectNumber":"J2396","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395937,"projectNumber":"J2397","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395938,"projectNumber":"J2398","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Independence ISES - Powerline Road 500 kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395939,"projectNumber":"J2362","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"VEEDERSBURG WEST 230kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395940,"projectNumber":"J4023","queueDate":"2025-02-03T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clay","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wabash River  -  Staunton 230.0kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395941,"projectNumber":"J4246","queueDate":"2026-06-25T21:45:49+00:00","inService":"2029-05-04T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":280.0,"winterNetMW":280.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395942,"projectNumber":"S1177","queueDate":"2026-05-22T08:19:27+00:00","inService":"2028-01-10T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395943,"projectNumber":"J3244","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Parke","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Parke County REMC","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395944,"projectNumber":"J2200","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2021-11-30T05:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Scott","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BLUE LAKE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395945,"projectNumber":"J4069","queueDate":"2025-10-03T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marathon","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Kelly - Ackley 115.0kV","summerNetMW":169.93,"winterNetMW":169.93,"dp1ErisMw":169.93,"dp1NrisMw":169.93,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395946,"projectNumber":"S1116","queueDate":"2025-08-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","negInService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tallahatchie","state":"MS","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"WEBB","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395947,"projectNumber":"S1164","queueDate":"2026-05-11T04:00:00+00:00","inService":"2028-08-03T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"MIssissippi","state":"AR","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Dell - Manila 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395948,"projectNumber":"J3250","queueDate":"2024-04-14T04:00:00+00:00","withdrawnDate":"2025-09-02T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FLOYD - EMERY (ITCM) 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395949,"projectNumber":"J3262","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Stowell","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395950,"projectNumber":"J3302","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"P.B. SOUTH - VARNER 115.0kV","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395951,"projectNumber":"J3305","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-01-17T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Adams","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395952,"projectNumber":"J3263","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Desha","state":"AK","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DUMAS - REED SS 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395953,"projectNumber":"J3287","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Osceola","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hersey Interconnection","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395954,"projectNumber":"J1030","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-10-22T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2020-03-20T04:00:00+00:00","negInService":"2023-01-23T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Polk County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Poco - Menard 138kV Line Tao","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3395955,"projectNumber":"J1034","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Stoddard County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Stoddard - Morley 161kV Line Tap","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":225.0,"dp2NrisMw":225.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3395956,"projectNumber":"J3301","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Prairie","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DES ARC - COTTON PLANT 115.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395957,"projectNumber":"J3303","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Prairie","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395958,"projectNumber":"J3304","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clark","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ETTA - MCNEIL EHV 500.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395959,"projectNumber":"J1032","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Wabasha County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Briggs Rd. - N. Rochester 345 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395960,"projectNumber":"J1036","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-02-15T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"Xcel Energy","county":"Cottonwood County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lakefield Generation SW 345kV Substation","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395961,"projectNumber":"J1013","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-12-02T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Batavia 138kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395962,"projectNumber":"J1014","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-12-02T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Tompkins - Blackstone 138kV Line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395963,"projectNumber":"J1039","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-10T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Warren County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Enon - Montogomery 345kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395964,"projectNumber":"J4241","queueDate":"2026-05-28T18:29:18+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"St. Charles","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"SIOUX","summerNetMW":2220.0,"winterNetMW":2220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395965,"projectNumber":"J4265","queueDate":"2026-08-18T21:43:06+00:00","inService":"2031-08-12T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395966,"projectNumber":"J4290","queueDate":"2026-08-19T19:06:19+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"CITY OF AMES","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":54.0,"winterNetMW":54.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395967,"projectNumber":"J1047","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Walworth County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Lake Geneva - Sugar Creek - Burlington 138kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395968,"projectNumber":"J1053","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Jefferson County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Concord SW YD 138 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395969,"projectNumber":"J3252","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FITZ","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395970,"projectNumber":"J3261","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tunica 230 kV (337160)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395971,"projectNumber":"J1033","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-10T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Stoddard County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Stoddard - Morely 161 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395972,"projectNumber":"J1011","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Kenosha County,Racine County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Arcadian - Zion 345kV Line Tap","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395973,"projectNumber":"J3260","queueDate":"2024-03-28T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"LaSalle","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4NLASALLE RB - 4WED_FOXR 138.0kV","summerNetMW":97.0,"winterNetMW":97.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395974,"projectNumber":"J3267","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"THETFORD","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395975,"projectNumber":"J1043","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2023-02-09T05:00:00+00:00","doneDate":"2021-05-03T04:00:00+00:00","inService":"2021-06-13T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2024-05-31T04:00:00+00:00","transmissionOwner":"METC","county":"Montcalm County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Vergennes - Nelson Rd 345 kV Line Tap","summerNetMW":374.4,"winterNetMW":374.4,"dp1ErisMw":374.4,"dp1NrisMw":374.4,"dp2ErisMw":374.4,"dp2NrisMw":374.4,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3395976,"projectNumber":"J1044","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Walworth County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Lake Geneva - Sugar Creek - Burlington 138kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395977,"projectNumber":"J1038","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Grant County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Grant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap","summerNetMW":32.5,"winterNetMW":32.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395978,"projectNumber":"J1046","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-11-21T05:00:00+00:00","inService":"2020-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Majestic - Lemoyne 345 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395979,"projectNumber":"J1080","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-22T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"DeWitt County,McLean County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Brokaw - Clinton 345kV Line Tap","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395980,"projectNumber":"J1054","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cannon Falls 115kV Substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395981,"projectNumber":"J3286","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"KILGORE - MICAH 120.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3395982,"projectNumber":"J3300","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CASH - NEWPORT AB 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395983,"projectNumber":"J1081","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-28T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Polk County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Winger 115kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395984,"projectNumber":"J1084","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2021-06-15T04:00:00+00:00","negInService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Rock Creek 345 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3395985,"projectNumber":"J1092","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2022-09-30T04:00:00+00:00","giaToExec":"2021-06-15T04:00:00+00:00","negInService":"2023-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Saint Croix County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Three Lakes 115 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395986,"projectNumber":"J1067","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-10-20T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Pulaski County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds - Burr Oak 345kV Line","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":240.0,"dp1NrisMw":240.0,"dp2ErisMw":240.0,"dp2NrisMw":240.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3395987,"projectNumber":"J3232","queueDate":"2024-04-11T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CAYUGA STATION","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":475.5,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395988,"projectNumber":"J1041","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Brewster - Heron Lake 161 kV Line","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395989,"projectNumber":"J1042","queueDate":"2018-03-09T05:00:00+00:00","withdrawnDate":"2023-08-09T04:00:00+00:00","doneDate":"2021-05-18T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-05-18T04:00:00+00:00","negInService":"2023-09-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Walworth County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Lake Geneva 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3395990,"projectNumber":"J1012","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-28T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Scott County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Jacksonville Ind. Park - Winchester 138kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395991,"projectNumber":"S1120","queueDate":"2025-09-08T04:00:00+00:00","inService":"2027-07-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Knox","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Edwardsport  - Washington Mun","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395992,"projectNumber":"J4242","queueDate":"2026-05-22T23:48:28+00:00","inService":"2031-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395993,"projectNumber":"J1068","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-11-21T05:00:00+00:00","inService":"2020-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Dorset 120 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3395994,"projectNumber":"J1088","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-02-04T05:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Cornell - Layton 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3395995,"projectNumber":"J3245","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-09-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Breckinridge","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Meade County - New Hardinsburg 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395996,"projectNumber":"J3246","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Sangamon","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fancy Creek 138kV Substation","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395997,"projectNumber":"J3251","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"THETFORD","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3395998,"projectNumber":"J3264","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LIVINGSTON CO","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3395999,"projectNumber":"J1031","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-07T05:00:00+00:00","inService":"2020-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Fall Creek - New Castle 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396000,"projectNumber":"J1040","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2022-02-01T05:00:00+00:00","negInService":"2023-05-14T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"McIntosh County","state":"ND","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Wishek Junction 230 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396001,"projectNumber":"J1010","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Kenosha County,Racine County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Arcadian - Zion 345kV Line Tap","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396002,"projectNumber":"J1035","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-15T04:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Fayetteville - Marigold 138 kV Line Tap","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396003,"projectNumber":"J1045","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-07-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Fenton - Chanarambie 115kV Line Tap","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":20.0,"dp2NrisMw":20.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396004,"projectNumber":"J1015","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-27T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Gaylord 138kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396005,"projectNumber":"J1049","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Forrest County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Purvis 161 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396006,"projectNumber":"J1019","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-03T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Boone County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Overton - McCredie 345 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396007,"projectNumber":"J1050","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-01-17T05:00:00+00:00","inService":"2022-06-03T04:00:00+00:00","giaToExec":"2022-01-18T05:00:00+00:00","negInService":"2022-07-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Boone County,Hamilton County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Doud Tap 161 kV Substation","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":225.0,"dp2NrisMw":225.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396008,"projectNumber":"J1060","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-08-19T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2020-03-30T04:00:00+00:00","negInService":"2023-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"St. Francis County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"West Memphis - Keo 500 kV Line Tap","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":450.0,"dp2NrisMw":400.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396009,"projectNumber":"J1061","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Wabasha County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Briggs Rd - N. Rochester 345 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396010,"projectNumber":"J1063","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-03-09T05:00:00+00:00","inService":"2022-10-31T04:00:00+00:00","giaToExec":"2021-03-29T04:00:00+00:00","negInService":"2022-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Clinton County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"New London - Frankfort 230kV Line Tap","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":195.0,"dp1NrisMw":195.0,"dp2ErisMw":195.0,"dp2NrisMw":195.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396011,"projectNumber":"J1057","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Brewster - Heron Lake 161 kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396012,"projectNumber":"J1071","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-03-26T04:00:00+00:00","inService":"2021-01-20T05:00:00+00:00","giaToExec":"2021-03-26T04:00:00+00:00","negInService":"2021-01-15T05:00:00+00:00","transmissionOwner":"METC","county":"Oceana County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Donaldson 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396013,"projectNumber":"J1085","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marathon County,Taylor County,Wood County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Gardner Park - J821 POI - Stone Lake 345 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396014,"projectNumber":"J1065","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-11-21T05:00:00+00:00","inService":"2020-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Alma - Vestaburg 138kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396015,"projectNumber":"J1059","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-07T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Cape Girardeau County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kelso - Lutesville 345 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396016,"projectNumber":"J1086","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Nobles County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Elk - Brewster 161 kV Line Tap","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396017,"projectNumber":"J1073","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Webre 500 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396018,"projectNumber":"J1093","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Desha County,Drew County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Reed Switch 115kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396019,"projectNumber":"J1076","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-01-06T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","giaToExec":"2020-07-01T04:00:00+00:00","negInService":"2022-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"St. James Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Vacherie Sub 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396020,"projectNumber":"J1078","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"San Souci 500 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396021,"projectNumber":"J1037","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-15T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Murray County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Moon Lake 69kV Substation","summerNetMW":15.0,"winterNetMW":15.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396022,"projectNumber":"J1017","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-03T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC PSI","county":"Carroll County,White County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Springboro 138 kV Substation","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396023,"projectNumber":"J1018","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-03T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC PSI","county":"Miami County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Peru South East - Greentown 230 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396024,"projectNumber":"J1051","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Jefferson County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Concord 138kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396025,"projectNumber":"J1062","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-04-23T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Majestic - Lemoyne 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396026,"projectNumber":"J1083","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-12-02T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Oneida138kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396027,"projectNumber":"J1124","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","giaToExec":"2021-06-15T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"SMMPA","county":"Olmsted County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Byron 345kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396028,"projectNumber":"J1142","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-07-10T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","giaToExec":"2018-12-12T05:00:00+00:00","negInService":"2020-07-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"St. James Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Vacherie 230kV Substation","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":20.0,"dp2NrisMw":20.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service (with Provisional GIA)"},{"id":3396029,"projectNumber":"J1125","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-08-12T04:00:00+00:00","inService":"2021-07-31T04:00:00+00:00","giaToExec":"2020-03-30T04:00:00+00:00","negInService":"2023-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Cross County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Wynne South - Wynne East AECC 161 kV Line Tap","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":135.0,"dp2ErisMw":135.0,"dp2NrisMw":135.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396030,"projectNumber":"J1143","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER","county":"Morrison County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Blanchard - Little Falls 115 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396031,"projectNumber":"J1104","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Washington County,Waukesha County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Germantown - Bark River 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396032,"projectNumber":"J1105","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hampton Corners 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396033,"projectNumber":"J1090","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-02-04T05:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","transmissionOwner":"METC","county":"Ingham County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Tompkins - Churchill Jct 138 kV Line Tap","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":90.0,"dp2NrisMw":90.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396034,"projectNumber":"J1064","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-11-21T05:00:00+00:00","inService":"2020-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Marquette - Vergennes 138 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396035,"projectNumber":"J1091","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Power Line Road 161 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396036,"projectNumber":"J1072","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2021-06-15T04:00:00+00:00","negInService":"2023-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Mower County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Adams 345 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396037,"projectNumber":"J1066","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-05-17T04:00:00+00:00","inService":"2019-07-31T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Pike County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"E-NRIS","poiName":"El Dara Junction - Pittsfield 69 kV Line Tap","summerNetMW":44.0,"winterNetMW":44.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396038,"projectNumber":"J1094","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2024-01-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Prest 138kV Switching Station","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396039,"projectNumber":"J1069","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-04-20T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Pulaski County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396040,"projectNumber":"J1096","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2024-01-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Norris City North - Muddy 138 kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396041,"projectNumber":"J1075","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Cass County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta - Weeds Lake - Hiple 345kV Line Tap","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396042,"projectNumber":"J1097","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke County,Pulaski County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"KEO EHV 500 kV Substation","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396043,"projectNumber":"J1098","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2022-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Jackson County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lakefield 345 kV Substation","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396044,"projectNumber":"J1099","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Derrick 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396045,"projectNumber":"J1121","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marathon County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Stone Lake - (Pershing) - Gardner Park 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396046,"projectNumber":"J1102","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-09-13T04:00:00+00:00","inService":"2021-06-13T04:00:00+00:00","giaToExec":"2021-03-08T05:00:00+00:00","negInService":"2021-12-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Fogarty 138 kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":70.0,"dp2ErisMw":70.0,"dp2NrisMw":70.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396047,"projectNumber":"J1127","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-10-25T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Green County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Albany - Bass Creek 138 kV Line Tap","summerNetMW":49.9,"winterNetMW":49.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396048,"projectNumber":"J1129","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-10-25T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Paddock - Townline Rd 138 kV Line Tap","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396049,"projectNumber":"J1146","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-08-12T04:00:00+00:00","inService":"2019-01-04T05:00:00+00:00","giaToExec":"2020-06-03T04:00:00+00:00","negInService":"2020-10-10T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Mississippi County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"San Souci 500 kV Substation","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":10.0,"dp1NrisMw":10.0,"dp2ErisMw":10.0,"dp2NrisMw":10.0,"fuelType":"Coal","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396050,"projectNumber":"J1172","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-03T04:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2023-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Dort - Garfield 138 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396051,"projectNumber":"J1190","queueDate":"2019-01-22T05:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Calamus East 161 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396052,"projectNumber":"J1191","queueDate":"2019-02-04T05:00:00+00:00","withdrawnDate":"2025-02-10T05:00:00+00:00","inService":"2022-07-31T04:00:00+00:00","negInService":"2025-02-28T05:00:00+00:00","transmissionOwner":"City of Columbia, MO","county":"Boone County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Bolstad 69 kV Substation","summerNetMW":64.0,"winterNetMW":64.0,"dp1ErisMw":64.0,"dp1NrisMw":64.0,"dp2ErisMw":64.0,"dp2NrisMw":64.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396053,"projectNumber":"J1176","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-15T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo County,Worth County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lime Creek 161 kV Substation","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396054,"projectNumber":"J1177","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Schuyler County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hughes 345 kV Switching Station (J541 POI)","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396055,"projectNumber":"J1079","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Charles Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Waterford 1&2 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396056,"projectNumber":"J1123","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-02T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek 345 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396057,"projectNumber":"J1106","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Redwood County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lyon County - Cedar Mountain 345 kV Circuit 2 Line","summerNetMW":414.0,"winterNetMW":414.0,"dp1ErisMw":414.0,"dp1NrisMw":414.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396058,"projectNumber":"J1148","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-07T05:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Posey County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"AB Brown 138 kV Substation","summerNetMW":54.0,"winterNetMW":54.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396059,"projectNumber":"J1174","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Ledyard - Colby 345 kV Line Tap","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":165.0,"dp1NrisMw":165.0,"dp2ErisMw":165.0,"dp2NrisMw":165.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396060,"projectNumber":"J1192","queueDate":"2019-03-25T04:00:00+00:00","withdrawnDate":"2022-10-25T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-07-01T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Oneida 138kV Substation","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":35.0,"dp1NrisMw":35.0,"dp2ErisMw":35.0,"dp2NrisMw":35.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396061,"projectNumber":"J1175","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Ledyard - Colby 345kV Line Tap","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":165.0,"dp1NrisMw":165.0,"dp2ErisMw":165.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396062,"projectNumber":"J1195","queueDate":"2019-04-24T04:00:00+00:00","withdrawnDate":"2020-01-03T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Wagner 138 kV Substation","summerNetMW":150.4,"winterNetMW":150.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396063,"projectNumber":"J1179","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Rush City - Red Rock 230 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396064,"projectNumber":"J1197","queueDate":"2019-04-25T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2021-06-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"LaSalle County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Corbin 138kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396065,"projectNumber":"J1100","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Grimes County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Grimes 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396066,"projectNumber":"J1101","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2025-11-20T05:00:00+00:00","doneDate":"2021-04-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-04-12T04:00:00+00:00","negInService":"2023-08-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Manitowoc County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kewaunee 138kV Substation","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":20.0,"dp2NrisMw":20.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396067,"projectNumber":"J1126","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tuscola County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"ITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation","summerNetMW":1.1,"winterNetMW":1.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396068,"projectNumber":"J1128","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","transmissionOwner":"SMMPA","county":"Freeborn County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hayward - Murphy Creek 161 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396069,"projectNumber":"J1145","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-03-31T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2022-04-01T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Callaway County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Overton - (McCrede) - Montgomery 345 kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396070,"projectNumber":"J1147","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-24T05:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Moses - McCrory 161 kV Line tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396071,"projectNumber":"J1107","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-11-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Cape Girardeau County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kelso - Lutesville 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396072,"projectNumber":"J1149","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-11-15T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Yellow Medicine County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hazel Creek 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396073,"projectNumber":"J1170","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass County","state":"ND","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bison 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396074,"projectNumber":"J1193","queueDate":"2019-04-22T04:00:00+00:00","withdrawnDate":"2020-04-28T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Morton County","state":"ND","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Heskitt 115 kV Switchyard","summerNetMW":103.1,"winterNetMW":103.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396075,"projectNumber":"J1016","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-06T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Gibson County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Francisco - Toyota Z75 138kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396076,"projectNumber":"J1048","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-28T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Mecosta County,Montcalm County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Vergennes - Nelson Road 345kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396077,"projectNumber":"J1052","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-27T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Beecher - Seamless East 138kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396078,"projectNumber":"J1055","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-11-13T05:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2019-07-31T04:00:00+00:00","negInService":"2020-10-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Mason Substation 138 kV Bus","summerNetMW":144.0,"winterNetMW":144.0,"dp1ErisMw":144.0,"dp1NrisMw":144.0,"dp2ErisMw":144.0,"dp2NrisMw":144.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396079,"projectNumber":"J1082","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-28T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Grundy County,Mercer County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Zachary 345 kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396080,"projectNumber":"J1056","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-11-21T05:00:00+00:00","inService":"2020-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Monroe County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Lulu - Monroe 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396081,"projectNumber":"J1070","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Washington County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"SE Greenville 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396082,"projectNumber":"J1058","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2021-10-15T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Lake County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer-St. John 345kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396083,"projectNumber":"J1087","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-12-02T05:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Scott County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Miner - Kelso 161 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396084,"projectNumber":"J1074","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2023-10-27T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2021-03-29T04:00:00+00:00","negInService":"2022-11-15T05:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Gibson County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Francisco 138 kV sub","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396085,"projectNumber":"J1089","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-02-04T05:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Cornell - Bell Rd 138 kV Line Tap","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":170.0,"dp2NrisMw":170.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396086,"projectNumber":"J1095","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"DeSoto County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Twinkletown 230kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396087,"projectNumber":"J1178","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-08-06T04:00:00+00:00","doneDate":"2021-05-03T04:00:00+00:00","inService":"2020-07-01T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2023-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Oneida 138 kV Substation","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":65.0,"dp1NrisMw":65.0,"dp2ErisMw":65.0,"dp2NrisMw":65.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396088,"projectNumber":"J1198","queueDate":"2019-04-25T04:00:00+00:00","inService":"2021-06-15T04:00:00+00:00","giaToExec":"2022-04-22T04:00:00+00:00","negInService":"2023-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Newton 345kV Substation","summerNetMW":51.8,"winterNetMW":51.8,"dp1ErisMw":51.8,"dp1NrisMw":51.8,"dp2ErisMw":51.8,"dp2NrisMw":51.8,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396089,"projectNumber":"J1077","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Cass County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta - Weeds Lake - Hiple 345kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396090,"projectNumber":"J1120","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-23T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Hill CO - Bayou Farms CO 138 kV Line Tap","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396091,"projectNumber":"J1122","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Pottawattamie County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Council Bluffs - Fallow Avenue 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396092,"projectNumber":"J1140","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER","county":"Benton County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Platte River 115 kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396093,"projectNumber":"J1141","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-09-07T04:00:00+00:00","inService":"2019-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Manistee County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Filer - BoxbdJ - Stronach 138kV Line Tap","summerNetMW":17.0,"winterNetMW":17.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396094,"projectNumber":"J1144","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-09-10T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2020-03-30T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"Covington County,Lamar County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Moselle - Columbia 161kV Line Tap","summerNetMW":96.0,"winterNetMW":96.0,"dp1ErisMw":96.0,"dp1NrisMw":96.0,"dp2ErisMw":96.0,"dp2NrisMw":96.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396095,"projectNumber":"J1103","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-06-30T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tuscola County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Bauer - (Kirk) - Ringle 345kV Line Tap","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396096,"projectNumber":"J1108","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-06-13T04:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES","county":"Douglas County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Alexandria 345 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396097,"projectNumber":"J1109","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass County","state":"ND","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bison 345kV Substation","summerNetMW":207.0,"winterNetMW":207.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396098,"projectNumber":"J1171","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2023-01-26T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dodge County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Butternut 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396099,"projectNumber":"J1173","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-06-30T04:00:00+00:00","inService":"2019-12-01T05:00:00+00:00","transmissionOwner":"CONSUMERS ENERGY COMPANY EDC","county":"Lenawee County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Raisin - METC Tap 138kV Line Tap","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396100,"projectNumber":"J1199","queueDate":"2019-04-25T04:00:00+00:00","inService":"2021-06-15T04:00:00+00:00","giaToExec":"2022-04-22T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Duck Creek 345kV Substation","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":20.0,"dp2NrisMw":20.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396101,"projectNumber":"J1285","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Duane Arnold - Tiffin (MEC) 345 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396102,"projectNumber":"J1288","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-04-16T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cayuga - Sugar Creek 345kVLine","summerNetMW":606.7,"winterNetMW":667.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396103,"projectNumber":"J1194","queueDate":"2019-04-24T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2020-08-04T04:00:00+00:00","negInService":"2021-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland County,Saginaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Murphy 138 kV Substation","summerNetMW":225.2,"winterNetMW":225.2,"dp1ErisMw":225.2,"dp1NrisMw":225.2,"dp2ErisMw":225.2,"dp2NrisMw":225.2,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service (with Provisional GIA)"},{"id":3396104,"projectNumber":"J1196","queueDate":"2019-04-25T04:00:00+00:00","doneDate":"2022-10-31T04:00:00+00:00","inService":"2022-08-29T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","negInService":"2025-08-09T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Sanilac County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood - Rapson (Banner) 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396105,"projectNumber":"J1240","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2019-11-01T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek 345kV Substation","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396106,"projectNumber":"J1241","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2024-12-10T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jefferson County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"West Mt Vernon - Xenia 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":165.0,"dp1NrisMw":165.0,"dp2ErisMw":165.0,"dp2NrisMw":165.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396107,"projectNumber":"J1275","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BRPS","county":"Henderson County","state":"KY","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Henderson 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396108,"projectNumber":"J1253","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2024-10-18T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2024-08-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Fond du Lac County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"South Fond Du Lac to Fitzgerald 345 kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396109,"projectNumber":"J1283","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2019-09-05T04:00:00+00:00","inService":"2023-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"White Bluff - Arsenal C and White Bluff - Arsenal D 115kV Line","summerNetMW":269.99,"winterNetMW":269.99,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Waste Heat Recovery","facilityType":"Co-gen","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396110,"projectNumber":"J1284","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Duane Arnold - Tiffin (MEC) 345 kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396111,"projectNumber":"J1243","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-05-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McDonough County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"E-NRIS","poiName":"Macomb West #2 - Blandlnsville Tap 69kV Line","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396112,"projectNumber":"J1273","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2019-11-05T05:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Marshall County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Burr Oak - East Winnamac 138 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396113,"projectNumber":"J1244","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-03-08T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Houghton County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Winona - Toivola - Portage Tap - Atlantic Mine 69kV Line","summerNetMW":38.4,"winterNetMW":38.4,"dp1ErisMw":38.4,"dp1NrisMw":38.4,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396114,"projectNumber":"J1246","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-04-06T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","giaToExec":"2022-04-06T04:00:00+00:00","negInService":"2025-09-20T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Iberville Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Bayou Labutte 500kV Substation","summerNetMW":725.2,"winterNetMW":725.2,"dp1ErisMw":705.0,"dp1NrisMw":705.0,"dp2ErisMw":705.2,"dp2NrisMw":705.2,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396115,"projectNumber":"J1242","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-05-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Hancock County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"E-NRIS","poiName":"Hamilton Line 796 Tap to Audrian 69kV Line","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396116,"projectNumber":"J1286","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2021-11-29T05:00:00+00:00","negInService":"2025-04-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Evangeline Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Manuel 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396117,"projectNumber":"J1287","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Tunica County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tunica - Crenshaw 115kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396118,"projectNumber":"J1245","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Stuttgart Ricuskey - Woodward 230 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396119,"projectNumber":"J1276","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-03-07T05:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Posey County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Point 69kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":47.1,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396120,"projectNumber":"J1247","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-05-31T04:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","giaToExec":"2020-03-11T04:00:00+00:00","negInService":"2021-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"St. Mary,St. Mary Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Ivanhoe 138kV Substation","summerNetMW":16.98,"winterNetMW":16.98,"dp1ErisMw":30.98,"dp1NrisMw":0.0,"dp2ErisMw":30.98,"dp2NrisMw":0.0,"fuelType":"Waste Heat Recovery","facilityType":"Co-gen","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396121,"projectNumber":"J1274","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Posey County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Point 69kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396122,"projectNumber":"J1277","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty County","state":"TX","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Pintail 138 kV Substation","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396123,"projectNumber":"J1248","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Marshall - Black Stone 138 kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396124,"projectNumber":"J1255","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-10-31T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","negInService":"2025-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Marquette - Vergennes 138 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396125,"projectNumber":"J1278","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Polk County","state":"TX","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Corrigan Bulk - Staley 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396126,"projectNumber":"J1251","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-09-08T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-09-09T04:00:00+00:00","negInService":"2025-06-12T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marquette County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Arnold - Perkins 138 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":80.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396127,"projectNumber":"J1256","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-06T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Dorset 120 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396128,"projectNumber":"J1258","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","negInService":"2024-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Lonoke County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"KEO EHV 500 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396129,"projectNumber":"J1249","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-01-20T05:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","giaToExec":"2022-01-21T05:00:00+00:00","negInService":"2022-07-24T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"Lamar County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Morrow 161 kV Substation","summerNetMW":600.0,"winterNetMW":600.0,"dp1ErisMw":600.0,"dp1NrisMw":600.0,"dp2ErisMw":600.0,"dp2NrisMw":600.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396130,"projectNumber":"J1290","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Manuel 138 kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396131,"projectNumber":"J1252","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-02-08T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marquette County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Arnold - Perkins 138 kV Line Tap","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396132,"projectNumber":"J1260","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Desha County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Dumas - Reed 115kV Line","summerNetMW":164.0,"winterNetMW":164.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396133,"projectNumber":"J1313","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Greene County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"161kV bus at Karma substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396134,"projectNumber":"J1324","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-11T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery County","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Midway 138kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396135,"projectNumber":"J1254","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Merom - Gibson - Wheatland 345kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396136,"projectNumber":"J1289","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2024-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Morgan County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Turner - Austin 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396137,"projectNumber":"J1292","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2026-08-25T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2021-05-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"ERIS","poiName":"Thompson Road 138kV Substation","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":198.0,"dp1NrisMw":198.0,"dp2ErisMw":198.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396138,"projectNumber":"J1323","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"LaGrange County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lagrange 138 kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":25.0,"dp2NrisMw":25.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396139,"projectNumber":"J1279","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-18T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin County","state":"TX","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Rye - Cypress 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396140,"projectNumber":"J1250","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Datto-Corning North 161 kV line","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396141,"projectNumber":"J1257","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-30T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-09-24T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Tangipahoa Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Chicken Farm - Amite 115 kV Line","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":20.0,"dp2NrisMw":20.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396142,"projectNumber":"J1280","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Brinkley East - Clarendon 115kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396143,"projectNumber":"J1259","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Pike County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Colonial Pipeline - Kentwood 115 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396144,"projectNumber":"J1261","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Clarendon - Brinkley East 115kV Line","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396145,"projectNumber":"J1291","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-14T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Catahoula Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Standard - Red Gum 115 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396146,"projectNumber":"J1281","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","giaToExec":"2022-01-28T05:00:00+00:00","negInService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ashley County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crossett - Monticello East 115kV Line","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396147,"projectNumber":"J1282","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-18T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Cooper - Penton Road 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396148,"projectNumber":"J1262","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2019-06-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wayne County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"ERIS","poiName":"Waterman 120kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":0.0,"dp2ErisMw":25.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396149,"projectNumber":"J1315","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-09-01T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood County,Murray County,Redwood County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lyon County - Cedar Mountain 345 kV Line Tap","summerNetMW":600.0,"winterNetMW":600.0,"dp1ErisMw":600.0,"dp1NrisMw":600.0,"dp2ErisMw":600.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396150,"projectNumber":"J1327","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-02-08T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Marquette - Vergennes 138 kV Line Tap","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396151,"projectNumber":"J1317","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-03T05:00:00+00:00","inService":"2022-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Sanilac County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Bennet 120kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396152,"projectNumber":"J1329","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-10-31T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","negInService":"2025-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Majestic - Milan 345 kV Line Tap","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":20.0,"dp2NrisMw":20.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396153,"projectNumber":"J1325","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-23T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2022-08-23T04:00:00+00:00","negInService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Rock County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Magnolia 161 kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":72.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396154,"projectNumber":"J1314","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-26T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2022-08-26T04:00:00+00:00","negInService":"2025-06-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE","county":"Polk County","state":"WI","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Apple River 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396155,"projectNumber":"J1328","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-22T05:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Grant County","state":"SD","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Stone South 345kV Sub","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396156,"projectNumber":"J1319","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","giaToExec":"2022-02-21T05:00:00+00:00","negInService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Huron County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Rapson 120kV Substation","summerNetMW":117.5,"winterNetMW":117.5,"dp1ErisMw":117.5,"dp1NrisMw":117.5,"dp2ErisMw":112.0,"dp2NrisMw":112.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396157,"projectNumber":"J1331","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-02-28T05:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood 120 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396158,"projectNumber":"J1321","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-21T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Story County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"O'Brien - Kossuth 345 kV Line Tap","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":65.0,"dp1NrisMw":65.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396159,"projectNumber":"J1344","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-03-05T05:00:00+00:00","inService":"2022-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Mills County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hastings 69 kV Substation","summerNetMW":48.0,"winterNetMW":48.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396160,"projectNumber":"J1345","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-03-08T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dodge County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Beaver Dam 69kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396161,"projectNumber":"J1326","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dane County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Rockdale 345 kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396162,"projectNumber":"J1318","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Rush County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Rushville 69kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396163,"projectNumber":"J1333","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2022-07-27T04:00:00+00:00","negInService":"2024-06-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Burr Oak 345kV Line","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":199.5,"dp1NrisMw":199.5,"dp2ErisMw":199.5,"dp2NrisMw":199.5,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396164,"projectNumber":"J1322","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-01-26T05:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Battle Creek - Oneida 345kV Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396165,"projectNumber":"J1366","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-04-02T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Eau Claire County","state":"WI","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Tremval - Seven Mile 161 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396166,"projectNumber":"J1368","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-30T05:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2021-04-28T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Pointe Coupee,Pointe Coupee Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Fancy Point - Waterloo 230 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":130.0,"dp2ErisMw":200.0,"dp2NrisMw":40.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396167,"projectNumber":"J1349","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-22T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Crandall 345 kV Substation","summerNetMW":335.0,"winterNetMW":335.0,"dp1ErisMw":335.0,"dp1NrisMw":335.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396168,"projectNumber":"J1369","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Dubois County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Dubois - Culley 138kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":85.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396169,"projectNumber":"J1316","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-10-30T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Kenosha County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Paris 138 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396170,"projectNumber":"J1346","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-29T04:00:00+00:00","inService":"2022-01-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wayne County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Brownstown 345kV Substation","summerNetMW":334.0,"winterNetMW":382.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396171,"projectNumber":"J1367","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-04-15T04:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","giaToExec":"2022-04-15T04:00:00+00:00","negInService":"2022-09-19T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"St. Mary,St. Mary Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Caneland 230kV Substation","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":95.0,"dp1NrisMw":95.0,"dp2ErisMw":95.0,"dp2NrisMw":48.65,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396172,"projectNumber":"J1350","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-04-07T04:00:00+00:00","doneDate":"2022-10-31T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","negInService":"2025-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Monroe County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Milan – Monroe – Morocco 345 kV Point","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396173,"projectNumber":"J1370","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-03-08T05:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Chippewa County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"9 Mile SW STA - Dafter 69kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396174,"projectNumber":"J1351","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Madison Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tallulah - Delhi 115kV Line Tap","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396175,"projectNumber":"J1372","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-30T05:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2021-04-28T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Pointe Coupee,Pointe Coupee Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Fancy Point - Waterloo 230 kV Line (J1368 POI)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":65.0,"dp2ErisMw":100.0,"dp2NrisMw":20.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396176,"projectNumber":"J1373","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2021-03-17T04:00:00+00:00","negInService":"2023-03-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"White County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Griffithville - Searcy Price 115 kV Line Tap","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":95.0,"dp1NrisMw":80.75,"dp2ErisMw":95.0,"dp2NrisMw":80.75,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396177,"projectNumber":"J1352","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2024-12-01T05:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Montgomery County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek - Montgomery 345kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396178,"projectNumber":"J1374","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-09-08T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2022-09-09T04:00:00+00:00","negInService":"2024-08-08T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Grant County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"ATC Ebenezer Sub on Lancaster-Eden 138kv line","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":67.2,"dp1NrisMw":67.2,"dp2ErisMw":67.2,"dp2NrisMw":67.2,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396179,"projectNumber":"J1365","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2024-09-06T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tama County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Traer 161-kV Substation","summerNetMW":169.4,"winterNetMW":169.4,"dp1ErisMw":169.4,"dp1NrisMw":169.4,"dp2ErisMw":169.4,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396180,"projectNumber":"J1348","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-04-20T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Vermillion County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cayuga - Sugar Creek 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396181,"projectNumber":"J1371","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-07T05:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Yellow Medicine County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Astoria 345kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396182,"projectNumber":"J1429","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-18T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPCM","county":"Juneau County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Whistiling Wings 69 kV Substation","summerNetMW":24.0,"winterNetMW":24.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396183,"projectNumber":"J1330","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Baldwin 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396184,"projectNumber":"J1320","queueDate":"2019-04-29T04:00:00+00:00","inService":"2019-04-20T04:00:00+00:00","giaToExec":"2022-11-15T05:00:00+00:00","negInService":"2025-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Branch County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Coldwater - Batavia 138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396185,"projectNumber":"J1426","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-26T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-08-26T04:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Benton County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Benton County 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396186,"projectNumber":"J1396","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2024-08-20T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Pike County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ratts-Victory 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396187,"projectNumber":"J1347","queueDate":"2019-04-26T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2021-03-22T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC","county":"Scott County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Pelahatchie - Scott 115 kV Line Tap","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":0.0,"dp2ErisMw":175.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396188,"projectNumber":"J1353","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-09-05T04:00:00+00:00","inService":"2023-05-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Lake County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Green Acres138kV Subtation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396189,"projectNumber":"J1427","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Benton County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Duane Arnold 345kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396190,"projectNumber":"J1416","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-21T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Worth County - Glenworth 161 kV Line tap","summerNetMW":149.0,"winterNetMW":149.0,"dp1ErisMw":149.0,"dp1NrisMw":149.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396191,"projectNumber":"J1428","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Cass County","state":"ND","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396192,"projectNumber":"J1418","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-02T05:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Joppa-Joppa North Bus 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396193,"projectNumber":"J1397","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-18T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPCM","county":"Juneau County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Whistling Wings 69 kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396194,"projectNumber":"J1398","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-12-01T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Pike County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ratts 161kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396195,"projectNumber":"J1419","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-05-20T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Greene County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Edwardsport - Amo 345 kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396196,"projectNumber":"J1432","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-10-31T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Salem  - Rock Creek 345kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396197,"projectNumber":"J1417","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-21T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Ledyard - Colby 345 kV Line Tap","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396198,"projectNumber":"J1395","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-09-01T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lyon County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hawks Nest Lake - Lyon County 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396199,"projectNumber":"J1430","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2023-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Verona - Foundary 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396200,"projectNumber":"J1436","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2022-11-15T05:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2023-07-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Morehouse Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Oak Ridge 115 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":0.0,"dp2ErisMw":50.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396201,"projectNumber":"J1431","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-04-07T04:00:00+00:00","inService":"2021-06-01T04:00:00+00:00","giaToExec":"2022-04-09T04:00:00+00:00","negInService":"2024-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"St. James Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Vacherie 230kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":90.0,"dp2NrisMw":90.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396202,"projectNumber":"J1420","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-03-05T05:00:00+00:00","inService":"2022-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Rock Island County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sub #107 69 kV Substation","summerNetMW":48.0,"winterNetMW":48.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396203,"projectNumber":"J1421","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-10-20T04:00:00+00:00","giaToExec":"2021-06-01T04:00:00+00:00","negInService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"East Feliciana Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Moler 230 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396204,"projectNumber":"J1433","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2019-10-22T04:00:00+00:00","inService":"2021-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lagen Holton-Franklinton 115kV (J1184)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396205,"projectNumber":"J1399","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Ingham County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Delhi - Churchill - Tompkins  138kV Line","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":90.0,"dp2NrisMw":90.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396206,"projectNumber":"J1438","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-06-28T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Fayette County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Windsor - Hazelton 161kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396207,"projectNumber":"J1439","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Tunica County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lula - Tunica 115 kV Line","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396208,"projectNumber":"J1440","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-01-25T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2022-01-26T05:00:00+00:00","negInService":"2024-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Tunica County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lula - Tunica 115 kV Line","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396209,"projectNumber":"J1400","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-07-30T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Marked Tree - Marion 161 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396210,"projectNumber":"J1434","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-01-25T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-01-26T05:00:00+00:00","negInService":"2024-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Monroe County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"J907 230kV Sub, Brinkley East - Aubrey 230 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396211,"projectNumber":"J1423","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-06-11T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Campbell - Blendon 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396212,"projectNumber":"J1435","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Dubuque County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Center Grove 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396213,"projectNumber":"J1424","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-09-15T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Cooper - Penton Road 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396214,"projectNumber":"J1425","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-01-27T05:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","giaToExec":"2022-01-28T05:00:00+00:00","negInService":"2022-05-19T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Jefferson County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Pine Bluff International Paper 115 kV substation","summerNetMW":114.0,"winterNetMW":114.0,"dp1ErisMw":0.0,"dp1NrisMw":114.0,"dp2ErisMw":0.0,"dp2NrisMw":114.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396215,"projectNumber":"J1402","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2023-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Jackson County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Cash  - Newport AB161kV Line","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396216,"projectNumber":"J1441","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-04-19T04:00:00+00:00","doneDate":"2022-04-06T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-04-02T04:00:00+00:00","negInService":"2025-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Terrebonne Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Schriever 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396217,"projectNumber":"J1404","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-07-23T04:00:00+00:00","inService":"2022-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Sunflower County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Drew 115kV Substation","summerNetMW":167.0,"winterNetMW":167.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396218,"projectNumber":"J1442","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-04T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2022-08-04T04:00:00+00:00","negInService":"2025-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Polk County","state":"TX","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Rich (SHECO) - Livingston 138 kV Line Tap","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":105.0,"dp1NrisMw":105.0,"dp2ErisMw":105.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396219,"projectNumber":"J1443","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-14T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Texas Eastern F SS - Strong SS 115 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396220,"projectNumber":"J1444","queueDate":"2019-04-29T04:00:00+00:00","inService":"2015-08-01T04:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Duane Arnold 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396221,"projectNumber":"J1487","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-18T05:00:00+00:00","inService":"2021-05-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Freeborn County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Freeborn 161kV substation","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396222,"projectNumber":"J1489","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-22T04:00:00+00:00","inService":"2024-03-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Ralls County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Maywood - Spencer Creek 345 kV Line Tap","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396223,"projectNumber":"J1445","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-10-04T04:00:00+00:00","negInService":"2025-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Benton County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Mayhew Lake 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396224,"projectNumber":"J1476","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Union County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Creston East 69 kV Substation (J1132)","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396225,"projectNumber":"J1479","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-18T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Des Moines County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Burlington 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396226,"projectNumber":"J1481","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-15T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-08-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Howard County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greentown 230 kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396227,"projectNumber":"J1480","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-04-14T04:00:00+00:00","inService":"2020-08-04T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Black Hawk County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Shawlis - Electric Farms 161kV Line","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396228,"projectNumber":"J310","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-11T05:00:00+00:00","inService":"2017-09-01T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Dodge County,Steele County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"West Owatonna-AL Corn Dist-Byron 161kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396229,"projectNumber":"J662","queueDate":"2016-07-11T04:00:00+00:00","withdrawnDate":"2019-01-03T05:00:00+00:00","doneDate":"2018-10-09T04:00:00+00:00","inService":"2018-10-15T04:00:00+00:00","giaToExec":"2018-05-15T04:00:00+00:00","negInService":"2020-07-31T04:00:00+00:00","transmissionOwner":"Entergy","county":"Crittenden County","state":"AR","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Marked Tree - Marion 161kV Line","summerNetMW":100.05,"winterNetMW":100.05,"dp1ErisMw":100.05,"dp1NrisMw":100.05,"dp2ErisMw":100.05,"dp2NrisMw":100.05,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396230,"projectNumber":"J635","queueDate":"2016-05-09T04:00:00+00:00","withdrawnDate":"2017-06-15T04:00:00+00:00","inService":"2018-02-28T05:00:00+00:00","transmissionOwner":"Entergy","county":"Concordia Parish","state":"LA","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396231,"projectNumber":"J679","queueDate":"2016-07-11T04:00:00+00:00","doneDate":"2018-10-12T04:00:00+00:00","inService":"2018-05-15T04:00:00+00:00","giaToExec":"2018-05-15T04:00:00+00:00","negInService":"2021-04-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Carroll County","state":"MS","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood - Winona 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396232,"projectNumber":"J680","queueDate":"2016-07-11T04:00:00+00:00","doneDate":"2018-10-09T04:00:00+00:00","inService":"2018-04-15T04:00:00+00:00","giaToExec":"2018-05-15T04:00:00+00:00","negInService":"2021-04-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Ashley County","state":"AR","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crosset West 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396233,"projectNumber":"J1484","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-14T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Texas Eastern F SS - Strong SS 115 kV Line Tap","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396234,"projectNumber":"J203","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2012-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Sanilac County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood - Banner 345kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396235,"projectNumber":"J659","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-04-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Franklin Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Winnsboro to Gilbert 115 kV line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396236,"projectNumber":"J628","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-11-09T05:00:00+00:00","doneDate":"2021-09-12T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2021-09-13T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Grand Forks County,Nelson County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Ramsey - Prairie 230kV Line Tap","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":400.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396237,"projectNumber":"J663","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-20T04:00:00+00:00","inService":"2018-10-01T04:00:00+00:00","giaToExec":"2019-10-03T04:00:00+00:00","negInService":"2022-05-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Phillips County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Robert E Ritchie 230kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396238,"projectNumber":"J441","queueDate":"2015-04-15T04:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2018-09-01T04:00:00+00:00","giaToExec":"2017-11-27T05:00:00+00:00","negInService":"2019-09-18T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dodge County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Byron 345 kV Substation","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":170.0,"dp2NrisMw":170.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396239,"projectNumber":"J447","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Emery 161 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396240,"projectNumber":"J467","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2017-11-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Douglas County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sidnay-Kansas 345kV Line","summerNetMW":102.0,"winterNetMW":102.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396241,"projectNumber":"J697","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-25T05:00:00+00:00","inService":"2022-10-15T04:00:00+00:00","giaToExec":"2019-06-03T04:00:00+00:00","negInService":"2022-10-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Morehouse Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Oak Ridge 115 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396242,"projectNumber":"J647","queueDate":"2016-06-20T04:00:00+00:00","withdrawnDate":"2018-09-06T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"BC Cobb - Four Mile 138kV Line","summerNetMW":147.4,"winterNetMW":147.4,"dp1ErisMw":124.95,"dp1NrisMw":124.95,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396243,"projectNumber":"J1488","queueDate":"2019-04-29T04:00:00+00:00","inService":"2024-03-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Randolph County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"McCredie - Montgomery 345 kV Line Tap","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":500.0,"dp2NrisMw":500.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396244,"projectNumber":"J1477","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2024-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Scott County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sub 56 161 kV Substation (J1131)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396245,"projectNumber":"J1483","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2022-09-09T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Iowa County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"ERIS","poiName":"Hill Valley 345 kV Substation","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":0.0,"dp2ErisMw":99.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396246,"projectNumber":"J1485","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","negInService":"2027-10-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Deuel County","state":"SD","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Astoria 345 kV Substation (J493/J510)","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396247,"projectNumber":"J683","queueDate":"2016-07-11T04:00:00+00:00","doneDate":"2018-09-11T04:00:00+00:00","inService":"2018-02-28T05:00:00+00:00","giaToExec":"2018-05-14T04:00:00+00:00","negInService":"2020-01-31T05:00:00+00:00","transmissionOwner":"Entergy","county":"West Baton Rouge Parish","state":"LA","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396248,"projectNumber":"J640","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-04-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"St. Helena Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Amite - Liberty 115kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396249,"projectNumber":"J458","queueDate":"2015-05-18T04:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-09-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Clark County","state":"SD","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396250,"projectNumber":"J698","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2015-11-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Chicot County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lake Village Bagby 115 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396251,"projectNumber":"J779","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Emmons County,Logan County","state":"ND","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bismarck-Linton 115kV","summerNetMW":51.0,"winterNetMW":51.0,"dp1ErisMw":50.4,"dp1NrisMw":50.4,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396252,"projectNumber":"J749","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2018-05-01T04:00:00+00:00","inService":"2018-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Redstone 138 kV Substation","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396253,"projectNumber":"J636","queueDate":"2016-05-09T04:00:00+00:00","withdrawnDate":"2017-06-20T04:00:00+00:00","inService":"2016-05-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Rapides Parish","state":"LA","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Shady Oaks - Coughlin 138kV Line","summerNetMW":52.0,"winterNetMW":52.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396254,"projectNumber":"J444","queueDate":"2015-05-07T04:00:00+00:00","withdrawnDate":"2018-04-12T04:00:00+00:00","inService":"2017-01-31T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wayne County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Waterman/Navarre 230kV","summerNetMW":235.0,"winterNetMW":235.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396255,"projectNumber":"J646","queueDate":"2016-06-16T04:00:00+00:00","doneDate":"2019-04-26T04:00:00+00:00","inService":"2010-07-01T04:00:00+00:00","giaToExec":"2018-12-12T05:00:00+00:00","negInService":"2010-07-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Macomb County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"ERIS","poiName":"Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations","summerNetMW":1.6,"winterNetMW":0.0,"dp1ErisMw":1.6,"dp1NrisMw":0.0,"dp2ErisMw":1.6,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396256,"projectNumber":"J478","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-04-17T04:00:00+00:00","inService":"2018-07-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Clinton County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Thorntown - New London - Kokomo 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396257,"projectNumber":"J771","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-07-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Stearns County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lake Koronis-Paynesville 69kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396258,"projectNumber":"J746","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"McHenry County,McLean County,Ward County","state":"ND","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Stanton-McHenry 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396259,"projectNumber":"J776","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-11-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Franklin County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Black Hawk-Killdeer 345kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396260,"projectNumber":"J748","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2020-03-20T04:00:00+00:00","inService":"2020-10-01T04:00:00+00:00","giaToExec":"2019-10-14T04:00:00+00:00","negInService":"2021-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Plymouth County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Highland - Raun 345kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":175.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396261,"projectNumber":"J782","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2018-05-31T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Stoddard County","state":"MO","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Stoddart sub 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396262,"projectNumber":"J783","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-07-24T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2019-04-18T04:00:00+00:00","negInService":"2021-04-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Spencer County","state":"IN","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Grandview Sub","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":69.9,"dp2ErisMw":70.0,"dp2NrisMw":69.9,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396263,"projectNumber":"J657","queueDate":"2016-07-08T04:00:00+00:00","withdrawnDate":"2018-04-10T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Manitowoc County","state":"WI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kewaunee - Shoto 138kV Line (at the existing Mishicot Tap)","summerNetMW":100.8,"winterNetMW":100.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396264,"projectNumber":"J777","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2019-11-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Whispering Willow 161kV substation","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396265,"projectNumber":"J780","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2020-12-15T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Sheridan County","state":"ND","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Harvey - Underwood 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396266,"projectNumber":"J752","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-10-10T04:00:00+00:00","inService":"2020-01-02T05:00:00+00:00","giaToExec":"2019-05-13T04:00:00+00:00","negInService":"2019-10-04T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tuscola County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Ringle 345kV Switchyard","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396267,"projectNumber":"J785","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson County,Martin County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lakefield Junction - Huntley 345 kV line (Tap)","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":105.0,"dp1NrisMw":105.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396268,"projectNumber":"J793","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-10-26T04:00:00+00:00","inService":"2021-05-14T04:00:00+00:00","giaToExec":"2019-05-06T04:00:00+00:00","negInService":"2021-05-14T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"St. Clair County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Belle River - Fitz #2 345 kV Line Tap","summerNetMW":1175.0,"winterNetMW":1175.0,"dp1ErisMw":1209.0,"dp1NrisMw":1209.0,"dp2ErisMw":1209.0,"dp2NrisMw":1175.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396269,"projectNumber":"J794","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-06-18T04:00:00+00:00","inService":"2018-09-10T04:00:00+00:00","giaToExec":"2018-02-06T05:00:00+00:00","negInService":"2018-10-26T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"J589 138kV Substation (Regal - Summerton 138kV Line)","summerNetMW":12.5,"winterNetMW":12.5,"dp1ErisMw":12.5,"dp1NrisMw":12.5,"dp2ErisMw":12.5,"dp2NrisMw":12.5,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396270,"projectNumber":"J757","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-05-31T04:00:00+00:00","inService":"2020-08-14T04:00:00+00:00","giaToExec":"2019-01-07T05:00:00+00:00","negInService":"2021-10-31T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Morgan County,Sangamon County","state":"IL","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Austin-Meredosia 345kV line","summerNetMW":303.6,"winterNetMW":303.6,"dp1ErisMw":303.6,"dp1NrisMw":303.6,"dp2ErisMw":303.6,"dp2NrisMw":303.6,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396271,"projectNumber":"J805","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-08T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-11-11T05:00:00+00:00","negInService":"2022-05-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Shelby County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gwynneville 345kV Substation","summerNetMW":199.0,"winterNetMW":199.0,"dp1ErisMw":199.0,"dp1NrisMw":199.0,"dp2ErisMw":199.0,"dp2NrisMw":199.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396272,"projectNumber":"J806","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-11T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2021-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Rice Creek - Vrooman 138kV Line Tap","summerNetMW":149.0,"winterNetMW":149.0,"dp1ErisMw":149.0,"dp1NrisMw":149.0,"dp2ErisMw":149.0,"dp2NrisMw":149.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396273,"projectNumber":"J808","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-06T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-01-17T05:00:00+00:00","negInService":"2020-07-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Aster Substation 138kV Bus","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396274,"projectNumber":"J823","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-06T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clark County","state":"MO","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Twin Rivers - Twin Rivers Tap - Palmyra 161kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396275,"projectNumber":"J842","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-02-10T05:00:00+00:00","inService":"2020-07-01T04:00:00+00:00","giaToExec":"2019-11-21T05:00:00+00:00","negInService":"2022-09-14T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Gibson County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gibson - Brown 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396276,"projectNumber":"J825","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Green County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Monroe - Albany 138kV Line","summerNetMW":99.9,"winterNetMW":99.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396277,"projectNumber":"J1437","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-12-22T05:00:00+00:00","inService":"2021-04-30T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-05-01T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION","county":"Carroll County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"AECC Dry Creek 161kV Switchyard Station","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396278,"projectNumber":"J1422","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-10-20T04:00:00+00:00","negInService":"2024-10-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Edwards County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Albion - Olney 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396279,"projectNumber":"J1401","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2023-11-17T05:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Batavia - Wagner 138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396280,"projectNumber":"J1403","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-03-08T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Marquette 138 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396281,"projectNumber":"J1478","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-18T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Des Moines County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntwoods 69 kV substation (J1135)","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396282,"projectNumber":"J1482","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-15T04:00:00+00:00","giaToExec":"2022-06-27T04:00:00+00:00","negInService":"2024-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"White County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Monticello - Springboro 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396283,"projectNumber":"J1490","queueDate":"2019-04-29T04:00:00+00:00","inService":"2024-03-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Randolph County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"McCredie - Montgomery 345 kV Line Tap","summerNetMW":1000.0,"winterNetMW":1000.0,"dp1ErisMw":1000.0,"dp1NrisMw":1000.0,"dp2ErisMw":1000.0,"dp2NrisMw":940.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396284,"projectNumber":"J632","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2018-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Berrien County,Van Buren County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta - Plaisades 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396285,"projectNumber":"J418","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2016-11-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Polk County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Rich - Livingston 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396286,"projectNumber":"J639","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2022-10-31T04:00:00+00:00","doneDate":"2019-12-02T05:00:00+00:00","inService":"2019-04-01T04:00:00+00:00","giaToExec":"2019-06-03T04:00:00+00:00","negInService":"2020-11-25T05:00:00+00:00","transmissionOwner":"Entergy","county":"West Baton Rouge Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Addis - Big Cajun 230kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396287,"projectNumber":"J687","queueDate":"2016-07-11T04:00:00+00:00","withdrawnDate":"2017-02-17T05:00:00+00:00","inService":"2019-06-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Orleans Parish","state":"LA","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Nasa 115kV Substation","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396288,"projectNumber":"J701","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-06T04:00:00+00:00","inService":"2017-09-15T04:00:00+00:00","giaToExec":"2018-04-24T04:00:00+00:00","negInService":"2018-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tuscola County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Rapson - Grasssmere - Bauer 345kV Line Tap (Kirk 345 kV Sub)","summerNetMW":49.0,"winterNetMW":49.0,"dp1ErisMw":49.0,"dp1NrisMw":49.0,"dp2ErisMw":49.0,"dp2NrisMw":49.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396289,"projectNumber":"J658","queueDate":"2016-07-07T04:00:00+00:00","withdrawnDate":"2017-06-21T04:00:00+00:00","inService":"2018-09-15T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Audrain County","state":"MO","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek 345 kV Substation","summerNetMW":100.05,"winterNetMW":100.05,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396290,"projectNumber":"J747","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2017-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Deuel County","state":"SD","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Brooking County - Big Stone South (J510 Tap - J630 Tap) 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396291,"projectNumber":"J750","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2025-07-07T04:00:00+00:00","doneDate":"2020-01-14T05:00:00+00:00","inService":"2019-08-15T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2022-05-15T04:00:00+00:00","transmissionOwner":"City of Springfield, IL - CWLP","county":"Morgan County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Westchester 138kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396292,"projectNumber":"J754","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2020-09-30T04:00:00+00:00","doneDate":"2019-04-11T04:00:00+00:00","inService":"2019-03-08T05:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2020-04-30T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Montgomery County","state":"IN","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cayuga - Nucor 345kV","summerNetMW":303.6,"winterNetMW":303.6,"dp1ErisMw":303.6,"dp1NrisMw":303.6,"dp2ErisMw":303.6,"dp2NrisMw":303.6,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396293,"projectNumber":"J816","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2022-09-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Cass County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo 115kV Substation","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396294,"projectNumber":"J817","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-17T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-10-29T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Warren County","state":"MO","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Warrenton 161kV Substation","summerNetMW":139.0,"winterNetMW":139.0,"dp1ErisMw":139.0,"dp1NrisMw":139.0,"dp2ErisMw":139.0,"dp2NrisMw":139.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396295,"projectNumber":"J837","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-10-21T04:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-08-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"White County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345kV Substation","summerNetMW":200.1,"winterNetMW":200.1,"dp1ErisMw":200.1,"dp1NrisMw":80.0,"dp2ErisMw":200.1,"dp2NrisMw":80.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396296,"projectNumber":"J820","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-08-03T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Oneida 345kV Substation","summerNetMW":100.05,"winterNetMW":100.05,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396297,"projectNumber":"J839","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-05-27T04:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2023-03-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Lapeer County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Otsego Tap - Otsego 120 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":58.0,"dp1NrisMw":58.0,"dp2ErisMw":58.0,"dp2NrisMw":58.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396298,"projectNumber":"J830","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-05T05:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","giaToExec":"2019-09-12T04:00:00+00:00","negInService":"2021-11-15T05:00:00+00:00","transmissionOwner":"Entergy","county":"Madison County","state":"MS","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Canton South to Hoy Road 230 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396299,"projectNumber":"J813","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-16T05:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-10-29T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Louisville South Substation 138kV Line","summerNetMW":275.0,"winterNetMW":275.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396300,"projectNumber":"J834","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-06T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2019-10-03T04:00:00+00:00","negInService":"2021-11-15T05:00:00+00:00","transmissionOwner":"Entergy","county":"Phillips County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Robert E Ritchie 230kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396301,"projectNumber":"J753","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2025-10-31T04:00:00+00:00","doneDate":"2019-03-08T05:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2021-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION","county":"Breckinridge County","state":"KY","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hardinsburg Sub 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396302,"projectNumber":"J818","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-06T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-11-01T04:00:00+00:00","negInService":"2022-04-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Jefferson County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Jefferson 138kV Substation","summerNetMW":149.0,"winterNetMW":149.0,"dp1ErisMw":149.0,"dp1NrisMw":149.0,"dp2ErisMw":149.0,"dp2NrisMw":149.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396303,"projectNumber":"J838","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-10-21T04:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-08-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"White County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345kV Substation","summerNetMW":200.1,"winterNetMW":200.1,"dp1ErisMw":100.0,"dp1NrisMw":40.0,"dp2ErisMw":100.0,"dp2NrisMw":40.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396304,"projectNumber":"J826","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-17T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-05-28T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Weedman Substation 138kV Bus","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396305,"projectNumber":"J756","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-03-26T04:00:00+00:00","inService":"2019-08-15T04:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2020-04-23T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan County","state":"IL","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Mason City to Fogarty 138kV","summerNetMW":202.4,"winterNetMW":202.4,"dp1ErisMw":202.4,"dp1NrisMw":202.4,"dp2ErisMw":202.4,"dp2NrisMw":202.4,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396306,"projectNumber":"J836","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2021-11-01T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2022-09-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Kossuth County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Ledyard 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396307,"projectNumber":"J821","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-05-26T04:00:00+00:00","doneDate":"2019-10-17T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-05-10T04:00:00+00:00","negInService":"2021-08-27T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marathon County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Wein - Stratford 115 kV Line Tap","summerNetMW":99.9,"winterNetMW":99.9,"dp1ErisMw":99.9,"dp1NrisMw":99.9,"dp2ErisMw":99.9,"dp2NrisMw":99.9,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396308,"projectNumber":"J827","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Fountain County,Montgomery County,Tippecanoe County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lafayette - Veedsburg West - Attica 230kV Line","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396309,"projectNumber":"J828","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-02-07T05:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Montgomery County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Crawfordsville - Linden Tap 138kV Line","summerNetMW":151.8,"winterNetMW":151.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396310,"projectNumber":"J807","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-05-26T04:00:00+00:00","doneDate":"2019-10-17T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-05-10T04:00:00+00:00","negInService":"2021-08-27T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Lafayette County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Darlington - Hillman 138kV Line (Falcon Substation J395)","summerNetMW":41.4,"winterNetMW":41.4,"dp1ErisMw":41.4,"dp1NrisMw":41.4,"dp2ErisMw":41.4,"dp2NrisMw":41.4,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396311,"projectNumber":"J841","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-01-24T05:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","transmissionOwner":"METC","county":"Saginaw County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Orr RD 138 kV Substation","summerNetMW":702.0,"winterNetMW":725.0,"dp1ErisMw":725.0,"dp1NrisMw":725.0,"dp2ErisMw":725.0,"dp2NrisMw":702.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396312,"projectNumber":"J831","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-12T05:00:00+00:00","inService":"2017-06-16T04:00:00+00:00","giaToExec":"2019-08-01T04:00:00+00:00","negInService":"2019-10-28T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Ozaukee County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Port Washington Generating Switchyard 138 kV","summerNetMW":40.0,"winterNetMW":48.0,"dp1ErisMw":48.0,"dp1NrisMw":48.0,"dp2ErisMw":48.0,"dp2NrisMw":48.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396313,"projectNumber":"J810","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-08-31T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Audubon County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Atlantic to Adair 161 kV line","summerNetMW":139.6,"winterNetMW":145.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396314,"projectNumber":"J844","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-10T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-05-28T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Knox County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Sandburg Substation 138kV Bus","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":147.0,"dp1NrisMw":0.0,"dp2ErisMw":147.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396315,"projectNumber":"J819","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-05-26T04:00:00+00:00","doneDate":"2020-05-20T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-11-14T05:00:00+00:00","negInService":"2021-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Lafayette County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Darlington 138kV Substation","summerNetMW":99.9,"winterNetMW":99.9,"dp1ErisMw":99.9,"dp1NrisMw":99.9,"dp2ErisMw":99.9,"dp2NrisMw":99.9,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396316,"projectNumber":"J840","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Humboldt County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Kossuth - Webster 345 kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396317,"projectNumber":"J876","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-07-23T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntley 345kV sub","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396318,"projectNumber":"J848","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2026-01-20T05:00:00+00:00","doneDate":"2020-04-17T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2019-07-23T04:00:00+00:00","negInService":"2021-05-28T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Pana Substation 138kV Bus","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":235.0,"dp2NrisMw":235.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396319,"projectNumber":"J815","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2026-03-02T05:00:00+00:00","doneDate":"2020-04-16T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2019-11-04T05:00:00+00:00","negInService":"2022-10-28T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Christian County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Taylorville South-Austin (formerly Pawnee)138kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396320,"projectNumber":"J835","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-04-17T04:00:00+00:00","inService":"2020-07-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Morgan County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Meredosia - Austin 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396321,"projectNumber":"J881","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-07-17T04:00:00+00:00","inService":"2019-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Newton 138kV Substation","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396322,"projectNumber":"J850","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-24T04:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","giaToExec":"2019-11-08T05:00:00+00:00","negInService":"2022-09-24T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"RCEC Bradford - W. Darien 138kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396323,"projectNumber":"J822","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2019-01-30T05:00:00+00:00","transmissionOwner":"Entergy","county":"Lonoke County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lynch SES Switchyard - Carlisle 115kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396324,"projectNumber":"J829","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-26T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2019-11-21T05:00:00+00:00","negInService":"2022-09-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Sullivan County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Dresser - Merom 345kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396325,"projectNumber":"J832","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-06-02T04:00:00+00:00","doneDate":"2020-06-12T04:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2022-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Cheboygan County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Port Calcite - Riggsville 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":91.0,"dp1NrisMw":91.0,"dp2ErisMw":91.0,"dp2NrisMw":91.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396326,"projectNumber":"J833","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-10-22T04:00:00+00:00","doneDate":"2020-06-17T04:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2022-04-29T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Milan-Pioneer 120kV line tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396327,"projectNumber":"J866","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-06T04:00:00+00:00","inService":"2020-03-30T04:00:00+00:00","giaToExec":"2019-10-03T04:00:00+00:00","negInService":"2021-07-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Tunica County","state":"MS","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Batesville - Robert E. Ritchie 230 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396328,"projectNumber":"J847","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-09-17T04:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2019-07-19T04:00:00+00:00","negInService":"2021-04-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer Tap 138kV Substation","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":90.0,"dp2NrisMw":90.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396329,"projectNumber":"J879","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-05-11T04:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Baraga County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Lake 138 kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396330,"projectNumber":"J867","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-09-29T04:00:00+00:00","transmissionOwner":"Entergy","county":"Polk County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Gulf Livingston - SHECO Menard","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396331,"projectNumber":"J845","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-06T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2019-07-22T04:00:00+00:00","negInService":"2021-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Ford County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gibson City South - Paxton East 138kV Line","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":52.0,"dp2ErisMw":120.0,"dp2NrisMw":52.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396332,"projectNumber":"J814","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-04T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Clark County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Eau Claire - Arpin 345kV Line","summerNetMW":99.9,"winterNetMW":99.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396333,"projectNumber":"J824","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-04-17T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Sullivan County,Vigo County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Vigo-Farmersburg Junction 138kV Line","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396334,"projectNumber":"J809","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Bass Creek - Black River 138 kV Line Tap","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396335,"projectNumber":"J846","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Hillsdale County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Moore Roadtyd - Coldwater Creek 138 kV Line Tap","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396336,"projectNumber":"J878","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-28T04:00:00+00:00","inService":"2021-09-10T04:00:00+00:00","giaToExec":"2019-11-08T05:00:00+00:00","negInService":"2022-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Kenosha County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Paris 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396337,"projectNumber":"J843","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-02-10T05:00:00+00:00","inService":"2020-07-01T04:00:00+00:00","giaToExec":"2019-11-21T05:00:00+00:00","negInService":"2021-09-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Gibson County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gibson - Francisco 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396338,"projectNumber":"J812","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-10-26T04:00:00+00:00","inService":"2017-06-16T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Covert - Palisades 345kV Line","summerNetMW":1108.0,"winterNetMW":1217.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396339,"projectNumber":"J849","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2022-04-19T04:00:00+00:00","doneDate":"2019-06-26T04:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2019-01-24T05:00:00+00:00","negInService":"2022-04-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Delta County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Chandler 138 kV Substation","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396340,"projectNumber":"J869","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Sherburne County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cable - Cable Tap 69kV Substation","summerNetMW":49.98,"winterNetMW":49.98,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396341,"projectNumber":"J877","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2023-07-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Palo Alto County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Obrien - Kossuth 345kV Line (J529 & J590 New Substation)","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396342,"projectNumber":"J880","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Ward County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Magic City 230kV sub","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396343,"projectNumber":"J852","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-07-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Ouachita Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Rilla - Riverton 115kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396344,"projectNumber":"J853","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-20T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-05-28T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"White County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Norris City North Substation 138kV Bus","summerNetMW":149.0,"winterNetMW":149.0,"dp1ErisMw":149.0,"dp1NrisMw":149.0,"dp2ErisMw":149.0,"dp2NrisMw":149.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396345,"projectNumber":"J868","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-05T05:00:00+00:00","giaToExec":"2019-09-12T04:00:00+00:00","negInService":"1990-12-03T05:00:00+00:00","transmissionOwner":"Entergy","county":"Concordia Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Plantation 115 kV Substation","summerNetMW":37.2,"winterNetMW":37.2,"dp1ErisMw":0.0,"dp1NrisMw":25.33,"dp2ErisMw":0.0,"dp2NrisMw":23.5,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396346,"projectNumber":"J870","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-02-21T05:00:00+00:00","inService":"2021-09-10T04:00:00+00:00","giaToExec":"2019-11-14T05:00:00+00:00","negInService":"2020-08-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Grant County,Iowa County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Eden - Wyoming Valley 138kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396347,"projectNumber":"J854","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-08-08T04:00:00+00:00","inService":"2019-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Baldwin 138KV Substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396348,"projectNumber":"J874","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2024-07-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Fenton - Chanarambie 115kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396349,"projectNumber":"J884","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-12-18T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-05-28T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Brokaw - Gibson City South 138 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396350,"projectNumber":"J872","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macon County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Blue Mount tap on the Pana-Route 51D-1462 138kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396351,"projectNumber":"J871","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-02-21T05:00:00+00:00","inService":"2021-09-10T04:00:00+00:00","giaToExec":"2019-11-14T05:00:00+00:00","negInService":"2021-08-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Grant County,Iowa County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Eden - Wyoming Valley 138kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396352,"projectNumber":"J885","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"J407 Glenworth 161kV Substation","summerNetMW":64.0,"winterNetMW":64.0,"dp1ErisMw":64.0,"dp1NrisMw":64.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396353,"projectNumber":"J875","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-08-06T04:00:00+00:00","inService":"2020-09-10T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2022-11-18T05:00:00+00:00","transmissionOwner":"METC","county":"Lenawee County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Par - Raisin Road 138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396354,"projectNumber":"J938","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-10-09T04:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Palo Alto County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Emmestburg - Freedom 69kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396355,"projectNumber":"J882","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-08-08T04:00:00+00:00","inService":"2019-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Coffeen North 138kV Substation","summerNetMW":15.0,"winterNetMW":15.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396356,"projectNumber":"J883","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-12-04T05:00:00+00:00","doneDate":"2019-12-04T05:00:00+00:00","inService":"2020-10-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2022-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Pulaski County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Monticello-East Winamac","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":80.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396357,"projectNumber":"J851","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2019-10-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Henry County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Fall Creek - New Castle 138kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396358,"projectNumber":"J873","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-07-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hardin County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Killdeer- Blackhawk 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396359,"projectNumber":"J855","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-14T05:00:00+00:00","inService":"2019-08-01T04:00:00+00:00","giaToExec":"2019-08-26T04:00:00+00:00","negInService":"2020-11-06T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Grant County,Iowa County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Lancaster - Eden 138 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":99.99,"dp2NrisMw":99.99,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396360,"projectNumber":"J906","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-02-07T05:00:00+00:00","inService":"2020-07-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","transmissionOwner":"METC","county":"Muskegon County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kenowa - Ludington 345 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396361,"projectNumber":"J937","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2020-10-21T04:00:00+00:00","doneDate":"2020-06-11T04:00:00+00:00","inService":"2020-05-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2022-12-29T05:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta - Tompkins 345kV Line Tap","summerNetMW":507.0,"winterNetMW":535.0,"dp1ErisMw":535.0,"dp1NrisMw":535.0,"dp2ErisMw":535.0,"dp2NrisMw":507.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396362,"projectNumber":"J896","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-06-18T04:00:00+00:00","inService":"2019-10-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Crawford County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Victory 161 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396363,"projectNumber":"J898","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2021-09-26T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2021-09-27T04:00:00+00:00","negInService":"2023-11-30T05:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE","county":"Howard County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Rice - Beaver Creek 161kV line tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396364,"projectNumber":"J899","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-03-25T04:00:00+00:00","inService":"2019-10-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Carroll County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Green Forest South - Harrison West 161kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396365,"projectNumber":"J928","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-04-19T04:00:00+00:00","inService":"2019-08-15T04:00:00+00:00","giaToExec":"2019-01-23T05:00:00+00:00","negInService":"2019-10-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Delta County,Schoolcraft County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Garden Corners 138 kV Substation","summerNetMW":79.99,"winterNetMW":79.99,"dp1ErisMw":79.99,"dp1NrisMw":79.99,"dp2ErisMw":79.99,"dp2NrisMw":79.99,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396366,"projectNumber":"J907","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-24T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2019-10-03T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Monroe County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Brinkley East - Aubrey 230 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396367,"projectNumber":"J931","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-04-23T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kenowa 345kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396368,"projectNumber":"J909","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-22T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2019-06-06T04:00:00+00:00","negInService":"2022-02-15T05:00:00+00:00","transmissionOwner":"Entergy","county":"Tangipahoa Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Amite 115 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396369,"projectNumber":"J939","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-10-12T04:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Wright County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Clarion-Eagle Grove 69kV line","summerNetMW":38.0,"winterNetMW":38.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396370,"projectNumber":"J897","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","doneDate":"2022-08-03T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2021-09-13T04:00:00+00:00","negInService":"2024-10-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Grand Forks County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Prairie - Ramsey 230 kV line","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":190.0,"dp1NrisMw":190.0,"dp2ErisMw":190.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396371,"projectNumber":"J929","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2021-06-30T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"McIntosh County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Wishek 41.6 kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396372,"projectNumber":"J908","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-04T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2019-09-12T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Tallahatchie County","state":"MS","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Webb 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396373,"projectNumber":"J919","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-21T05:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2019-06-03T04:00:00+00:00","negInService":"2022-02-02T05:00:00+00:00","transmissionOwner":"Entergy","county":"Jackson County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Cash - Newport AB 161 kV Line Tap","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396374,"projectNumber":"J901","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-05-26T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Redwood County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Lyon County - Cedar Mountain Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396375,"projectNumber":"J930","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-11-16T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Sioux County","state":"IA","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Boyden - Sheldon 69kV line","summerNetMW":38.0,"winterNetMW":38.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396376,"projectNumber":"J932","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Liberty County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Porter - China 230 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396377,"projectNumber":"J927","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault County,Freeborn County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Walters 69 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396378,"projectNumber":"J916","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2020-07-06T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cottonwood County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Mountain Lake 69kV Substation","summerNetMW":2.0,"winterNetMW":2.0,"dp1ErisMw":2.0,"dp1NrisMw":2.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Diesel","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396379,"projectNumber":"J917","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-11-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Liberty County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tarkington - New Long John 138kV line tap","summerNetMW":78.0,"winterNetMW":78.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396380,"projectNumber":"J900","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Livingston Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Coly - Vignes 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396381,"projectNumber":"J920","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-08-29T04:00:00+00:00","inService":"2019-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Joppa 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396382,"projectNumber":"J910","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Hinds County","state":"MS","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Clinton Industrial 230kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396383,"projectNumber":"J933","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Day County","state":"SD","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Ellendale - Big Stone South 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396384,"projectNumber":"J911","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Montgomery County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Porter 230kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396385,"projectNumber":"J921","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-04-23T04:00:00+00:00","inService":"2019-07-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Thompson Road 138 kV Substation","summerNetMW":146.7,"winterNetMW":146.7,"dp1ErisMw":146.7,"dp1NrisMw":146.7,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396386,"projectNumber":"J912","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-16T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-11-04T05:00:00+00:00","negInService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Pana Substation 138kV Bus","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396387,"projectNumber":"J914","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2019-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Manistee County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Filer City 138 kV Substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396388,"projectNumber":"J940","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-06T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Burleigh County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Jamestown - Center 345kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396389,"projectNumber":"J902","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Ashley County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"AECC Mist to Montrose 115 kV line","summerNetMW":99.96,"winterNetMW":99.96,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396390,"projectNumber":"J935","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-04T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Hubbard County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hubbard - Badoura 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396391,"projectNumber":"J923","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Montgomery County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Porter 230kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396392,"projectNumber":"J936","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2020-05-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta - Tompkins 345kV Line Tap","summerNetMW":507.0,"winterNetMW":535.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396393,"projectNumber":"J934","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-02-28T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2019-09-12T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Crittenden County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Kuhn 161kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396394,"projectNumber":"J922","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-06-30T04:00:00+00:00","transmissionOwner":"Entergy","county":"Chicot County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lake Village Bagby - Chicot 115kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396395,"projectNumber":"J904","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Ashley County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Hamburg - Mist 115kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396396,"projectNumber":"J924","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Monroe County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Brinkley East - Aubrey 230 kV line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396397,"projectNumber":"J951","queueDate":"2018-02-02T05:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2018-11-15T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Kittson County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Donaldson - Warsaw 115 kV Line Tap","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396398,"projectNumber":"J944","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-17T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2019-07-10T04:00:00+00:00","negInService":"2022-10-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"New Madrid County","state":"MO","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Portageville - New Madrid 161kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396399,"projectNumber":"J984","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-07T04:00:00+00:00","inService":"2021-06-01T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2022-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Nelson Road – Murphy 345kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396400,"projectNumber":"J971","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Nobles County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Nobles Co - Fenton 115 kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396401,"projectNumber":"J905","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pipestone County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo Ridge 115kV Substation","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396402,"projectNumber":"J925","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-04-24T04:00:00+00:00","inService":"2019-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Cournna - Bell Road 138 kV line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396403,"projectNumber":"J903","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-06T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2023-05-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Henry County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greensboro 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396404,"projectNumber":"J913","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-03T05:00:00+00:00","inService":"2020-08-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2022-08-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"White County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":160.0,"dp2ErisMw":200.0,"dp2NrisMw":160.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396405,"projectNumber":"J926","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2021-06-03T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-06-04T04:00:00+00:00","negInService":"2023-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Saint Croix County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Pine Lake - Apple River 161 kV Line","summerNetMW":101.28,"winterNetMW":101.28,"dp1ErisMw":101.28,"dp1NrisMw":101.28,"dp2ErisMw":101.28,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396406,"projectNumber":"J981","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Washington County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sub T 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396407,"projectNumber":"J915","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Liberty County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Parkway - East Gate 138kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396408,"projectNumber":"J943","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-03-12T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lincoln County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"J460 substation on the Brookings - H081 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396409,"projectNumber":"J945","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"Entergy","county":"Washington County","state":"MS","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Gerald Andrus - Clinton Industrial 230 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396410,"projectNumber":"J986","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-05T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2021-05-05T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Wood County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Port Edwards - Sand Lake 138kV","summerNetMW":149.76,"winterNetMW":149.76,"dp1ErisMw":149.76,"dp1NrisMw":149.76,"dp2ErisMw":149.76,"dp2NrisMw":149.76,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396411,"projectNumber":"J955","queueDate":"2018-03-08T05:00:00+00:00","doneDate":"2022-04-26T04:00:00+00:00","inService":"2021-11-01T04:00:00+00:00","giaToExec":"2022-04-27T04:00:00+00:00","negInService":"2025-01-31T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Sangamon County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Austin Substation 345kV Bus","summerNetMW":1040.0,"winterNetMW":1165.0,"dp1ErisMw":1165.0,"dp1NrisMw":1165.0,"dp2ErisMw":1165.0,"dp2NrisMw":1165.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396412,"projectNumber":"J947","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-17T04:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","giaToExec":"2019-11-14T05:00:00+00:00","negInService":"2023-07-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Grant County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Potosis - Hillman 138kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396413,"projectNumber":"J952","queueDate":"2018-02-05T05:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Corson County","state":"SD","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"McLaughlin - McIntosh Junction 115 kV Line Tap","summerNetMW":54.0,"winterNetMW":54.0,"dp1ErisMw":54.0,"dp1NrisMw":54.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396414,"projectNumber":"J982","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-06-01T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-03-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Dickinson County,Emmet County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Obrien County - Kossuth 345 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396415,"projectNumber":"J983","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Brown County,LaSalle County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Oglesby - Minonk Tap 138kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396416,"projectNumber":"J954","queueDate":"2018-03-08T05:00:00+00:00","doneDate":"2022-08-12T04:00:00+00:00","inService":"2016-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Johnson County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"E-NRIS","poiName":"AMIL.IOW_AFRYT","summerNetMW":1.4,"winterNetMW":1.4,"dp1ErisMw":1.4,"dp1NrisMw":1.4,"dp2ErisMw":1.4,"dp2NrisMw":1.4,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396417,"projectNumber":"J972","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"St. Francis County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Hughes-Forest City South 161kv line","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396418,"projectNumber":"J948","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Poinsett County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Harrisburg Tap - Harrisburg 161kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396419,"projectNumber":"J987","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2025-10-20T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-10-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Montgomery County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Montgomery 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396420,"projectNumber":"J974","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2025-06-25T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-15T04:00:00+00:00","negInService":"2023-10-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton County,Peoria County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Mapleridge 345kV Switching Station","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":225.0,"dp2NrisMw":225.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396421,"projectNumber":"J946","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-05-26T04:00:00+00:00","inService":"2020-07-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bison 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396422,"projectNumber":"J985","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-06T05:00:00+00:00","inService":"2020-12-01T05:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Scott County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Miner - Kelso 161kV Line Tap","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396423,"projectNumber":"J990","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-02-15T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Dubuque County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Salem 345kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396424,"projectNumber":"J977","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson County,Martin County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Jackson North 161kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396425,"projectNumber":"J989","queueDate":"2018-02-12T05:00:00+00:00","withdrawnDate":"2020-06-30T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Oakland County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Halsey 138kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396426,"projectNumber":"J959","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"SMMPA","county":"Fayette County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Windsor 161kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396427,"projectNumber":"J941","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2020-07-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant County","state":"SD","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Stone-Brookings County 345KV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396428,"projectNumber":"J942","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-03-25T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Craighead County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Cash - Newport AB 161kV Line Tap","summerNetMW":107.0,"winterNetMW":107.0,"dp1ErisMw":107.0,"dp1NrisMw":107.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396429,"projectNumber":"J979","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-10-18T04:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Pana Substation 345kV Bus","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":170.0,"dp2NrisMw":170.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396430,"projectNumber":"J992","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Cass County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Walton 230kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396431,"projectNumber":"J988","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"Wayne County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"W Waynesboro 230kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396432,"projectNumber":"J958","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lincoln County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo Ridge 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396433,"projectNumber":"J953","queueDate":"2018-03-08T05:00:00+00:00","doneDate":"2022-08-12T04:00:00+00:00","inService":"2006-01-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Johnson County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"E-NRIS","poiName":"AMIL.IOW_AFRYT","summerNetMW":1.83,"winterNetMW":2.0,"dp1ErisMw":1.83,"dp1NrisMw":2.0,"dp2ErisMw":1.83,"dp2NrisMw":2.0,"fuelType":"Diesel","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396434,"projectNumber":"J956","queueDate":"2018-03-09T05:00:00+00:00","doneDate":"2021-12-22T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","giaToExec":"2021-12-22T05:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Ralls County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396435,"projectNumber":"J994","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2025-10-20T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-08-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Callaway County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Guthrie 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396436,"projectNumber":"J997","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"LaMoure County","state":"ND","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Ellendale 345 kV Sub, 230 kV Bus - 661098","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396437,"projectNumber":"J973","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-19T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Coles County,Edgar County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kansas West 345kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396438,"projectNumber":"J949","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-10T05:00:00+00:00","inService":"2020-08-31T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2020-10-31T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Coles County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kansas Substation 138kV Bus #3","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":170.0,"dp2ErisMw":200.0,"dp2NrisMw":170.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396439,"projectNumber":"J975","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-07-28T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Cass County","state":"ND","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Buffalo 115kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396440,"projectNumber":"J976","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Warren County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Montgomery - Enon 345kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396441,"projectNumber":"J2321","queueDate":"2022-05-16T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Lamar","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Columbia to Plant Morrow 161kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396442,"projectNumber":"J1492","queueDate":"2020-06-12T04:00:00+00:00","withdrawnDate":"2023-02-22T05:00:00+00:00","inService":"2023-08-15T04:00:00+00:00","transmissionOwner":"METC","county":"Kent","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Gaines 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396443,"projectNumber":"J957","queueDate":"2018-03-09T05:00:00+00:00","withdrawnDate":"2019-03-19T04:00:00+00:00","inService":"2010-09-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Mercer County,Putnam County,Sullivan County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Maywood 345kV Substation","summerNetMW":800.0,"winterNetMW":800.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396444,"projectNumber":"J960","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-21T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Presque Isle County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Livingston 345kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396445,"projectNumber":"J980","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-06T05:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Pana Substation 345kV Bus","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396446,"projectNumber":"J995","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-06T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Brown County,Jersey County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"NW Jerseyville Northwest Substation 138kV Bus","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396447,"projectNumber":"J993","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-11-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Boone County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hortonville - Whitestown 345kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396448,"projectNumber":"J999","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Fairfax 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396449,"projectNumber":"J978","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-11-21T05:00:00+00:00","inService":"2021-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Montcalm County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Eureka - Vestaburg 138kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396450,"projectNumber":"J991","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Xenia 345kV Switching Station","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396451,"projectNumber":"J1359","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","negInService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Oakridge 69 kV Substation","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":95.0,"dp1NrisMw":95.0,"dp2ErisMw":95.0,"dp2NrisMw":95.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396452,"projectNumber":"J2322","queueDate":"2025-11-20T05:00:00+00:00","inService":"2025-07-02T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Coughlin - Pine Prairie 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396453,"projectNumber":"J1491","queueDate":"2020-06-03T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2022-12-15T05:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Marion","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"IPL EW Stout North  Yard 138 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396454,"projectNumber":"J1495","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2023-01-31T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"North Rochester 161kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396455,"projectNumber":"J996","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-04-27T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2022-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Beecher - Moraco 138kV Line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":80.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396456,"projectNumber":"J1486","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-03-17T04:00:00+00:00","inService":"2021-12-31T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Waupaca County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Harrison North 138kV Substation","summerNetMW":2.5,"winterNetMW":2.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396457,"projectNumber":"J998","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Dallas County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Adel - Waukee 69kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396458,"projectNumber":"J1498","queueDate":"2020-06-09T04:00:00+00:00","withdrawnDate":"2023-01-31T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Chanarambie 115 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396459,"projectNumber":"J1497","queueDate":"2020-06-11T04:00:00+00:00","withdrawnDate":"2023-06-29T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Jefferson","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Concord 138 kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":110.0,"dp2ErisMw":125.0,"dp2NrisMw":110.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396460,"projectNumber":"J1501","queueDate":"2020-06-17T04:00:00+00:00","withdrawnDate":"2021-04-20T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Auburn North 138kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396461,"projectNumber":"J1499","queueDate":"2020-06-08T04:00:00+00:00","withdrawnDate":"2023-02-10T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"El Dorado East - Sterlington 115 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396462,"projectNumber":"J1516","queueDate":"2020-06-15T04:00:00+00:00","withdrawnDate":"2025-06-18T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Fitz  120kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396463,"projectNumber":"J1517","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-10-02T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hillsdale North 230 kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396464,"projectNumber":"J1524","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-01-06T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pipestone","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo Ridge to Pipestone 115kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396465,"projectNumber":"J1528","queueDate":"2022-03-17T04:00:00+00:00","inService":"2024-06-06T04:00:00+00:00","negInService":"2027-06-06T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dunn","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"EAU CLAIRE (ENDPOINT A) TO AS KING (ENDPOINT B) 345 KV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396466,"projectNumber":"J1532","queueDate":"2021-04-16T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Page","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Clarinda-Coburg 69 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396467,"projectNumber":"J1500","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"George","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"SE Greene Co 230kV substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396468,"projectNumber":"J1512","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Lafayette","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Darlington 138KV","summerNetMW":98.9,"winterNetMW":98.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396469,"projectNumber":"J1502","queueDate":"2020-06-18T04:00:00+00:00","inService":"2023-03-31T04:00:00+00:00","negInService":"2026-01-01T05:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Juneau","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Briggs Road - North Madison 345.0kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":225.0,"dp2NrisMw":225.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396470,"projectNumber":"J1503","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntley","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":120.0,"dp2ErisMw":150.0,"dp2NrisMw":120.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396471,"projectNumber":"J1513","queueDate":"2022-02-22T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waupaca","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Clintonville","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396472,"projectNumber":"J1515","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-01-23T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Tittabawassee  to Murphy 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396473,"projectNumber":"J1522","queueDate":"2020-06-12T04:00:00+00:00","withdrawnDate":"2020-11-30T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Grassmere 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396474,"projectNumber":"J1526","queueDate":"2020-06-14T04:00:00+00:00","withdrawnDate":"2024-09-12T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2026-05-13T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396475,"projectNumber":"J1504","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntley","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":120.0,"dp2ErisMw":150.0,"dp2NrisMw":120.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396476,"projectNumber":"J1505","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-22T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Talisheek - Bogalusa 230 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396477,"projectNumber":"J1493","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2021-01-05T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Hubbard","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hubbard 115kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396478,"projectNumber":"J1494","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2023-01-31T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Chisago 115kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396479,"projectNumber":"J1536","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2020-11-24T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Summerton (1) 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396480,"projectNumber":"J1539","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"West Baton Rouge","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"J683 POI 138 kV","summerNetMW":146.0,"winterNetMW":146.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396481,"projectNumber":"J1496","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Byron 161kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396482,"projectNumber":"J1506","queueDate":"2020-06-09T04:00:00+00:00","withdrawnDate":"2020-12-22T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Barkers Corner - Bogalusa 230 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396483,"projectNumber":"J1540","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2020-12-02T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bison-Alexandria 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396484,"projectNumber":"J1546","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2020-11-24T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Milan - Monroe 345 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396485,"projectNumber":"J1507","queueDate":"2020-06-09T04:00:00+00:00","withdrawnDate":"2020-12-22T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Barkers Corner - Bogalusa 230 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396486,"projectNumber":"J1508","queueDate":"2020-06-19T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marathon","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"B-54 Wien to McMillan 115KV","summerNetMW":98.9,"winterNetMW":98.9,"dp1ErisMw":98.9,"dp1NrisMw":98.9,"dp2ErisMw":98.9,"dp2NrisMw":98.9,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396487,"projectNumber":"J1518","queueDate":"2024-08-29T04:00:00+00:00","inService":"2025-06-20T04:00:00+00:00","negInService":"2027-11-19T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hillsdale North","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":185.0,"dp1NrisMw":185.0,"dp2ErisMw":185.0,"dp2NrisMw":185.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396488,"projectNumber":"J1523","queueDate":"2020-06-10T04:00:00+00:00","withdrawnDate":"2023-02-10T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Leflore","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood - Pickens 115 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396489,"projectNumber":"J1509","queueDate":"2020-06-10T04:00:00+00:00","withdrawnDate":"2024-01-17T05:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2023-06-20T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Leflore","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Greenwood - Pickens 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396490,"projectNumber":"J1510","queueDate":"2020-06-16T04:00:00+00:00","withdrawnDate":"2023-11-17T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Wood","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Arpin 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396491,"projectNumber":"J1525","queueDate":"2020-06-12T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2026-04-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"GRASSMERE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396492,"projectNumber":"J1533","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Adams","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Creston-Adams County 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396493,"projectNumber":"J1537","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2022-12-01T05:00:00+00:00","inService":"2024-07-04T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Thetford #1  - Dort 138kV T-Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396494,"projectNumber":"J1538","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-09-16T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Livingston","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Hammond - Coly 230 kV","summerNetMW":268.0,"winterNetMW":268.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396495,"projectNumber":"J1552","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2022-01-06T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Blackstone to Marshall 138kV (J1310 POI)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396496,"projectNumber":"J1553","queueDate":"2021-12-03T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-08-02T04:00:00+00:00","transmissionOwner":"METC","county":"Clinton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"BINGHAM","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396497,"projectNumber":"J1511","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-01-06T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Scandia to Lawrence Creek 69kV","summerNetMW":26.0,"winterNetMW":26.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396498,"projectNumber":"J1514","queueDate":"2021-12-08T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","negInService":"2023-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Driver 203kV  Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396499,"projectNumber":"J1527","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2024-09-12T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kenowa 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396500,"projectNumber":"J1531","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Sherburne","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sheroc Substation 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396501,"projectNumber":"J1519","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2026-09-01T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2025-12-01T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Bollinger","state":"MO","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"St. Francois to Lutesville 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396502,"projectNumber":"J1520","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Other_","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":108.0,"dp2ErisMw":135.0,"dp2NrisMw":108.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396503,"projectNumber":"J1557","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"GREENWOOD - RAPSON (BANNER) 345.0kV","summerNetMW":293.0,"winterNetMW":293.0,"dp1ErisMw":293.0,"dp1NrisMw":293.0,"dp2ErisMw":293.0,"dp2NrisMw":293.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396504,"projectNumber":"J1564","queueDate":"2020-06-08T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2025-12-22T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Talisheek - Bogalusa 230 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396505,"projectNumber":"J1566","queueDate":"2022-02-11T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Martin","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Rutland","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396506,"projectNumber":"J1570","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Rock","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Magnolia 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396507,"projectNumber":"J1544","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Morton","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Mandan BN-Northwest Mandan 115kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396508,"projectNumber":"J1545","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2020-12-21T05:00:00+00:00","inService":"2024-01-15T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crossett North to North Bastrop 115 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396509,"projectNumber":"J1542","queueDate":"2020-06-14T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. James","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Thibodaux - Vacherie 230kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":150.0,"dp1NrisMw":30.0,"dp2ErisMw":135.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396510,"projectNumber":"J1543","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2020-09-18T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Grand Traverse","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Ludington to Keystone 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396511,"projectNumber":"J1521","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2021-11-16T05:00:00+00:00","inService":"2022-10-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Day","state":"SD","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Stone to Ellendale (BS3ELR) 345kV (J933)","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396512,"projectNumber":"J1529","queueDate":"2021-04-16T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Carroll","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Tap Carroll (635320) - Auburn (635328) 69 kV line at about midpoint","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396513,"projectNumber":"J1571","queueDate":"2021-12-03T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-04-15T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"MOROCCO","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":175.0,"dp2NrisMw":175.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396514,"projectNumber":"J1575","queueDate":"2020-06-25T04:00:00+00:00","inService":"2025-12-01T05:00:00+00:00","negInService":"2028-08-03T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Marshall","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"115 kV transmission line from Warsaw to Donaldson owned by Otter Tail Power Company","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":70.0,"dp2ErisMw":70.0,"dp2NrisMw":70.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396515,"projectNumber":"J1580","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2020-11-30T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Cobb - Archer Junction  138kV #2","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396516,"projectNumber":"J1583","queueDate":"2020-06-14T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Donaldsonville - Evergreen 230kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":175.0,"dp2NrisMw":175.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396517,"projectNumber":"J1584","queueDate":"2020-06-21T04:00:00+00:00","withdrawnDate":"2020-09-18T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Toomey  138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396518,"projectNumber":"J1586","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta to Tompkins 345kV line","summerNetMW":499.0,"winterNetMW":499.0,"dp1ErisMw":499.0,"dp1NrisMw":499.0,"dp2ErisMw":499.0,"dp2NrisMw":499.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396519,"projectNumber":"J1547","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-10-01T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Killdeer to Blackhawk 345kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396520,"projectNumber":"J1551","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2020-12-21T05:00:00+00:00","inService":"2024-01-15T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crossett North to North Bastrop 115 kV","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396521,"projectNumber":"J1555","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-24T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Hillsdale","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Moore Road Substation 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396522,"projectNumber":"J1556","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2021-02-23T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Northern Fibre 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396523,"projectNumber":"J1530","queueDate":"2021-04-16T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-03-01T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mills","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396524,"projectNumber":"J1534","queueDate":"2025-04-14T04:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Byron","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396525,"projectNumber":"J1560","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Iberia","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Patoutville Substation (138kV bus)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396526,"projectNumber":"J1565","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2024-01-16T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Lawrence","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Bedford - Columbus 345kV line (Line #34517)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396527,"projectNumber":"J1548","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Amo-Edwardsport IGCC 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396528,"projectNumber":"J1558","queueDate":"2020-06-18T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pope","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"MORELAND","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396529,"projectNumber":"J1559","queueDate":"2020-06-18T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Conway","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Morrilton East Substation (161kV bus)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":140.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396530,"projectNumber":"J1562","queueDate":"2020-06-12T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2025-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396531,"projectNumber":"J1569","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2021-01-05T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pierce","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert)","summerNetMW":44.0,"winterNetMW":44.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396532,"projectNumber":"J1573","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Plover","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":130.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396533,"projectNumber":"J1563","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Whitesville - Wabash River 230kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396534,"projectNumber":"J1572","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Faribault","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntley to Blue Earth 161kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396535,"projectNumber":"J1574","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-08-03T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"West Carroll","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Darnell 115kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396536,"projectNumber":"J1577","queueDate":"2020-06-25T04:00:00+00:00","inService":"2025-10-15T04:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2025-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"HARDIN WEST SS - SHERIDAN 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396537,"projectNumber":"J1578","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2025-08-20T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Bartholomew","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Columbus -Greenwood Clark Twp 230kV line (Circuit ID 23019)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396538,"projectNumber":"J1579","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Edwards","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Albion-Crossville 138kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396539,"projectNumber":"J1535","queueDate":"2020-06-10T04:00:00+00:00","withdrawnDate":"2021-03-15T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Edwardsport - Peabody Tap 138 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396540,"projectNumber":"J1541","queueDate":"2020-06-21T04:00:00+00:00","withdrawnDate":"2020-09-18T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Donaldsonville 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396541,"projectNumber":"J1581","queueDate":"2024-04-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Nobles","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"NOBLES COUNTY","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396542,"projectNumber":"J1582","queueDate":"2022-02-28T05:00:00+00:00","withdrawnDate":"2023-01-31T05:00:00+00:00","inService":"2024-06-06T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"St. Croix","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Pine Lake to Three Lakes 115 kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396543,"projectNumber":"J1587","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-09-08T04:00:00+00:00","transmissionOwner":"ITC","county":"Muskegon","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Du Pont to Cobb 138 KV (J1375 POI)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396544,"projectNumber":"J2213","queueDate":"2022-03-25T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HIPLE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396545,"projectNumber":"J2221","queueDate":"2021-08-20T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-09-16T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Speed","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396546,"projectNumber":"J2105","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Killdeer 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396547,"projectNumber":"J1549","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Rock Creek-DeWitt 161kV line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396548,"projectNumber":"J1550","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-07-04T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"BARTON LAKE - BATAVIA 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396549,"projectNumber":"J1585","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2023-11-28T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Moniteau","state":"MO","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Apache Tap - Barnett 161kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396550,"projectNumber":"J2216","queueDate":"2022-04-08T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sandcut-Rockville 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":20.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396551,"projectNumber":"J2217","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2023-11-10T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Brinkley East - Aubrey 230 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396552,"projectNumber":"J2220","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Donaldsonville - Evergreen 230 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396553,"projectNumber":"J2222","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2023-11-07T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Penton Road to Nelson 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396554,"projectNumber":"J2108","queueDate":"2021-08-09T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Johnson","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"IC ENRON - SUB JIC 161 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396555,"projectNumber":"J1554","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-24T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"American Bumper Junction to David Junction 138Kv","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396556,"projectNumber":"J1561","queueDate":"2021-10-20T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Richard 138kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396557,"projectNumber":"J2223","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2023-11-07T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cash - Newport AB 161 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396558,"projectNumber":"J2224","queueDate":"2021-08-25T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Derrick 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396559,"projectNumber":"J1567","queueDate":"2022-02-22T05:00:00+00:00","withdrawnDate":"2023-06-22T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Outagamie","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Werber W -  Hiway 22 345 kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396560,"projectNumber":"J1568","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2021-01-05T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Renville","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Franklin 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396561,"projectNumber":"J1576","queueDate":"2022-03-03T05:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2026-01-15T05:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","negInService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Angie to Adams Creek 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":70.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396562,"projectNumber":"J1588","queueDate":"2024-04-30T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"BISON","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396563,"projectNumber":"J2226","queueDate":"2022-06-14T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GOODLAND - MORRISON DITCH 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396564,"projectNumber":"J2113","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Daviess","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reid - Daviess Co 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396565,"projectNumber":"J2228","queueDate":"2021-12-21T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Red Gum","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396566,"projectNumber":"J2229","queueDate":"2021-08-06T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Wabash","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Miami Wabash - Mier 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396567,"projectNumber":"J2214","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Fisher 230 kV","summerNetMW":62.0,"winterNetMW":62.0,"dp1ErisMw":62.0,"dp1NrisMw":62.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396568,"projectNumber":"J2215","queueDate":"2022-03-25T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2027-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Lake","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SCHAHFER GEN STA - ST. JOHN 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396569,"projectNumber":"J2099","queueDate":"2022-06-22T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","negInService":"2028-02-15T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rocky Run to Werner West 345 kV","summerNetMW":399.04,"winterNetMW":399.04,"dp1ErisMw":399.03,"dp1NrisMw":399.03,"dp2ErisMw":399.03,"dp2NrisMw":195.79,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396570,"projectNumber":"J2100","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2029-07-12T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"ARGENTA - PALISADES 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396571,"projectNumber":"J2219","queueDate":"2021-07-22T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2028-12-15T05:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Olmsted","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ROCHESTER - WABACO    161.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396572,"projectNumber":"J2104","queueDate":"2025-09-17T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2028-04-28T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":230.0,"dp1NrisMw":230.0,"dp2ErisMw":230.0,"dp2NrisMw":230.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396573,"projectNumber":"J2230","queueDate":"2022-03-24T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Gibson Sta - Merom (HED) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396574,"projectNumber":"J2232","queueDate":"2021-08-06T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tipton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tipton West 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396575,"projectNumber":"J2121","queueDate":"2021-08-06T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"McCredie - Overton 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396576,"projectNumber":"J2122","queueDate":"2021-08-04T04:00:00+00:00","withdrawnDate":"2026-06-22T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Nuthatch Switching Substation","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":33.0,"dp1NrisMw":33.0,"dp2ErisMw":33.0,"dp2NrisMw":33.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396577,"projectNumber":"J2218","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Manitowoc","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"SHOTO","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396578,"projectNumber":"J2101","queueDate":"2021-08-06T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Morton","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mandan 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396579,"projectNumber":"J2102","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Buffalo","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Alma","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396580,"projectNumber":"J2106","queueDate":"2021-08-03T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"Story County 161 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396581,"projectNumber":"J2107","queueDate":"2022-06-22T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","negInService":"2028-02-15T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rocky Run to Werner West 345 kV line","summerNetMW":399.04,"winterNetMW":399.04,"dp1ErisMw":399.03,"dp1NrisMw":399.03,"dp2ErisMw":399.03,"dp2NrisMw":195.79,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396582,"projectNumber":"J2225","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REID EHV 345 KV SUBSTATION","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396583,"projectNumber":"J2109","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. James","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Vacherie 230 kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396584,"projectNumber":"J2227","queueDate":"2025-07-14T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Trempealeau","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Independence - Bridge Creek 69.0kV","summerNetMW":89.0,"winterNetMW":89.0,"dp1ErisMw":89.0,"dp1NrisMw":89.0,"dp2ErisMw":80.1,"dp2NrisMw":80.1,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396585,"projectNumber":"J2117","queueDate":"2022-04-05T04:00:00+00:00","withdrawnDate":"2025-05-05T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Wood","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Saratoga - Badger West 138.0kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396586,"projectNumber":"J2231","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Sherrill 115kV","summerNetMW":97.5,"winterNetMW":97.5,"dp1ErisMw":97.49,"dp1NrisMw":97.49,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396587,"projectNumber":"J2112","queueDate":"2021-12-01T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Warren to Kountze 138 kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":115.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396588,"projectNumber":"J2115","queueDate":"2021-08-20T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-09-16T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Faraday 138kV","summerNetMW":98.3,"winterNetMW":98.3,"dp1ErisMw":98.3,"dp1NrisMw":98.3,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396589,"projectNumber":"J2116","queueDate":"2023-12-08T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","negInService":"2027-03-01T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Cook","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"COVIL","summerNetMW":18.0,"winterNetMW":18.0,"dp1ErisMw":0.0,"dp1NrisMw":18.0,"dp2ErisMw":18.0,"dp2NrisMw":18.0,"fuelType":"Diesel","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396590,"projectNumber":"J2233","queueDate":"2022-06-14T04:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7BUNSONVILLE - 7SIDNEY   345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396591,"projectNumber":"J2114","queueDate":"2021-12-01T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Tyler","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"DOUCETTE  to DEER 138 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396592,"projectNumber":"J2118","queueDate":"2021-09-29T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Monroe","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Whiting - Morocco 138kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396593,"projectNumber":"J2236","queueDate":"2021-08-06T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Howard","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greentown 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396594,"projectNumber":"J2123","queueDate":"2021-09-01T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Dubois","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Duff 138KV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396595,"projectNumber":"J2119","queueDate":"2022-01-18T05:00:00+00:00","withdrawnDate":"2025-03-03T05:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"ITC","county":"Hillsdale","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other_","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":30.0,"dp1NrisMw":12.6,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396596,"projectNumber":"J2234","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Henderson to AB Brown 138 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396597,"projectNumber":"J2127","queueDate":"2021-08-23T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2027-07-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Jefferson Davis","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Silver Creek 115kV","summerNetMW":172.5,"winterNetMW":172.5,"dp1ErisMw":172.5,"dp1NrisMw":172.5,"dp2ErisMw":172.5,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396598,"projectNumber":"J2131","queueDate":"2021-08-16T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CASEY    - 7NEWTON   345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396599,"projectNumber":"J2245","queueDate":"2021-08-30T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Tammany","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396600,"projectNumber":"J2135","queueDate":"2021-08-11T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Ville Platte - West Fork 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396601,"projectNumber":"J2237","queueDate":"2021-12-21T05:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","negInService":"2027-05-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Brinkley East - Aubrey 230 kV Line","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":185.0,"dp1NrisMw":185.0,"dp2ErisMw":185.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396602,"projectNumber":"J2124","queueDate":"2021-08-06T04:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rising","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396603,"projectNumber":"J2248","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"White Bluff EHV to Wrightsville 115kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396604,"projectNumber":"J2139","queueDate":"2021-09-02T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2029-01-26T05:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"BLACKFOOT - MADRID 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396605,"projectNumber":"J2242","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Polk","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"SHECO","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396606,"projectNumber":"J2246","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REID EHV 345 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396607,"projectNumber":"J2250","queueDate":"2021-11-01T04:00:00+00:00","inService":"2024-04-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Stutsman","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Ellendale 345","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396608,"projectNumber":"J2252","queueDate":"2022-07-13T04:00:00+00:00","withdrawnDate":"2026-03-16T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cash - Newport AB","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396609,"projectNumber":"J2143","queueDate":"2021-10-15T04:00:00+00:00","inService":"2025-02-15T05:00:00+00:00","negInService":"2027-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Lake Village Bagby 115 KV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396610,"projectNumber":"J2255","queueDate":"2021-08-06T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Ripley","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Batesville 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396611,"projectNumber":"J2120","queueDate":"2021-08-04T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fairfax","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396612,"projectNumber":"J2235","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT","county":"San Jacinto","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Shepherd Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396613,"projectNumber":"J2240","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Nevada","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Prescott 337507 to Emmett 337505","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396614,"projectNumber":"J2129","queueDate":"2021-08-26T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2028-04-15T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Barry","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Bradley 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396615,"projectNumber":"J2130","queueDate":"2022-03-25T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Clinton 230kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396616,"projectNumber":"J2247","queueDate":"2022-03-25T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marshall","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Woodhall","summerNetMW":178.0,"winterNetMW":178.0,"dp1ErisMw":178.0,"dp1NrisMw":178.0,"dp2ErisMw":178.0,"dp2NrisMw":178.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396617,"projectNumber":"J2138","queueDate":"2021-09-14T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rye Co - Cypress 138kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396618,"projectNumber":"J2251","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Grant","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greentown 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396619,"projectNumber":"J2253","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT","county":"Tyler","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Fork Creek Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396620,"projectNumber":"J2148","queueDate":"2021-10-18T04:00:00+00:00","withdrawnDate":"2025-11-12T05:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Outagamie","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Werner West 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396621,"projectNumber":"J2160","queueDate":"2021-09-01T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Bartholomew","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gallagher to Columbus 230KV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396622,"projectNumber":"J2162","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Leflore","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Itta Benna - Moorhead 115KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396623,"projectNumber":"J2149","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2026-01-13T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Saline","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"WHITE BLUFF EHV - HENSLEY 115.0kV","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":112.0,"dp1NrisMw":112.0,"dp2ErisMw":112.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396624,"projectNumber":"J2150","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Jefferson","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Madison 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396625,"projectNumber":"J2238","queueDate":"2025-07-16T04:00:00+00:00","inService":"2024-02-15T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Maries","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"The Franks (Bus #300041) - Bland (Bus #344154) 345 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396626,"projectNumber":"J2239","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Washington","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Belgrade - Pilot Knob 161 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396627,"projectNumber":"J2152","queueDate":"2023-11-30T05:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"INDEPENDENCE [LA] - HAMMOND 230.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":0.0,"dp2ErisMw":120.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396628,"projectNumber":"J2154","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Carlyss - Nelson 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396629,"projectNumber":"J2161","queueDate":"2021-08-31T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-08-31T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ipava 138KV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396630,"projectNumber":"J2164","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Pike","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Petersburg 345 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396631,"projectNumber":"J2166","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Taylor","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Clarinda - Braddyville 161 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396632,"projectNumber":"J2177","queueDate":"2021-08-09T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tipton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tipton West 230 kV","summerNetMW":67.0,"winterNetMW":67.0,"dp1ErisMw":67.0,"dp1NrisMw":67.0,"dp2ErisMw":67.0,"dp2NrisMw":67.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396633,"projectNumber":"J2249","queueDate":"2021-12-21T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-11-14T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Bayou Cove","summerNetMW":144.0,"winterNetMW":144.0,"dp1ErisMw":144.0,"dp1NrisMw":144.0,"dp2ErisMw":144.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396634,"projectNumber":"J2147","queueDate":"2021-11-24T05:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Daviess","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Daviess County - Utica 69kV","summerNetMW":56.0,"winterNetMW":56.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396635,"projectNumber":"J2178","queueDate":"2021-08-06T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396636,"projectNumber":"J2184","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Brinkley West Substation 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396637,"projectNumber":"J2151","queueDate":"2021-08-12T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Muddy to West Frankfort 138 kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":135.0,"dp2NrisMw":135.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396638,"projectNumber":"J2153","queueDate":"2021-08-11T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","negInService":"2027-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ashley","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Ashley Switchyard","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":145.0,"dp1NrisMw":0.0,"dp2ErisMw":134.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396639,"projectNumber":"J2128","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-08-31T04:00:00+00:00","negInService":"2026-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7ARLAND - 7FARADAY 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396640,"projectNumber":"J2241","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Benton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"Cayuga sub (Jordan Creek Wind J515 POI) 345 kV","summerNetMW":320.0,"winterNetMW":320.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396641,"projectNumber":"J2243","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Tyler","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Warren 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396642,"projectNumber":"J2244","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"MABELVALE EHV to WHITE BLUFF EHV 115kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396643,"projectNumber":"J2155","queueDate":"2022-03-28T04:00:00+00:00","inService":"2024-05-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"New Madrid","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396644,"projectNumber":"J2165","queueDate":"2021-11-03T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"JACINTO - SHECO BATISTE CREEK 230.0kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":145.0,"dp1NrisMw":0.0,"dp2ErisMw":145.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396645,"projectNumber":"J2169","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Deridder - Centennial 138-kV","summerNetMW":98.9,"winterNetMW":98.9,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396646,"projectNumber":"J2171","queueDate":"2022-03-25T04:00:00+00:00","inService":"2024-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Aster to Commodore","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":500.0,"dp2NrisMw":500.0,"fuelType":"Solar","facilityType":"Solar/Wind","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396647,"projectNumber":"J2163","queueDate":"2022-07-13T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"230 kV: Penton Road to Roy S Nelson 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396648,"projectNumber":"J2176","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Hartburg - Rhodes 500 kV","summerNetMW":680.0,"winterNetMW":680.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396649,"projectNumber":"J2179","queueDate":"2021-08-06T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Montgomery","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MONTGOMERY","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396650,"projectNumber":"J2180","queueDate":"2022-07-13T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-08-20T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Fisher","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396651,"projectNumber":"J2181","queueDate":"2022-07-13T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-07-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"161 kV line tap of DELL EAST to Blytheville","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396652,"projectNumber":"J2183","queueDate":"2021-09-01T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2022-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Pointe Coupee","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS-Only","poiName":"Fancy Point - Waterloo","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396653,"projectNumber":"J2189","queueDate":"2021-08-17T04:00:00+00:00","inService":"2019-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McDonough","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Hornsby Switching Station","summerNetMW":15.6,"winterNetMW":15.6,"dp1ErisMw":15.6,"dp1NrisMw":0.0,"dp2ErisMw":15.6,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396654,"projectNumber":"J2191","queueDate":"2021-10-28T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-12-15T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Mary","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Caneland 230kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396655,"projectNumber":"J2133","queueDate":"2021-08-26T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2029-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"White","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Garner 115 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396656,"projectNumber":"J2134","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2026-01-13T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"WHITE BLUFF EHV - WRIGHTSVILLE 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":195.0,"dp1NrisMw":195.0,"dp2ErisMw":195.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396657,"projectNumber":"J2192","queueDate":"2022-06-14T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7BUNSONVILLE - 7SIDNEY   345.0kV","summerNetMW":99.9,"winterNetMW":99.9,"dp1ErisMw":99.9,"dp1NrisMw":99.9,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396658,"projectNumber":"J2193","queueDate":"2021-11-30T05:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2027-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Sand Lake","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396659,"projectNumber":"J2195","queueDate":"2025-01-10T05:00:00+00:00","inService":"2024-10-07T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ramsey East 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396660,"projectNumber":"J2196","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2028-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AUSTIN 138 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396661,"projectNumber":"J2210","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Derrick 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396662,"projectNumber":"J1002","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-05T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2021-05-05T04:00:00+00:00","negInService":"2023-01-26T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Waushara County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Wautoma 138kV Switchyard","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396663,"projectNumber":"J2202","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Lacassine 69 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396664,"projectNumber":"J2203","queueDate":"2022-03-25T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Adams","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"East Quincy","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396665,"projectNumber":"J2205","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"J1145 New 345kV POI Substation (Ameren Overton-Montgomery 345kV Line)","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396666,"projectNumber":"J2212","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Jefferson","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Madison Michigan Ave","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396667,"projectNumber":"J2136","queueDate":"2022-03-23T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Iroquois","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gilman South","summerNetMW":190.9,"winterNetMW":190.9,"dp1ErisMw":190.9,"dp1NrisMw":190.9,"dp2ErisMw":190.9,"dp2NrisMw":190.9,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396668,"projectNumber":"J2140","queueDate":"2021-09-14T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Brinkley East to Clarendon 115 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396669,"projectNumber":"J1022","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2022-05-27T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Weedman Substation 138kV Bus","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396670,"projectNumber":"J1023","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Osceola - Wilson 161 kV Line Tap","summerNetMW":82.0,"winterNetMW":82.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396671,"projectNumber":"J2141","queueDate":"2021-09-14T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Brinkley East to Clarendon 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396672,"projectNumber":"J2142","queueDate":"2021-11-03T04:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Adair","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Maywood - Zachary 345 kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396673,"projectNumber":"J2185","queueDate":"2022-06-22T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","negInService":"2028-02-15T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rocky Run to Werner West 345 kV line","summerNetMW":399.04,"winterNetMW":399.04,"dp1ErisMw":399.03,"dp1NrisMw":399.03,"dp2ErisMw":399.03,"dp2NrisMw":195.79,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396674,"projectNumber":"J2190","queueDate":"2021-08-24T04:00:00+00:00","inService":"2024-08-15T04:00:00+00:00","negInService":"2027-10-22T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"DELL EHV - SAN SOUCI 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":500.0,"dp2NrisMw":425.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396675,"projectNumber":"J2197","queueDate":"2025-01-10T05:00:00+00:00","inService":"2024-10-07T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Xenia","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396676,"projectNumber":"J2198","queueDate":"2022-03-25T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Jefferson","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Joachim 138kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396677,"projectNumber":"J2145","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-10-15T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Ohio","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wilson EHV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396678,"projectNumber":"J2254","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Pike","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Petersburg 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396679,"projectNumber":"J2199","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Anoka","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"COON CREEK","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396680,"projectNumber":"J2201","queueDate":"2021-12-07T05:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-11-29T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Harrison","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kenzig Road - HE Ramsey 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":125.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396681,"projectNumber":"J2211","queueDate":"2024-09-27T04:00:00+00:00","withdrawnDate":"2025-11-13T05:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Brown","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Tower Dr","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396682,"projectNumber":"J1000","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-04-02T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2023-03-27T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Grant County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Nelson Dewey - Lancaster 138kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396683,"projectNumber":"J2146","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Hopkins","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hopkins County 161kV Substation","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":45.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396684,"projectNumber":"J2156","queueDate":"2022-06-28T04:00:00+00:00","inService":"2024-05-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Johnson","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Massac - Jordan 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396685,"projectNumber":"J1003","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-05T04:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2021-05-05T04:00:00+00:00","negInService":"2023-06-06T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dodge County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Beaver Dam 69 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396686,"projectNumber":"J1020","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-24T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Jasper County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Missionary 230kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396687,"projectNumber":"J2157","queueDate":"2021-08-25T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morton","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tri-County 230 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396688,"projectNumber":"J2158","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hutsonville - Neoga 138KV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396689,"projectNumber":"J1004","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Mecosta County,Montcalm County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kenowa - Nelson Road 345kV Line Tap","summerNetMW":800.0,"winterNetMW":800.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396690,"projectNumber":"J1029","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-03-13T04:00:00+00:00","inService":"2020-09-28T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Feliciana Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Fancy Point 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396691,"projectNumber":"J1001","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lincoln County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo Ridge 115kV Substation","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396692,"projectNumber":"J1021","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-02T05:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Piatt County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Goose Creek 345kV Switchyard","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396693,"projectNumber":"J1006","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Brookings County","state":"SD","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Brookings - Yankee 115kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396694,"projectNumber":"J1025","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-04-04T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2022-04-04T04:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Knox County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Zachary - Maywood 345 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":290.0,"dp2NrisMw":290.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396695,"projectNumber":"J1026","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-04-01T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2022-04-01T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Audrain County,Ralls County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek 345 kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":350.0,"dp2ErisMw":380.0,"dp2NrisMw":265.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396696,"projectNumber":"J1027","queueDate":"2018-03-12T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2021-03-08T05:00:00+00:00","negInService":"2022-11-15T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Pike County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ratts 161 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396697,"projectNumber":"J2159","queueDate":"2021-08-24T04:00:00+00:00","inService":"2024-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hutsonville - Neoga 138KV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":40.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396698,"projectNumber":"J2167","queueDate":"2021-11-03T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Chalkley - Solac 230kV","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396699,"projectNumber":"J2168","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"China Substation","summerNetMW":693.0,"winterNetMW":693.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396700,"projectNumber":"J2170","queueDate":"2022-04-05T04:00:00+00:00","inService":"2024-01-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Snyder 345 kV (J1180/J1475 POI)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396701,"projectNumber":"J2172","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McDonough","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Macomb Northeast","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396702,"projectNumber":"J2173","queueDate":"2021-08-23T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2027-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"BOLTON","summerNetMW":396.0,"winterNetMW":396.0,"dp1ErisMw":396.0,"dp1NrisMw":396.0,"dp2ErisMw":396.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396703,"projectNumber":"J2174","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2025-01-10T05:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"ROBINSONVILLE - TUNICA 230/115 SUB 230.0kV","summerNetMW":390.0,"winterNetMW":390.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396704,"projectNumber":"J2175","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Indianola to Gerald Andrus 230 kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396705,"projectNumber":"J2186","queueDate":"2022-06-22T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ipava-Maple Ridge 345kV (4573)","summerNetMW":820.6,"winterNetMW":820.6,"dp1ErisMw":820.6,"dp1NrisMw":820.6,"dp2ErisMw":820.6,"dp2NrisMw":820.6,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396706,"projectNumber":"J2187","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2026-04-07T04:00:00+00:00","inService":"2024-10-20T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Stillwell 138kV","summerNetMW":124.0,"winterNetMW":124.0,"dp1ErisMw":124.0,"dp1NrisMw":124.0,"dp2ErisMw":124.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396707,"projectNumber":"J1028","queueDate":"2018-03-12T04:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","giaToExec":"2021-03-08T05:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Pike County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ratts - Victory 161 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396708,"projectNumber":"J1112","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-10T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Kosciusko County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Leesburg 138kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396709,"projectNumber":"J2188","queueDate":"2021-12-01T05:00:00+00:00","withdrawnDate":"2024-10-18T04:00:00+00:00","inService":"2025-07-23T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Columbia - South Fond du Lac 345.0kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396710,"projectNumber":"J2208","queueDate":"2021-08-27T04:00:00+00:00","withdrawnDate":"2026-02-12T05:00:00+00:00","inService":"2024-10-04T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"De Soto","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Mansfield (Bus #500530) to Red River Tap (Bus #500762) 138 kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396711,"projectNumber":"J2209","queueDate":"2021-12-23T05:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-09-16T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Scott","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Oran 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396712,"projectNumber":"J1005","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-06-30T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland County,Saginaw County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Murphy 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396713,"projectNumber":"J1130","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2023-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Warren County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Baxter Wilson SES 115/500 kV Sw YD","summerNetMW":966.0,"winterNetMW":1110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396714,"projectNumber":"J1135","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Des Moines County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntwoods 69 kV substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396715,"projectNumber":"J1024","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2022-09-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Nodaway County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Maryville - Clarinda 161 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396716,"projectNumber":"J1008","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Blue Earth IPL - Blue Earth 69kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396717,"projectNumber":"J1115","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2024-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macon County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Latham - Oreana 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396718,"projectNumber":"J1136","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-06-05T04:00:00+00:00","inService":"2021-08-11T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Hinds County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tinnin Road 230kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396719,"projectNumber":"J1009","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-05-19T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Kenosha County,Racine County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Pleasant Prairie - Racine 345kV Line Tap","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396720,"projectNumber":"J1110","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-06-18T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"SMMPA","county":"Mower County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"North Austin 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396721,"projectNumber":"J1131","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-16T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2021-06-16T04:00:00+00:00","negInService":"2024-06-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Scott County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sub 56 Davenport 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396722,"projectNumber":"J1133","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-01T04:00:00+00:00","inService":"2021-08-11T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Richland Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Dunn - Oakridge 115kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396723,"projectNumber":"J1116","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-03T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Hancock County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greensboro - Greenfield 138 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396724,"projectNumber":"J1117","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-05-30T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ingham County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Green 138kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396725,"projectNumber":"J1151","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ascension Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Brittany 230kV Substation","summerNetMW":219.0,"winterNetMW":252.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396726,"projectNumber":"J1152","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2022-07-19T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hancock County,Shelby County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gwynneville 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396727,"projectNumber":"J1139","queueDate":"2018-03-12T04:00:00+00:00","inService":"2020-10-31T04:00:00+00:00","giaToExec":"2021-03-17T04:00:00+00:00","negInService":"2023-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sidney Substation 138 kV Bus","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":135.0,"dp2NrisMw":135.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396728,"projectNumber":"J1118","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-03T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Piatt County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Mahomet - Weedman 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396729,"projectNumber":"J1007","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-08-12T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2020-03-30T04:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Crittenden County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Marion - Marked Tree 161kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396730,"projectNumber":"J1111","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-10T05:00:00+00:00","inService":"2021-01-02T05:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Jackson County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Campbell Hill - Jackson 161 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396731,"projectNumber":"J1113","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Sunflower County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Delta - Ruleville 115kV Line Tap","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396732,"projectNumber":"J1134","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-06-05T04:00:00+00:00","inService":"2021-08-11T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"White County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Griffithville - Searcy Price 115 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396733,"projectNumber":"J1137","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Swifton - Hoxie South 161 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396734,"projectNumber":"J1119","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-06-10T04:00:00+00:00","inService":"2021-01-01T05:00:00+00:00","transmissionOwner":"METC","county":"Jackson County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Tompkins 345 kV Substation","summerNetMW":600.0,"winterNetMW":600.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396735,"projectNumber":"J1150","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-08-10T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Deedsville 345 kV Substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396736,"projectNumber":"J1153","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Sheboygan County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Holland 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396737,"projectNumber":"J1155","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-08-12T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","giaToExec":"2020-03-30T04:00:00+00:00","negInService":"2022-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Mississippi County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Driver 230 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396738,"projectNumber":"J1183","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-04-02T04:00:00+00:00","inService":"2019-01-31T05:00:00+00:00","giaToExec":"2021-04-02T04:00:00+00:00","negInService":"2019-10-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Delta County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"ERIS","poiName":"Heritage Garden substation","summerNetMW":1.35,"winterNetMW":1.35,"dp1ErisMw":1.35,"dp1NrisMw":0.0,"dp2ErisMw":1.35,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396739,"projectNumber":"J1180","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2020-08-14T04:00:00+00:00","giaToExec":"2021-03-17T04:00:00+00:00","negInService":"2023-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark County","state":"IL","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Casey West - Sullivan 345 kV Line","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396740,"projectNumber":"J1158","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-12-07T05:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","giaToExec":"2020-07-01T04:00:00+00:00","negInService":"2022-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"St. James Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Vacherie 230 kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":70.0,"dp2ErisMw":70.0,"dp2NrisMw":70.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396741,"projectNumber":"J1132","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Union County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Creston East 69 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396742,"projectNumber":"J1114","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Plymouth County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"J506 Substation on Raun - Highland 345 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396743,"projectNumber":"J1159","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Walker County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Mount Zion 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396744,"projectNumber":"J1167","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-01-14T05:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"AECC Forrest City West 161 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396745,"projectNumber":"J1138","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-12-07T05:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Baraga County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"M38 138 kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396746,"projectNumber":"J1154","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2023-05-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Jefferson County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Jefferson 138 kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396747,"projectNumber":"J1160","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-01-31T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Adams County,Wood County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Sand Lake - Port Edwards 138 kV Line Tap","summerNetMW":100.23,"winterNetMW":100.23,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396748,"projectNumber":"J1181","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2021-06-15T04:00:00+00:00","negInService":"2022-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Chickasaw County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hazleton - Mitchell county 345 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396749,"projectNumber":"J1182","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-03-18T04:00:00+00:00","inService":"2021-11-15T05:00:00+00:00","giaToExec":"2022-03-19T04:00:00+00:00","negInService":"2024-11-15T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Adair County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Zachary Substation 345 kV Bus","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396750,"projectNumber":"J1157","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Hinds County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tinnin Road 230 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396751,"projectNumber":"J1164","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-04-06T04:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2022-04-07T04:00:00+00:00","negInService":"2024-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Rock County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Magnolia 161 kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396752,"projectNumber":"J1188","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-05-18T04:00:00+00:00","inService":"2021-08-31T04:00:00+00:00","giaToExec":"2021-05-18T04:00:00+00:00","negInService":"2022-06-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2018-APR","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Sheepskin 69 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396753,"projectNumber":"J1185","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-04-24T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Putnam County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Adair - Appanoose 161 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396754,"projectNumber":"J1166","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Bayou Cove - Richard 138 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396755,"projectNumber":"J1186","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"San Jacinto County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Pelican Road - Shepard 138 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396756,"projectNumber":"J1168","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Pintail 138 kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396757,"projectNumber":"J1169","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2022-02-07T05:00:00+00:00","inService":"2021-08-31T04:00:00+00:00","giaToExec":"2022-02-07T05:00:00+00:00","negInService":"2024-07-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"McCook County","state":"SD","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Grant 115 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396758,"projectNumber":"J1200","queueDate":"2019-04-25T04:00:00+00:00","inService":"2021-06-15T04:00:00+00:00","giaToExec":"2022-04-22T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Putnam 138kV Substation","summerNetMW":24.2,"winterNetMW":24.2,"dp1ErisMw":24.2,"dp1NrisMw":24.2,"dp2ErisMw":24.2,"dp2NrisMw":24.2,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396759,"projectNumber":"J1189","queueDate":"2018-03-12T04:00:00+00:00","inService":"2019-01-01T05:00:00+00:00","giaToExec":"2020-05-11T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Brown County,Martin County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Crane Solar 69kV Substation","summerNetMW":5.0,"winterNetMW":5.0,"dp1ErisMw":4.95,"dp1NrisMw":4.95,"dp2ErisMw":4.95,"dp2NrisMw":4.95,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396760,"projectNumber":"J1210","queueDate":"2019-04-27T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-03-31T04:00:00+00:00","transmissionOwner":"METC","county":"Iosco County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Whittemore - Twining 138kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396761,"projectNumber":"J1211","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-02-11T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"CONSUMERS ENERGY COMPANY EDC","county":"Isabella County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Vernon - METC Tap 138kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396762,"projectNumber":"J1220","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Rapides - Rodemacher 230 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396763,"projectNumber":"J1161","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-01-07T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Scott County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Miner - Kelso 161 kV Line Tap","summerNetMW":100.23,"winterNetMW":100.23,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396764,"projectNumber":"J1162","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson County","state":"TX","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Jacinto - China 230 kV Line Tap","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396765,"projectNumber":"J1156","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden County","state":"AR","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Kuhn Rd. - Parkin 161 kV line tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396766,"projectNumber":"J1163","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Quitman County,Tunica County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crenshaw - Tunica 115kv Line Tap","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396767,"projectNumber":"J1184","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-10-09T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","giaToExec":"2019-03-06T05:00:00+00:00","negInService":"2021-04-09T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Washington Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lagen Holton-Franklinton 115kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396768,"projectNumber":"J1165","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-28T04:00:00+00:00","inService":"2020-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"LC Bulk - Henning 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396769,"projectNumber":"J1187","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2021-03-09T05:00:00+00:00","inService":"2022-05-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Mercer County","state":"ND","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Stanton 230 kV Substation","summerNetMW":151.8,"winterNetMW":151.8,"dp1ErisMw":151.8,"dp1NrisMw":151.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396770,"projectNumber":"J1213","queueDate":"2019-04-27T04:00:00+00:00","inService":"2022-12-31T05:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2024-11-02T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Iron County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Taum Sauk 138kV Switchyard, Bus 1 & 2","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Hydro","facilityType":"Hydroelectric","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396771,"projectNumber":"J1230","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Wadena County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Wing River- Riverton 230kV line","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396772,"projectNumber":"J1202","queueDate":"2019-04-25T04:00:00+00:00","inService":"2021-06-15T04:00:00+00:00","giaToExec":"2022-05-26T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Baldwin Plant 345kV Switchyard - Baldwin Unit 2","summerNetMW":68.4,"winterNetMW":68.4,"dp1ErisMw":68.4,"dp1NrisMw":68.4,"dp2ErisMw":68.4,"dp2NrisMw":68.4,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396773,"projectNumber":"J1221","queueDate":"2019-04-27T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","negInService":"2028-10-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Wadena County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Wing River- Riverton 230kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":120.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396774,"projectNumber":"J1231","queueDate":"2019-04-28T04:00:00+00:00","withdrawnDate":"2024-12-13T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BRPS","county":"Lyon County","state":"KY","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Barkley - Caldwell 161kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396775,"projectNumber":"J1222","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Ralls County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396776,"projectNumber":"J1204","queueDate":"2019-04-26T04:00:00+00:00","withdrawnDate":"2024-05-03T04:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Casey West 345kV Substation","summerNetMW":199.3,"winterNetMW":199.3,"dp1ErisMw":199.3,"dp1NrisMw":199.3,"dp2ErisMw":199.3,"dp2NrisMw":199.3,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396777,"projectNumber":"J1217","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-03-18T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Ville Platte - West Fork 230 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396778,"projectNumber":"J1224","queueDate":"2019-04-27T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","negInService":"2025-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Majestic - Milan 345 kV Line Tap","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":153.0,"dp2NrisMw":153.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396779,"projectNumber":"J1218","queueDate":"2019-04-27T04:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2026-06-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Muscatine County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sub 92 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":160.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396780,"projectNumber":"J1235","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","negInService":"2023-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Edwardsport - Washington Mun, Linton 138kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396781,"projectNumber":"J1201","queueDate":"2019-04-25T04:00:00+00:00","inService":"2021-06-15T04:00:00+00:00","giaToExec":"2022-04-22T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"North Coffeen 138kV Substation","summerNetMW":44.2,"winterNetMW":44.2,"dp1ErisMw":44.2,"dp1NrisMw":44.2,"dp2ErisMw":44.2,"dp2NrisMw":44.2,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396782,"projectNumber":"J1215","queueDate":"2019-04-27T04:00:00+00:00","doneDate":"2022-01-25T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-01-25T05:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Arkansas County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Stuttgart Ricuskey - Woodward 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":155.0,"dp1NrisMw":155.0,"dp2ErisMw":155.0,"dp2NrisMw":155.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396783,"projectNumber":"J1232","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Chesterville - Mattoon West 138kV Line","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396784,"projectNumber":"J1223","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-03-18T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC EMMP","county":"Pike County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Colonial Pipeline  - Kentwood 115 kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396785,"projectNumber":"J1212","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Chanarambie-Ellsborough 115kV Line","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396786,"projectNumber":"J1214","queueDate":"2019-04-27T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dane County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Rockdale 345 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":240.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396787,"projectNumber":"J1225","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ashley-Turkey Hill Line 1482, between the Okawville and North Nashville substations","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396788,"projectNumber":"J1206","queueDate":"2019-04-26T04:00:00+00:00","withdrawnDate":"2021-02-10T05:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Newton 138kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396789,"projectNumber":"J1233","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-02-06T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Pike County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cato 138 kV Substation","summerNetMW":32.5,"winterNetMW":32.5,"dp1ErisMw":32.5,"dp1NrisMw":32.5,"dp2ErisMw":32.5,"dp2NrisMw":32.5,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396790,"projectNumber":"J1234","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","negInService":"2023-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Edwardsport - Washington Mun, Linton 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396791,"projectNumber":"J1219","queueDate":"2019-04-27T04:00:00+00:00","doneDate":"2021-11-30T05:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-09-24T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Tangipahoa Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Chicken Farm - Amite 115 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396792,"projectNumber":"J1226","queueDate":"2019-04-27T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Morocco 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396793,"projectNumber":"J1203","queueDate":"2019-04-25T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-05-15T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Thetford 345kV Substation","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396794,"projectNumber":"J1216","queueDate":"2019-04-27T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ashley 138 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":185.0,"dp1NrisMw":185.0,"dp2ErisMw":185.0,"dp2NrisMw":185.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396795,"projectNumber":"J1236","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Ville Platte - West Form 230 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396796,"projectNumber":"J1237","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-03T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Majestic - Milan 345kV Line","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396797,"projectNumber":"J1205","queueDate":"2019-04-26T04:00:00+00:00","doneDate":"2021-11-30T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2021-11-20T05:00:00+00:00","negInService":"2023-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Allen Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Centennial - West Bay 138kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396798,"projectNumber":"J1208","queueDate":"2019-04-27T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","negInService":"2023-11-04T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Muddy - Crab Orchard 138 kV line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":80.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396799,"projectNumber":"J1238","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Rapides - Rodemacher 230 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396800,"projectNumber":"J1269","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Warrick County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Elliott 69kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":47.6,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396801,"projectNumber":"J1228","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2019-11-05T05:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntley 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396802,"projectNumber":"J1266","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kinmundy - Salem 138kV Line","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396803,"projectNumber":"J1207","queueDate":"2019-04-26T04:00:00+00:00","withdrawnDate":"2022-12-02T05:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2022-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Branch County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Newton 138kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":49.5,"dp2ErisMw":49.5,"dp2NrisMw":49.5,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396804,"projectNumber":"J1239","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Ouachita Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Rilla 115 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":70.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396805,"projectNumber":"J1267","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-06T04:00:00+00:00","inService":"2022-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Fisher  - Cherry Valley 161kV Line","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396806,"projectNumber":"J1268","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-11-30T05:00:00+00:00","giaToExec":"2022-04-22T04:00:00+00:00","negInService":"2023-12-01T05:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Lincoln County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Pike - Troy 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":88.0,"dp2ErisMw":150.0,"dp2NrisMw":70.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396807,"projectNumber":"J1303","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Jackson County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Campbell Hill - Jackson 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":95.0,"dp1NrisMw":95.0,"dp2ErisMw":95.0,"dp2NrisMw":95.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396808,"projectNumber":"J1294","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-01-25T05:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","giaToExec":"2022-01-26T05:00:00+00:00","negInService":"2023-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC","county":"Sunflower County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Indianola - Cleveland 115kV Line","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396809,"projectNumber":"J1227","queueDate":"2019-04-27T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Spencer County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Dubois - FB Culley 138 kV Line Tap","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396810,"projectNumber":"J1209","queueDate":"2019-04-27T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","negInService":"2023-11-04T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Muddy - Crab Orchard 138kV Line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":80.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396811,"projectNumber":"J1229","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2026-06-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Muscatine County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sub 92 345 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396812,"projectNumber":"J1263","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-01-01T05:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2025-01-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Casey  - Kansas West 345kV Line","summerNetMW":408.6,"winterNetMW":408.6,"dp1ErisMw":408.6,"dp1NrisMw":408.6,"dp2ErisMw":408.6,"dp2NrisMw":408.6,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396813,"projectNumber":"J1264","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-05-11T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Schoolcraft County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Blaney Park - Engadine - Hiawatha - Alger - Munising 69kV Line","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396814,"projectNumber":"J1265","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-01-31T05:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"LaGrange County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Wolcottville - South Milford 69kV Line","summerNetMW":43.0,"winterNetMW":43.0,"dp1ErisMw":43.0,"dp1NrisMw":43.0,"dp2ErisMw":43.0,"dp2NrisMw":43.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396815,"projectNumber":"J1270","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","giaToExec":"2022-11-29T05:00:00+00:00","negInService":"2024-10-19T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Palo Alto County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Kossuth - O'Brien 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396816,"projectNumber":"J1272","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-09-02T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-03-30T04:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Vanderburgh County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Angel Mound 138kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":23.6,"dp2ErisMw":50.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396817,"projectNumber":"J1293","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Brinkley East - Moro 115 kV Line Tap","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396818,"projectNumber":"J1304","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2022-03-28T04:00:00+00:00","negInService":"2023-08-11T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Paddock - Townline Road 138kV Line","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":65.0,"dp1NrisMw":65.0,"dp2ErisMw":65.0,"dp2NrisMw":65.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396819,"projectNumber":"J1271","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Vanderburgh County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Oak Grove 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396820,"projectNumber":"J1295","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-02-28T05:00:00+00:00","giaToExec":"2021-09-01T04:00:00+00:00","negInService":"2023-12-31T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Gibson County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gibson - Francisco 345kV Line","summerNetMW":280.0,"winterNetMW":280.0,"dp1ErisMw":280.0,"dp1NrisMw":280.0,"dp2ErisMw":280.0,"dp2NrisMw":280.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396821,"projectNumber":"J1308","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2022-06-30T04:00:00+00:00","negInService":"2024-04-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Posey County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"AB Brown - Gibson 345kV Line","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":270.0,"dp2NrisMw":270.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396822,"projectNumber":"J1298","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-02-02T05:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","transmissionOwner":"SMMPA","county":"Freeborn County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hayward - Murphy Creek 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396823,"projectNumber":"J1334","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2022-07-27T04:00:00+00:00","negInService":"2024-06-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Burr Oak 345kV Line","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":199.5,"dp1NrisMw":199.5,"dp2ErisMw":199.5,"dp2NrisMw":199.5,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396824,"projectNumber":"J1306","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2024-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Commodore-Jordan 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396825,"projectNumber":"J1305","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2022-03-28T04:00:00+00:00","negInService":"2023-05-05T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Green County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Albany - Bass Creek 138kV Line","summerNetMW":49.9,"winterNetMW":49.9,"dp1ErisMw":49.9,"dp1NrisMw":49.9,"dp2ErisMw":49.9,"dp2NrisMw":49.9,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396826,"projectNumber":"J1337","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Sherburne County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Sherburne County 345 kV substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396827,"projectNumber":"J1296","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-12-01T05:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Gibson County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Francisco 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396828,"projectNumber":"J1336","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2023-01-30T05:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2022-07-27T04:00:00+00:00","negInService":"2025-02-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Burr Oak 345kV Line","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":199.5,"dp1NrisMw":199.5,"dp2ErisMw":199.5,"dp2NrisMw":199.5,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396829,"projectNumber":"J1338","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-07-15T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek - Montgomery 345 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396830,"projectNumber":"J1342","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-05-20T04:00:00+00:00","inService":"2023-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Starke 138kV Substation","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396831,"projectNumber":"J1375","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2023-09-29T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-05-12T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Du Pont - Cobb  -White Lake 138kv","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396832,"projectNumber":"J1385","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hendricks County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Stilesville 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396833,"projectNumber":"J1307","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-03-08T05:00:00+00:00","inService":"2022-12-01T05:00:00+00:00","transmissionOwner":"METC","county":"Eaton County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Oneida - Battle Creek 345kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396834,"projectNumber":"J1297","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-12-01T05:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Cornell - Bell Road 138 kV Line","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":170.0,"dp2NrisMw":170.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396835,"projectNumber":"J1335","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2022-07-27T04:00:00+00:00","negInService":"2024-06-24T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Burr Oak 345kV Line","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":199.5,"dp1NrisMw":199.5,"dp2ErisMw":199.5,"dp2NrisMw":199.5,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396836,"projectNumber":"J1299","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-04-30T04:00:00+00:00","transmissionOwner":"Ameren Missouri","county":"Scott County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Miner - Kelso 161kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":149.0,"dp1NrisMw":149.0,"dp2ErisMw":149.0,"dp2NrisMw":149.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396837,"projectNumber":"J1300","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Nobles County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Brewster - Elk 161kV Line","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396838,"projectNumber":"J1340","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2022-07-27T04:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Jasper County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Burr Oak 345kV Line","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":199.5,"dp1NrisMw":199.5,"dp2ErisMw":199.5,"dp2NrisMw":199.5,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396839,"projectNumber":"J1376","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-07-15T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Cooper County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Barnett - Georgetown Overton 161 kV Line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396840,"projectNumber":"J1387","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-31T05:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2024-04-26T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Circuit 6958 69 kV Line Tap","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":0.0,"dp2ErisMw":60.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396841,"projectNumber":"J1355","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-05-30T04:00:00+00:00","negInService":"2026-05-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"LaPorte County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Stillwell 138kV Subtation","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":131.0,"dp1NrisMw":131.0,"dp2ErisMw":131.0,"dp2NrisMw":131.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396842,"projectNumber":"J1388","queueDate":"2019-04-29T04:00:00+00:00","inService":"2021-12-31T05:00:00+00:00","negInService":"2024-12-15T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Gibson County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Oakland City - Old Ben Coal 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396843,"projectNumber":"J1389","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2023-03-21T04:00:00+00:00","negInService":"2025-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Murphy Station - Nelson Road 345 kV Line tap","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":120.0,"dp2NrisMw":120.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396844,"projectNumber":"J1380","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-07-17T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Cooper - Penton 230 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396845,"projectNumber":"J1339","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2022-07-27T04:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Starke County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Burr Oak 345kV Line","summerNetMW":199.5,"winterNetMW":199.5,"dp1ErisMw":199.5,"dp1NrisMw":199.5,"dp2ErisMw":199.5,"dp2NrisMw":199.5,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396846,"projectNumber":"J1301","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Prest 138kV Switching Station","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396847,"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-06-30T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"St. Clair County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Fayetteville Bee Hollow Road 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396848,"projectNumber":"J1302","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-12-01T05:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-02-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Muddy - Norris City 138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396849,"projectNumber":"J1309","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2019-09-12T04:00:00+00:00","inService":"2021-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Gillett 115 kV Substation","summerNetMW":129.9,"winterNetMW":129.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396850,"projectNumber":"J1310","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Blackstone - Marshall 138 kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396851,"projectNumber":"J1312","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2025-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"McCook County","state":"SD","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Grant 115 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396852,"projectNumber":"J1386","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Lake County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Green Acres 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396853,"projectNumber":"J1341","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Buchanan County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hazleton 345kV Substation","summerNetMW":398.0,"winterNetMW":398.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396854,"projectNumber":"J1343","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-03-05T05:00:00+00:00","inService":"2022-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Emery - Lime Creek 161 kV Line Tap","summerNetMW":96.0,"winterNetMW":96.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396855,"projectNumber":"J1377","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-07-15T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-07-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Wempletown - Rockdale 345kV Line Tap","summerNetMW":98.56,"winterNetMW":98.56,"dp1ErisMw":98.56,"dp1NrisMw":98.56,"dp2ErisMw":98.56,"dp2NrisMw":98.56,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396856,"projectNumber":"J1354","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-05-30T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-10-15T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Decatur County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Decatur  County 138kV Switching Station","summerNetMW":146.0,"winterNetMW":146.0,"dp1ErisMw":118.0,"dp1NrisMw":118.0,"dp2ErisMw":118.0,"dp2NrisMw":118.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396857,"projectNumber":"J1378","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2022-06-16T04:00:00+00:00","negInService":"2024-11-15T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Fountain County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Veedersburg West 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396858,"projectNumber":"J1379","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2025-12-19T05:00:00+00:00","transmissionOwner":"METC","county":"Montcalm County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Eureka - Vestaburg 138 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396859,"projectNumber":"J1356","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-05-20T04:00:00+00:00","inService":"2023-05-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Martin County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Whitfield 138kV Substation","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":135.0,"dp1NrisMw":74.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396860,"projectNumber":"J1382","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","negInService":"2025-05-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hutsonville - Neoga 138 kV Line tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396861,"projectNumber":"J1392","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"LaGrange County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lagrange 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396862,"projectNumber":"J1360","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","giaToExec":"2022-06-25T04:00:00+00:00","negInService":"2024-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Piatt County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Goose Creek 345kV Switchyard","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396863,"projectNumber":"J1390","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Bartholomew County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gallagher Station - Columbus 230 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396864,"projectNumber":"J1381","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2026-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Howard County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greentown 230 kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396865,"projectNumber":"J1357","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2023-01-31T05:00:00+00:00","inService":"2023-05-30T04:00:00+00:00","giaToExec":"2023-01-31T05:00:00+00:00","negInService":"2025-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Madison County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Madison 138 KV SUBSTATION","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396866,"projectNumber":"J1358","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-05-30T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2026-05-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"LaPorte County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Luchtman - Michigan City138kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396867,"projectNumber":"J1393","queueDate":"2019-04-29T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Pike County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cato 138 kV Substation","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":130.0,"dp2ErisMw":130.0,"dp2NrisMw":130.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396868,"projectNumber":"J1384","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-07-22T04:00:00+00:00","inService":"2022-04-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Ville Platte - West Fork 230 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396869,"projectNumber":"J1383","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-06-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ipava 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396870,"projectNumber":"J1407","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Porter County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"South Valparaiso 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":70.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396871,"projectNumber":"J1361","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2021-10-31T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-01-15T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Washington Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Lagen Holton - Franklinton 115kV Line (J1184)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396872,"projectNumber":"J1363","queueDate":"2019-04-26T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-07-15T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain County","state":"MO","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Spencer Creek - Montgomery 345 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396873,"projectNumber":"J1409","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BRPS","county":"Henderson County","state":"KY","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Henderson 161 kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396874,"projectNumber":"J1447","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2024-02-27T05:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-07-25T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Porter County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Schahfer - Green Acres 345kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396875,"projectNumber":"J1412","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-04-15T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Porter County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lake George - Schahfer GEN STA 345 kV Line Tap","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396876,"projectNumber":"J1449","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-02-10T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Monroe County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Morocco 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396877,"projectNumber":"J1457","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-08-05T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sugar Creek - Cayuga 345 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396878,"projectNumber":"J1451","queueDate":"2019-04-26T04:00:00+00:00","withdrawnDate":"2020-05-06T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Dorset 120 kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396879,"projectNumber":"J1469","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-06T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Marion - Marked Tree 161kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396880,"projectNumber":"J1460","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-06-30T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-06-30T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Sunrise 138 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":170.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396881,"projectNumber":"J1391","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-11-30T05:00:00+00:00","negInService":"2025-05-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Dubois County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Duff 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396882,"projectNumber":"J1394","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-02-08T05:00:00+00:00","inService":"2021-12-01T05:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Cornell - Layton138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396883,"projectNumber":"J1461","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Carver County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"McLeod - Blue Lake 230kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396884,"projectNumber":"J1454","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-30T04:00:00+00:00","giaToExec":"2020-12-22T05:00:00+00:00","negInService":"2021-08-18T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Mason 138 kV Substation","summerNetMW":58.5,"winterNetMW":58.5,"dp1ErisMw":40.9,"dp1NrisMw":40.9,"dp2ErisMw":40.9,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service (with Provisional GIA)"},{"id":3396885,"projectNumber":"J1406","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-02-07T05:00:00+00:00","inService":"2021-09-03T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kenowa - Ludington 345 kV Line Tap","summerNetMW":25.2,"winterNetMW":25.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396886,"projectNumber":"J1408","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2025-08-05T04:00:00+00:00","inService":"2023-06-15T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2026-06-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macoupin County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Virden 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396887,"projectNumber":"J1410","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-10-30T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dane County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"N. Madison 345 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":240.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396888,"projectNumber":"J1413","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-09-01T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Howard County,Mitchell County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Hazleton - Mitchell County 345 kV Line tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":235.0,"dp1NrisMw":215.0,"dp2ErisMw":235.0,"dp2NrisMw":188.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396889,"projectNumber":"J1448","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-05-20T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BRPS","county":"Caldwell County","state":"KY","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hopkins - Caldwell County - Barkely 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396890,"projectNumber":"J1467","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Fayette County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"ITC 161kV Windsor - Hazleton 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396891,"projectNumber":"J1450","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BRPS","county":"Webster County","state":"KY","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hopkins - Reid161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396892,"projectNumber":"J1458","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-01-25T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-01-26T05:00:00+00:00","negInService":"2024-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC","county":"Washington County","state":"MS","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Ray Braswell - Tinnin - Gerald Andrus 230kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":170.0,"dp2ErisMw":200.0,"dp2NrisMw":170.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396893,"projectNumber":"J1472","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-08-17T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-08-17T04:00:00+00:00","negInService":"2024-03-31T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Leoni - Parr Raod 138kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396894,"projectNumber":"J1455","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-09-12T04:00:00+00:00","doneDate":"2022-04-15T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-04-18T04:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Mary,St. Mary Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Teche - Morbihan 138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396895,"projectNumber":"J1453","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-30T04:00:00+00:00","giaToExec":"2022-03-18T04:00:00+00:00","negInService":"2022-05-03T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Havana - Shockey 138 kV Line Tap","summerNetMW":188.3,"winterNetMW":188.3,"dp1ErisMw":165.0,"dp1NrisMw":165.0,"dp2ErisMw":165.0,"dp2NrisMw":165.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396896,"projectNumber":"J1462","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-06T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Acadia - Scanlan 138kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396897,"projectNumber":"J1473","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-24T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lawrence Creek - Shafer 115kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396898,"projectNumber":"J1464","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-30T04:00:00+00:00","giaToExec":"2022-11-23T05:00:00+00:00","negInService":"2024-03-03T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macoupin County,Morgan County,Sangamon County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Meredosia - Austin 345 kV Line tap","summerNetMW":592.8,"winterNetMW":592.8,"dp1ErisMw":592.8,"dp1NrisMw":592.8,"dp2ErisMw":592.8,"dp2NrisMw":592.8,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396899,"projectNumber":"J1362","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-02-13T05:00:00+00:00","inService":"2021-08-27T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kenowa - Ludington 345 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396900,"projectNumber":"J1364","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-05T04:00:00+00:00","inService":"2022-07-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Marked Tree - Marion 161 kV Line tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396901,"projectNumber":"J1405","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-05-20T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Greene County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sanborn - Linton 138 kV Line Tap","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396902,"projectNumber":"J1411","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2022-11-14T05:00:00+00:00","negInService":"2025-10-30T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Dane County","state":"WI","studyCycle":"DPP-2019","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"N. Madison 345 kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396903,"projectNumber":"J1414","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-08-04T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Datto-Corning North 161 kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396904,"projectNumber":"J1446","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-21T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Wright County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lake Pulaski 115kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396905,"projectNumber":"J1474","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2023-11-14T05:00:00+00:00","doneDate":"2023-01-26T05:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","giaToExec":"2023-01-26T05:00:00+00:00","negInService":"2025-07-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chippewa County","state":"WI","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Pine Lake - Eagle Point 115kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":180.0,"dp2NrisMw":180.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396906,"projectNumber":"J1475","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-04-18T04:00:00+00:00","giaToExec":"2022-06-27T04:00:00+00:00","negInService":"2023-05-02T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark County","state":"IL","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Casey West - Sullivan 345 kV Line Tap","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396907,"projectNumber":"J1468","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-21T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota County","state":"MN","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"West Hastings 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396908,"projectNumber":"J1459","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2020-01-27T05:00:00+00:00","inService":"2024-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2019","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta - Tompkins 345 kV Line Tap","summerNetMW":670.0,"winterNetMW":670.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396909,"projectNumber":"J1470","queueDate":"2019-04-29T04:00:00+00:00","inService":"2019-04-30T04:00:00+00:00","giaToExec":"2022-11-11T05:00:00+00:00","negInService":"2023-03-21T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Benton County,Warren County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Cayuga CT 345kV Substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":30.0,"dp2ErisMw":0.0,"dp2NrisMw":30.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396910,"projectNumber":"J1465","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2022-04-15T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-04-08T04:00:00+00:00","negInService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Pointe Coupee,Pointe Coupee Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Livonia - Colonial Springs 138kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396911,"projectNumber":"J502","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Orange County","state":"TX","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"McLewis 230 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396912,"projectNumber":"J556","queueDate":"2016-04-04T04:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-12-31T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Renville County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Panther 230kV Substation","summerNetMW":102.0,"winterNetMW":102.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396913,"projectNumber":"J1466","queueDate":"2019-04-29T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","giaToExec":"2022-05-25T04:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION","county":"Henderson County","state":"KY","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reid EHV 161 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396914,"projectNumber":"J1456","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-09-01T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Sheridan County","state":"ND","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Harvey - Underwood 230 kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396915,"projectNumber":"J1452","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2021-03-18T04:00:00+00:00","inService":"2022-10-30T04:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Red River Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Carroll - Mansfield 138 kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396916,"projectNumber":"J1471","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2022-02-21T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Lee County","state":"IA","studyCycle":"DPP-2019","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"ITC 161kV Wever Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396917,"projectNumber":"J522","queueDate":"2015-11-16T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Mower County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Adams substation at 69 kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396918,"projectNumber":"J704","queueDate":"2016-09-08T04:00:00+00:00","inService":"2019-03-01T05:00:00+00:00","giaToExec":"2017-10-27T04:00:00+00:00","negInService":"2018-12-01T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Baraga County","state":"MI","studyCycle":"DPP-2016 AUG/2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"M38 Substation 138kV","summerNetMW":54.9,"winterNetMW":54.9,"dp1ErisMw":54.9,"dp1NrisMw":54.9,"dp2ErisMw":54.9,"dp2NrisMw":54.9,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396919,"projectNumber":"J1463","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2024-06-04T04:00:00+00:00","doneDate":"2022-04-07T04:00:00+00:00","inService":"2021-10-20T04:00:00+00:00","giaToExec":"2022-04-07T04:00:00+00:00","negInService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"West Baton Rouge Parish","state":"LA","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Addis - Big Cajun 230 kV Line Tap (J639)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":45.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396920,"projectNumber":"J703","queueDate":"2016-09-08T04:00:00+00:00","inService":"2019-03-01T05:00:00+00:00","giaToExec":"2017-10-13T04:00:00+00:00","negInService":"2018-12-01T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marquette County","state":"MI","studyCycle":"DPP-2016 AUG/2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Huron 138kV Substation -looping Lines FREG11 (National to Freeman) & Goose Lake (PI to Empire)","summerNetMW":128.1,"winterNetMW":128.1,"dp1ErisMw":128.1,"dp1NrisMw":128.1,"dp2ErisMw":128.1,"dp2NrisMw":128.1,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396921,"projectNumber":"J508","queueDate":"2015-11-16T05:00:00+00:00","withdrawnDate":"2017-07-17T04:00:00+00:00","inService":"2017-04-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Clark County","state":"AR","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"tap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat","summerNetMW":42.7,"winterNetMW":42.7,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396922,"projectNumber":"J707","queueDate":"2016-09-09T04:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Barnes County","state":"ND","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Buffalo 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396923,"projectNumber":"J579","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2018-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Argenta 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396924,"projectNumber":"J580","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Burleigh County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Nepoleon Sub 230kV","summerNetMW":298.0,"winterNetMW":298.0,"dp1ErisMw":298.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396925,"projectNumber":"J705","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morton County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Tri-county 230 kV substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396926,"projectNumber":"J710","queueDate":"2016-09-09T04:00:00+00:00","withdrawnDate":"2018-01-24T05:00:00+00:00","doneDate":"2018-01-24T05:00:00+00:00","inService":"2018-06-01T04:00:00+00:00","negInService":"2018-11-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Lafayette Parish","state":"LA","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Duson - Scott line 69kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396927,"projectNumber":"J711","queueDate":"2016-09-09T04:00:00+00:00","withdrawnDate":"2018-12-10T05:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","giaToExec":"2017-10-27T04:00:00+00:00","negInService":"2020-09-23T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Baraga County","state":"MI","studyCycle":"DPP-2016 AUG/2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Silver River 138kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":130.0,"dp2ErisMw":130.0,"dp2NrisMw":130.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396928,"projectNumber":"J759","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-02-15T05:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2020-07-02T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY REC, INC","county":"Spencer County","state":"IN","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Troy 161kV Sub","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":69.9,"dp2ErisMw":70.0,"dp2NrisMw":69.9,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396929,"projectNumber":"J545","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2020-08-31T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2022-12-15T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lincoln County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Buffalo 115kV Substation","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":0.0,"dp2ErisMw":110.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396930,"projectNumber":"J570","queueDate":"2016-05-06T04:00:00+00:00","withdrawnDate":"2019-08-05T04:00:00+00:00","inService":"2018-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Atchison County","state":"MO","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cooper - Atchison 345kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396931,"projectNumber":"J709","queueDate":"2016-09-09T04:00:00+00:00","withdrawnDate":"2019-01-11T05:00:00+00:00","doneDate":"2018-10-17T04:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","giaToExec":"2018-05-16T04:00:00+00:00","negInService":"2020-04-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"Greene County","state":"MS","studyCycle":"DPP-2017-FEB","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Green Substation 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396932,"projectNumber":"J760","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-03-27T04:00:00+00:00","inService":"2019-04-08T04:00:00+00:00","giaToExec":"2018-10-05T04:00:00+00:00","negInService":"2019-04-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Rock County","state":"WI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"New Kitty Hawk 345kV substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":30.0,"dp1NrisMw":30.0,"dp2ErisMw":30.0,"dp2NrisMw":30.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396933,"projectNumber":"J712","queueDate":"2016-09-09T04:00:00+00:00","withdrawnDate":"2018-04-10T04:00:00+00:00","inService":"2020-09-20T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Iowa County","state":"WI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Hill Valley 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396934,"projectNumber":"J758","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-10-25T04:00:00+00:00","inService":"2018-10-01T04:00:00+00:00","giaToExec":"2019-05-24T04:00:00+00:00","negInService":"2022-04-08T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Verona-Foundry 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396935,"projectNumber":"J761","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Faribault County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Huntley 345 kV sub","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396936,"projectNumber":"J718","queueDate":"2016-09-13T04:00:00+00:00","doneDate":"2020-04-21T04:00:00+00:00","inService":"2020-12-31T05:00:00+00:00","giaToExec":"2019-10-14T04:00:00+00:00","negInService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE","county":"Fillmore County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cherry Grove 69kV Substation","summerNetMW":49.98,"winterNetMW":49.98,"dp1ErisMw":49.98,"dp1NrisMw":49.98,"dp2ErisMw":45.0,"dp2NrisMw":45.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396937,"projectNumber":"J715","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-12-09T05:00:00+00:00","inService":"2019-08-31T04:00:00+00:00","giaToExec":"2019-06-01T04:00:00+00:00","negInService":"2021-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marshall County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"McLean County-Oglesby 138kV Line 1382","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":98.0,"dp1NrisMw":98.0,"dp2ErisMw":98.0,"dp2NrisMw":98.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396938,"projectNumber":"J731","queueDate":"2016-11-08T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY COMPANY","county":"Palo Alto County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Kossuth-O'Brien 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396939,"projectNumber":"J768","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2019-01-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Story County Substation","summerNetMW":12.0,"winterNetMW":12.0,"dp1ErisMw":12.0,"dp1NrisMw":12.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396940,"projectNumber":"J720","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2019-09-02T04:00:00+00:00","negInService":"2021-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lakefield - Raun 345 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396941,"projectNumber":"J769","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-07-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Renville County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Kingman Run-Bird Island 69kV","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396942,"projectNumber":"J734","queueDate":"2016-11-10T05:00:00+00:00","doneDate":"2019-02-19T05:00:00+00:00","inService":"2017-06-01T04:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2017-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Ford County","state":"IL","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Gibson City South Substation","summerNetMW":57.1,"winterNetMW":57.1,"dp1ErisMw":11.5,"dp1NrisMw":11.5,"dp2ErisMw":11.5,"dp2NrisMw":11.5,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396943,"projectNumber":"J733","queueDate":"2016-11-08T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"J416 345 kV Interconnection Facilitities to be Owned by ITCM","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396944,"projectNumber":"J721","queueDate":"2016-10-24T04:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Codington County,Deuel County","state":"SD","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Stone South substation, Big Stone City","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396945,"projectNumber":"J722","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2026-08-28T04:00:00+00:00","doneDate":"2021-10-04T04:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","giaToExec":"2021-11-05T04:00:00+00:00","negInService":"2023-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTPW","county":"Codington County,Deuel County","state":"SD","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Big Stone South 230kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396946,"projectNumber":"J739","queueDate":"2016-11-11T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lyon County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lyon County 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396947,"projectNumber":"J706","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morton County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Tri-county 230kV sub","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396948,"projectNumber":"J708","queueDate":"2016-09-09T04:00:00+00:00","withdrawnDate":"2019-05-02T04:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","negInService":"2019-07-01T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Posey County","state":"IN","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"AB Brown 138 kV sub","summerNetMW":847.0,"winterNetMW":847.0,"dp1ErisMw":847.0,"dp1NrisMw":847.0,"dp2ErisMw":847.0,"dp2NrisMw":847.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396949,"projectNumber":"J584","queueDate":"2016-05-09T04:00:00+00:00","withdrawnDate":"2020-09-29T04:00:00+00:00","doneDate":"2019-03-26T04:00:00+00:00","inService":"2018-09-15T04:00:00+00:00","giaToExec":"2018-10-05T04:00:00+00:00","negInService":"2021-05-15T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Green County","state":"WI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Blacksmith Tap - Spring Grove 69kV Line","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396950,"projectNumber":"J625","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-04T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Meeker County,Renville County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Blue Lake 345kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396951,"projectNumber":"J762","queueDate":"2016-11-14T05:00:00+00:00","doneDate":"2019-03-08T05:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2021-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION","county":"Meade County","state":"KY","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Meade Sub 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396952,"projectNumber":"J728","queueDate":"2016-11-02T04:00:00+00:00","doneDate":"2019-10-08T04:00:00+00:00","inService":"2019-09-03T04:00:00+00:00","giaToExec":"2019-06-10T04:00:00+00:00","negInService":"2020-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Edenville Junction to Warren 138 kV Line","summerNetMW":200.1,"winterNetMW":200.1,"dp1ErisMw":200.1,"dp1NrisMw":200.1,"dp2ErisMw":186.3,"dp2NrisMw":186.3,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396953,"projectNumber":"J766","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2018-01-01T05:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Oliver County","state":"ND","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Square Butte 230kV Substation","summerNetMW":3.84,"winterNetMW":3.84,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396954,"projectNumber":"J717","queueDate":"2016-09-12T04:00:00+00:00","doneDate":"2019-10-08T04:00:00+00:00","inService":"2019-09-03T04:00:00+00:00","giaToExec":"2019-06-10T04:00:00+00:00","negInService":"2020-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella County","state":"MI","studyCycle":"DPP-2017-FEB","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Edenville Junction to Warren 138 kV Line","summerNetMW":200.1,"winterNetMW":200.1,"dp1ErisMw":200.1,"dp1NrisMw":200.1,"dp2ErisMw":200.1,"dp2NrisMw":200.1,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396955,"projectNumber":"J732","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-07-29T04:00:00+00:00","inService":"2021-06-08T04:00:00+00:00","giaToExec":"2019-11-21T05:00:00+00:00","negInService":"2023-11-10T05:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Douglas County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Arrowhead - Stone Lake 345kV Line","summerNetMW":527.8,"winterNetMW":561.5,"dp1ErisMw":561.5,"dp1NrisMw":561.5,"dp2ErisMw":561.5,"dp2NrisMw":561.5,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396956,"projectNumber":"J770","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2019-07-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Renville County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bird Island to Henryville Tap 69kV Line","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396957,"projectNumber":"J725","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-02-15T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Murray County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cedar Mountain 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396958,"projectNumber":"J740","queueDate":"2016-11-11T05:00:00+00:00","withdrawnDate":"2020-08-10T04:00:00+00:00","doneDate":"2019-03-15T04:00:00+00:00","inService":"2020-09-23T04:00:00+00:00","giaToExec":"2018-11-13T05:00:00+00:00","negInService":"2020-10-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,Pulaski County","state":"IN","studyCycle":"DPP-2017-FEB","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynold 345kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396959,"projectNumber":"J741","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Emmons County,Logan County","state":"ND","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Wishek - Linton 115kV","summerNetMW":51.0,"winterNetMW":51.0,"dp1ErisMw":50.4,"dp1NrisMw":50.4,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396960,"projectNumber":"J795","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Gallatin County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gallatin Junction 161 kV Substation","summerNetMW":69.0,"winterNetMW":69.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396961,"projectNumber":"J796","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-06-12T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-06-18T04:00:00+00:00","negInService":"2020-11-20T05:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Goss 138kV Substation","summerNetMW":239.0,"winterNetMW":239.0,"dp1ErisMw":239.0,"dp1NrisMw":239.0,"dp2ErisMw":239.0,"dp2NrisMw":239.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396962,"projectNumber":"J799","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-05-13T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2021-11-11T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Washtenaw County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Milan - Pioneer 120kV Line Tap","summerNetMW":189.0,"winterNetMW":189.0,"dp1ErisMw":189.0,"dp1NrisMw":189.0,"dp2ErisMw":189.0,"dp2NrisMw":189.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396963,"projectNumber":"J801","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2024-07-22T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2023-11-10T05:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE","county":"Pierce County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Crystal Cave-Rock Elm 161kV line tap","summerNetMW":74.0,"winterNetMW":74.0,"dp1ErisMw":74.0,"dp1NrisMw":74.0,"dp2ErisMw":74.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396964,"projectNumber":"J804","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-04-16T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY REC, INC","county":"Decatur County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Decatur 138kV Substation","summerNetMW":119.0,"winterNetMW":119.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396965,"projectNumber":"J856","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2023-03-07T05:00:00+00:00","doneDate":"2019-11-15T05:00:00+00:00","inService":"2021-04-01T04:00:00+00:00","giaToExec":"2019-07-22T04:00:00+00:00","negInService":"2021-03-15T04:00:00+00:00","transmissionOwner":"Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.","county":"Vanderburgh County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Scott (TWP 138/69) 138 kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":80.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396966,"projectNumber":"J857","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-06-10T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2020-01-06T05:00:00+00:00","negInService":"2022-02-07T05:00:00+00:00","transmissionOwner":"METC","county":"Calhoun County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Verona - Foundry 138 kV Line Tap","summerNetMW":124.95,"winterNetMW":124.95,"dp1ErisMw":124.95,"dp1NrisMw":124.95,"dp2ErisMw":124.95,"dp2NrisMw":124.95,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396967,"projectNumber":"J860","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-03-30T04:00:00+00:00","transmissionOwner":"Entergy","county":"Jefferson Davis Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"New Jefferson Davis 138 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396968,"projectNumber":"J861","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-05-22T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Marquette County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Dead River - Arnold 345 kV Line","summerNetMW":99.96,"winterNetMW":99.96,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396969,"projectNumber":"J797","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-05-30T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ashley 138 kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396970,"projectNumber":"J800","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-22T04:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","giaToExec":"2019-11-14T05:00:00+00:00","negInService":"2022-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"White County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396971,"projectNumber":"J713","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2021-01-29T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Oliver County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Square Butte East 230kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396972,"projectNumber":"J714","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-04-17T04:00:00+00:00","inService":"2019-08-31T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Montgomery County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Frankfurt - Cayuga 230kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":192.0,"dp1NrisMw":192.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396973,"projectNumber":"J802","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-05-22T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"Duke Energy Corporation","county":"Vermillion County","state":"IN","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cayuga 345 kV Substation","summerNetMW":1244.0,"winterNetMW":1244.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Combined Cycle","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396974,"projectNumber":"J803","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2023-04-25T04:00:00+00:00","doneDate":"2021-05-19T04:00:00+00:00","inService":"2019-10-01T04:00:00+00:00","giaToExec":"2021-05-19T04:00:00+00:00","negInService":"2023-11-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lyon County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"ERIS","poiName":"Tracy 69 kV line","summerNetMW":32.5,"winterNetMW":32.5,"dp1ErisMw":32.5,"dp1NrisMw":0.0,"dp2ErisMw":32.5,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396975,"projectNumber":"J887","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2020-09-30T04:00:00+00:00","negInService":"2019-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Knox County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"G545 138kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396976,"projectNumber":"J888","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-08-19T04:00:00+00:00","inService":"2019-01-01T05:00:00+00:00","giaToExec":"2019-06-06T04:00:00+00:00","negInService":"2019-07-22T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"George County","state":"MS","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Benndale 69kV Substation","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":25.0,"dp2NrisMw":25.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396977,"projectNumber":"J767","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-08-09T04:00:00+00:00","inService":"2019-01-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hancock County","state":"IA","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lime Creek 161 kV substation","summerNetMW":12.0,"winterNetMW":12.0,"dp1ErisMw":12.0,"dp1NrisMw":12.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396978,"projectNumber":"J726","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-11-19T05:00:00+00:00","inService":"2019-09-15T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Cottonwood County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cedar Mountain 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396979,"projectNumber":"J862","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-03-25T04:00:00+00:00","inService":"2019-05-31T04:00:00+00:00","transmissionOwner":"Entergy","county":"Orleans Parish","state":"LA","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"NASA-Michoud 115 kV Line","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396980,"projectNumber":"J864","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-04-27T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","giaToExec":"2019-11-14T05:00:00+00:00","negInService":"2022-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Richland County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Lone Rock 69kV Substation","summerNetMW":49.98,"winterNetMW":49.98,"dp1ErisMw":49.98,"dp1NrisMw":49.98,"dp2ErisMw":49.98,"dp2NrisMw":49.98,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396981,"projectNumber":"J965","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-19T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"Xcel Energy","county":"Cottonwood County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lakefield Generation SW 345kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396982,"projectNumber":"J968","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-10-12T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","giaToExec":"2021-10-13T04:00:00+00:00","negInService":"2023-04-20T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper County,White County","state":"IN","studyCycle":"DPP-2018-APR","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396983,"projectNumber":"J743","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2020-07-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bison 345kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396984,"projectNumber":"J886","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-25T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","giaToExec":"2019-07-31T04:00:00+00:00","negInService":"2020-08-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Manitowoc County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kewaunee 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396985,"projectNumber":"J745","queueDate":"2016-11-14T05:00:00+00:00","withdrawnDate":"2019-04-09T04:00:00+00:00","inService":"2021-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Nobles County","state":"MN","studyCycle":"DPP-2017-FEB","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Nobles-Fenton 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396986,"projectNumber":"J798","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-08T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Walworth County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"University - Mukwanago UNIG52 Line Tap","summerNetMW":124.0,"winterNetMW":124.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396987,"projectNumber":"J859","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-01-23T05:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-07-22T04:00:00+00:00","negInService":"2022-05-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cass County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Frederick North - Meredosia East 138kV Line","summerNetMW":149.94,"winterNetMW":149.94,"dp1ErisMw":149.94,"dp1NrisMw":149.94,"dp2ErisMw":149.94,"dp2NrisMw":149.94,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3396988,"projectNumber":"J890","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Presque Isle County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Port Calcite - Riggsville 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396989,"projectNumber":"J893","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2019-11-20T05:00:00+00:00","inService":"2021-08-01T04:00:00+00:00","giaToExec":"2019-06-03T04:00:00+00:00","negInService":"2021-08-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"White County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Searcy Price Sub 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396990,"projectNumber":"J894","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Woodruff County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"McCrory - Moses 161kV Substation","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396991,"projectNumber":"J895","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-07T05:00:00+00:00","inService":"2020-04-01T04:00:00+00:00","transmissionOwner":"Entergy","county":"Lonoke County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Carlisle - Lonoke East 115kV Line Tap","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396992,"projectNumber":"J961","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2021-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"West Baton Rouge Parish","state":"LA","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Livonia - Wilbert 138 kV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396993,"projectNumber":"J963","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2017-01-01T05:00:00+00:00","giaToExec":"2021-06-16T04:00:00+00:00","negInService":"2017-01-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cedar County","state":"IA","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bennett (CIPCO) - Graham 69 Kv Line Tap","summerNetMW":9.0,"winterNetMW":9.0,"dp1ErisMw":9.0,"dp1NrisMw":9.0,"dp2ErisMw":9.0,"dp2NrisMw":9.0,"fuelType":"Diesel","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396994,"projectNumber":"J1415","queueDate":"2019-04-29T04:00:00+00:00","doneDate":"2021-11-29T05:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","giaToExec":"2021-11-30T05:00:00+00:00","negInService":"2024-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Lonoke County","state":"AR","studyCycle":"DPP-2019","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"KEO EHV 500 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396995,"projectNumber":"J811","queueDate":"2017-06-16T04:00:00+00:00","doneDate":"2020-03-25T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","giaToExec":"2019-07-15T04:00:00+00:00","negInService":"2021-05-28T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette County","state":"IL","studyCycle":"DPP-2017-AUG","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ramsey East 138kV Substation","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3396996,"projectNumber":"J1332","queueDate":"2019-04-29T04:00:00+00:00","withdrawnDate":"2024-03-08T05:00:00+00:00","inService":"2022-04-20T04:00:00+00:00","giaToExec":"2023-01-30T05:00:00+00:00","negInService":"2025-04-20T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP","county":"Jasper County","state":"IN","studyCycle":"DPP-2019","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Rollin Schahfer - Lake George 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":194.0,"dp2NrisMw":194.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3396997,"projectNumber":"J858","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2017-09-01T04:00:00+00:00","inService":"2019-09-29T04:00:00+00:00","transmissionOwner":"Entergy","county":"Bradley County","state":"AR","studyCycle":"DPP-2017-AUG","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Hilo 115 kV Switch","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396998,"projectNumber":"J889","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-10-24T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Nelson County","state":"ND","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Ramsey - Prairie 230KV Line Tap","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3396999,"projectNumber":"J891","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-07-23T04:00:00+00:00","inService":"2020-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pipestone County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Buffalo Ridge - Pipestone 115kV Line Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397000,"projectNumber":"J892","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-03-12T04:00:00+00:00","inService":"2019-09-01T04:00:00+00:00","transmissionOwner":"American Transmission Co. LLC","county":"Walworth County","state":"WI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Bluff Creek (Tap) to Sugar Creek 138 kV line tap","summerNetMW":74.97,"winterNetMW":74.97,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397001,"projectNumber":"J962","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2020-08-12T04:00:00+00:00","inService":"2021-01-31T05:00:00+00:00","giaToExec":"2020-03-30T04:00:00+00:00","negInService":"2022-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC","county":"DeSoto County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Twinkletown 230 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397002,"projectNumber":"J967","queueDate":"2018-03-12T04:00:00+00:00","doneDate":"2021-06-15T04:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","giaToExec":"2021-06-15T04:00:00+00:00","negInService":"2023-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Mower County","state":"MN","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Adams 345kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397003,"projectNumber":"J863","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2018-12-18T05:00:00+00:00","inService":"2021-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota County","state":"MN","studyCycle":"DPP-2017-AUG","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Rosemount  - Nininger 115kV Line","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397004,"projectNumber":"J865","queueDate":"2017-06-16T04:00:00+00:00","withdrawnDate":"2019-01-09T05:00:00+00:00","inService":"2020-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"St. Clair County","state":"MI","studyCycle":"DPP-2017-AUG","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Lee - Menlo 120kV Line","summerNetMW":79.97,"winterNetMW":79.97,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397005,"projectNumber":"J964","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2019-08-29T04:00:00+00:00","inService":"2020-10-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC","county":"Hinds County","state":"MS","studyCycle":"DPP-2018-APR","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Edwards - Bolton 115kV Line Tap","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397006,"projectNumber":"J966","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2020-03-25T04:00:00+00:00","inService":"2020-12-01T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Putnam County,Sullivan County","state":"MO","studyCycle":"DPP-2018-APR","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Zachary 345kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397007,"projectNumber":"J970","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-10-17T04:00:00+00:00","inService":"2020-01-01T05:00:00+00:00","transmissionOwner":"METC","county":"Oscoda County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Mio Dam - Gaylord 138 kV Line Tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397008,"projectNumber":"J1691","queueDate":"2020-06-24T04:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gibson Sta - Merom (HED) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397009,"projectNumber":"J1688","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-10-02T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Rising 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397010,"projectNumber":"J1689","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Cadiz 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397011,"projectNumber":"J1694","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Lawrence","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lost River 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397012,"projectNumber":"J1696","queueDate":"2020-06-11T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","negInService":"2026-06-12T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reid EHV 161kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397013,"projectNumber":"J1702","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-14T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Faraday 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397014,"projectNumber":"J1704","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2023-11-28T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Shelby","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gwynneville 345kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397015,"projectNumber":"J1690","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-03-15T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lewisville 138kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397016,"projectNumber":"J1693","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-19T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chippewa","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Maynard XMSN 115kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397017,"projectNumber":"J1698","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-21T05:00:00+00:00","inService":"2023-08-02T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Tammany","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Talisheek - North Slidell 230kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397018,"projectNumber":"J1699","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Shelby","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"HE Lewis Creek 69 kV","summerNetMW":43.0,"winterNetMW":43.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397019,"projectNumber":"J969","queueDate":"2018-03-12T04:00:00+00:00","withdrawnDate":"2018-11-01T04:00:00+00:00","inService":"2020-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tuscola County","state":"MI","studyCycle":"DPP-2018-APR","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Kirk 345kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397020,"projectNumber":"J1692","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-03T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Cass","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Walton 345 kV  Substation","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397021,"projectNumber":"J1701","queueDate":"2021-12-03T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McDonough","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Macomb to Ipava 138kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":191.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397022,"projectNumber":"J1705","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-02-23T05:00:00+00:00","inService":"2024-02-20T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"South Fond du Lac (Endpoint A) to Columbia (Endpoint B)  345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397023,"projectNumber":"J1695","queueDate":"2023-12-12T05:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Aster 138kV Substation (Rebuild of North Coulterville 138kV)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397024,"projectNumber":"J1697","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Lawrence","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Shawswick to Pleasant Grove 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397025,"projectNumber":"J1706","queueDate":"2020-06-23T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","negInService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Green","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Monroe 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397026,"projectNumber":"J1708","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2023-06-22T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Grant","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"J947 Interconnection Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397027,"projectNumber":"J1707","queueDate":"2021-10-22T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Dubois","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"DUFF 345KV","summerNetMW":72.0,"winterNetMW":72.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397028,"projectNumber":"J1714","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ramsey East 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397029,"projectNumber":"J1715","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Decatur","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"HE Westport 138kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397030,"projectNumber":"J1716","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2024-10-21T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Fond du Lac","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"South Fond du Lac - Fitzgerald 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3397031,"projectNumber":"J1703","queueDate":"2022-02-11T05:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Webster","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reid to Hopkins County 161kV","summerNetMW":74.0,"winterNetMW":74.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397032,"projectNumber":"J1711","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-30T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Green","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"North Monroe 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397033,"projectNumber":"J1712","queueDate":"2020-06-23T04:00:00+00:00","inService":"2022-12-15T05:00:00+00:00","negInService":"2025-12-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"North Coulterville - COMM 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397034,"projectNumber":"J1713","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Faraday (138 kV)","summerNetMW":147.2,"winterNetMW":147.2,"dp1ErisMw":147.19,"dp1NrisMw":147.19,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397035,"projectNumber":"J1718","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-09-18T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Bunsonville 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397036,"projectNumber":"J1722","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-02-09T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Galloway - Remigton 115kV  Transmission Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397037,"projectNumber":"J1723","queueDate":"2021-11-02T04:00:00+00:00","withdrawnDate":"2022-08-05T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Wynne East to Wynne South 161kV line (J1125 sub)","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":10.0,"dp1NrisMw":10.0,"dp2ErisMw":10.0,"dp2NrisMw":10.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397038,"projectNumber":"J1725","queueDate":"2020-06-23T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2027-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"San Jose Rail Splitter 138KV (G515)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":14.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397039,"projectNumber":"J1709","queueDate":"2022-01-21T05:00:00+00:00","withdrawnDate":"2024-10-15T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2022-02-01T05:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2025-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Grimes","state":"TX","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"138 kV Grimes","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3397040,"projectNumber":"J1726","queueDate":"2020-06-15T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Pulaski","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds - Burr 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397041,"projectNumber":"J1700","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-10-22T04:00:00+00:00","inService":"2023-04-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Johnson","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"FRANKLIN 230KV","summerNetMW":288.0,"winterNetMW":288.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397042,"projectNumber":"J1710","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-13T04:00:00+00:00","negInService":"2026-09-13T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"KEO EHV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397043,"projectNumber":"J1717","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Decatur","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greensburg 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397044,"projectNumber":"J1719","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Sand Lake 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397045,"projectNumber":"J1720","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-05-20T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Fountain Prairie -North Randolph   138kV Transmission Line","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397046,"projectNumber":"J1721","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2025-11-26T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"TH Pfizer Jct. - Worthington (HED)","summerNetMW":175.12,"winterNetMW":175.12,"dp1ErisMw":175.12,"dp1NrisMw":175.12,"dp2ErisMw":175.12,"dp2NrisMw":175.12,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3397047,"projectNumber":"J1724","queueDate":"2021-12-03T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"LNG - STILLWELL 138kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397048,"projectNumber":"J1591","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clay","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Staunton 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397049,"projectNumber":"J1589","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2022-01-04T05:00:00+00:00","inService":"2022-12-15T05:00:00+00:00","transmissionOwner":"METC","county":"Clinton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Hubbardston - Tech Drive 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397050,"projectNumber":"J1592","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2023-12-08T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pope","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"MORRILTON EAST - Atkins 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397051,"projectNumber":"J1593","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Rush","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greensboro-Gwynneville 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397052,"projectNumber":"J1594","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Clark","state":"SD","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Stone to Ellendale 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397053,"projectNumber":"J1730","queueDate":"2022-03-17T04:00:00+00:00","inService":"2024-06-06T04:00:00+00:00","negInService":"2027-06-06T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dunn","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Eau Claire to AS King 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397054,"projectNumber":"J1597","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Wadena","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Wing River Substation 230kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397055,"projectNumber":"J1598","queueDate":"2023-12-11T05:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Goos Ferry","summerNetMW":325.0,"winterNetMW":325.0,"dp1ErisMw":325.0,"dp1NrisMw":0.0,"dp2ErisMw":325.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397056,"projectNumber":"J1599","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2026-02-13T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2025-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Iberia","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Morbihan - Hopkins 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3397057,"projectNumber":"J1605","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Sherburne","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"SHERBURNE CO","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397058,"projectNumber":"J1607","queueDate":"2020-06-25T04:00:00+00:00","inService":"2024-01-15T05:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2025-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Hardin West SS to Sheridan 115 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397059,"projectNumber":"J1595","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-01-05T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Martin","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Kirk 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397060,"projectNumber":"J1606","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-15T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Attica 230kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397061,"projectNumber":"J1610","queueDate":"2020-06-16T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","negInService":"2026-08-31T04:00:00+00:00","transmissionOwner":"CITY WATER LIGHT & POWER","county":"Sangamon","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Auburn North to Chatham Main 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397062,"projectNumber":"J1615","queueDate":"2020-06-17T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Oconto","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Morgan","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397063,"projectNumber":"J1590","queueDate":"2024-06-05T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","negInService":"2026-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Plymouth","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"REMSEN TOWNSHIP","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":40.0,"dp2ErisMw":200.0,"dp2NrisMw":40.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397064,"projectNumber":"J1727","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hancock","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lime Creek 161kV","summerNetMW":33.75,"winterNetMW":33.75,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397065,"projectNumber":"J1596","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2021-02-24T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Sand Lake 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397066,"projectNumber":"J1611","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morrison","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Langdon 115 kV Sub","summerNetMW":174.0,"winterNetMW":174.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":120.0,"dp2NrisMw":120.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397067,"projectNumber":"J1613","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Bison Substation 345 kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397068,"projectNumber":"J1616","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","negInService":"2026-08-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Edwardsport","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397069,"projectNumber":"J1617","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Bunsonville 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397070,"projectNumber":"J1618","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2024-02-09T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ascension","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"ST. JAMES - WELCOME 230KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397071,"projectNumber":"J1619","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2024-04-15T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Webster","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reid Switchyard 161kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":160.0,"dp2NrisMw":160.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397072,"projectNumber":"J1620","queueDate":"2024-04-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pipestone","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Split Rock - Pipestone 115.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":0.0,"dp2ErisMw":125.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397073,"projectNumber":"J1624","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2024-08-04T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Bartholomew","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Columbus Denois Cr - Columbus 345 230 kV Transmission Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397074,"projectNumber":"J1626","queueDate":"2020-06-23T04:00:00+00:00","inService":"2024-08-05T04:00:00+00:00","negInService":"2027-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Ramsey East 138kV bus","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397075,"projectNumber":"J1609","queueDate":"2020-06-20T04:00:00+00:00","withdrawnDate":"2022-01-06T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"CONSUMERS ENERGY COMPANY","county":"St. Joseph","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Simpson 138kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397076,"projectNumber":"J1612","queueDate":"2020-06-08T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2022-10-14T04:00:00+00:00","negInService":"2028-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"El Dorado East - Sterlington 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397077,"projectNumber":"J1629","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-07-18T04:00:00+00:00","negInService":"2027-07-18T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Columbia SW YD(ALTE) - South Fond Du Lac  SW YD 345 KV T-Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397078,"projectNumber":"J1633","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Cooper Switching - Penton Road 230 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397079,"projectNumber":"J1636","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Pike","state":"MO","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Peno Creek Substation 161kV","summerNetMW":44.0,"winterNetMW":44.0,"dp1ErisMw":44.0,"dp1NrisMw":44.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397080,"projectNumber":"J1640","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-09-22T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Beech Grove - Ray Braswell 115 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397081,"projectNumber":"J1642","queueDate":"2022-02-17T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Spencer","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"North East (Castle) - Culley 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397082,"projectNumber":"J1647","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-19T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chippewa","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Maynard XMSN 115kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397083,"projectNumber":"J1728","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Story County Substation 161kV","summerNetMW":39.0,"winterNetMW":39.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397084,"projectNumber":"J1729","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hancock","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Lime Creek 161kV","summerNetMW":43.0,"winterNetMW":43.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397085,"projectNumber":"J1614","queueDate":"2020-06-11T04:00:00+00:00","inService":"2024-02-15T05:00:00+00:00","giaToExec":"2022-12-12T05:00:00+00:00","negInService":"2025-08-26T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"White Road - Four Mile 138kV line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397086,"projectNumber":"J1621","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"McPherson","state":"SD","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Big Stone South to Ellendale 345kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397087,"projectNumber":"J1600","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2022-10-31T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Meade","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Flaherty Tap to Custer 69kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397088,"projectNumber":"J1601","queueDate":"2020-06-09T04:00:00+00:00","withdrawnDate":"2021-03-15T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Marion","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Merom - Gibson Station Tap 345 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397089,"projectNumber":"J1602","queueDate":"2021-11-02T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","negInService":"2024-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ouachita","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Rilla 115kV substation (Same as J1239)","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":25.0,"dp2NrisMw":25.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397090,"projectNumber":"J1603","queueDate":"2021-12-03T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-08-02T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Vantyle 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397091,"projectNumber":"J1604","queueDate":"2020-07-10T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","negInService":"2026-08-31T04:00:00+00:00","transmissionOwner":"HENDERSON UTILITY COMM DBA HENDERSON MUNICIPAL POWER AND LIGHT","county":"Henderson","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"HMPL Sub No.7","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397092,"projectNumber":"J1608","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-24T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ingham","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Tihart to Lovejoy Junction  138kv","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397093,"projectNumber":"J1628","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2022-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Goodland to Reynolds 138KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397094,"projectNumber":"J1632","queueDate":"2020-06-22T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Caldwell","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Caldwell County -  Barkley 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397095,"projectNumber":"J1622","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2022-12-13T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Sheridan","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Harvey-Underwood 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397096,"projectNumber":"J1623","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Orange","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Mitchell Lost River 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397097,"projectNumber":"J1625","queueDate":"2021-08-20T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2024-08-05T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tipton","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kokomo - Tipton 230kV Transmission line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397098,"projectNumber":"J1631","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-11-24T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Clark","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Stonelake  to Gardner Park 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397099,"projectNumber":"J1635","queueDate":"2020-06-24T04:00:00+00:00","inService":"2022-02-01T05:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-02-01T05:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"BUTTERS - NEWTON (MI AVE) 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397100,"projectNumber":"J1639","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2022-01-06T05:00:00+00:00","inService":"2022-02-01T05:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"345kV Allen Junction to Morocco","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397101,"projectNumber":"J1644","queueDate":"2020-06-10T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2024-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Landry","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Champange - Plaisance","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397102,"projectNumber":"J1645","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-23T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Renville","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Panther 230kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397103,"projectNumber":"J1648","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-14T05:00:00+00:00","inService":"2021-08-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Searcy","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Searcy Price 161kV","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397104,"projectNumber":"J1658","queueDate":"2025-05-19T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2022-12-14T05:00:00+00:00","negInService":"2025-12-12T05:00:00+00:00","transmissionOwner":"METC","county":"Hillsdale","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"COLDWATER - MOORE ROAD 138.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397105,"projectNumber":"J1646","queueDate":"2020-06-10T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","negInService":"2026-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"MORRISON DITCH","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397106,"projectNumber":"J1653","queueDate":"2021-12-03T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"San Jose Rail 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397107,"projectNumber":"J1654","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2023-02-22T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Goss-Thetford 345kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397108,"projectNumber":"J1655","queueDate":"2021-12-03T05:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2022-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jefferson","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"West Mt Vernon - Xenia 345kV Line (J1241)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397109,"projectNumber":"J1649","queueDate":"2021-03-10T05:00:00+00:00","inService":"2022-10-31T04:00:00+00:00","negInService":"2025-10-31T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"McCracken","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Shell - McCracken County 69.0kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397110,"projectNumber":"J1650","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Latham 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397111,"projectNumber":"J1656","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2025-03-19T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sydney to Bunsonville 345kV Line","summerNetMW":412.0,"winterNetMW":412.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397112,"projectNumber":"J1657","queueDate":"2020-06-25T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"St. Croix","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Pine Lake to Apple River 161 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397113,"projectNumber":"J1662","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2023-10-17T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Goodland Substation 138kV (Bus Name: 17Goodland)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397114,"projectNumber":"J1664","queueDate":"2020-06-24T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Carrigan 120kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397115,"projectNumber":"J1659","queueDate":"2020-06-25T04:00:00+00:00","inService":"2022-02-01T05:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-02-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"DORSET","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397116,"projectNumber":"J1660","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2022-01-05T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Goss-Thetford 345kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397117,"projectNumber":"J1651","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","negInService":"2028-02-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Howlett","summerNetMW":149.5,"winterNetMW":149.5,"dp1ErisMw":105.0,"dp1NrisMw":105.0,"dp2ErisMw":105.0,"dp2NrisMw":31.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397118,"projectNumber":"J1652","queueDate":"2021-12-03T05:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Sidney 138kV","summerNetMW":116.0,"winterNetMW":116.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397119,"projectNumber":"J1665","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2022-01-05T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Carrigan 120kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397120,"projectNumber":"J1670","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","giaToExec":"2022-08-08T04:00:00+00:00","negInService":"2025-03-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crooked Lake 161kV at J586 POI","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397121,"projectNumber":"J1666","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2022-01-06T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Ingham","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Oneida - Majestic 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397122,"projectNumber":"J1671","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","giaToExec":"2022-12-15T05:00:00+00:00","negInService":"2025-12-04T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Walker","state":"TX","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Rocky Creek to Lewis Creek 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397123,"projectNumber":"J1674","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-21T05:00:00+00:00","inService":"2023-08-02T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Tammany","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Talisheek - North Slidell 230kV Line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397124,"projectNumber":"J1684","queueDate":"2023-08-04T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","negInService":"2029-04-17T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Starke","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"SCHAHFER GEN STA - BURR OAK 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397125,"projectNumber":"J1676","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Brokaw - Clinton 345 kV line","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397126,"projectNumber":"J1678","queueDate":"2022-04-06T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Deedsville 345 kV","summerNetMW":74.7,"winterNetMW":74.7,"dp1ErisMw":74.7,"dp1NrisMw":74.7,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397127,"projectNumber":"J1682","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Boone","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hortonville to Whitestown 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397128,"projectNumber":"J1683","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-14T05:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Porter","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Babcock - Lake George 345 kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397129,"projectNumber":"J1627","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2022-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397130,"projectNumber":"J1630","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Gerald Andrus-Tinnin Road 230 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397131,"projectNumber":"J1945","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Werner West - Rocky Run 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397132,"projectNumber":"J1946","queueDate":"2021-08-19T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","negInService":"2029-06-15T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SME","county":"Jasper","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"230 kV Missionary Substation","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":350.0,"dp2ErisMw":350.0,"dp2NrisMw":350.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397133,"projectNumber":"J1634","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"COOPER SWITCHING - PENTON ROAD 230 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397134,"projectNumber":"J1637","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Wheatland Substation 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397135,"projectNumber":"J1638","queueDate":"2022-02-11T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Hancock","state":"KY","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Skillman Substation 161kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397136,"projectNumber":"J1641","queueDate":"2024-03-15T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Worthington Substation 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397137,"projectNumber":"J1685","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-09-24T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ascension","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Donaldsonville to Evergreen 230kV line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397138,"projectNumber":"J1686","queueDate":"2022-07-07T04:00:00+00:00","inService":"2023-09-04T04:00:00+00:00","giaToExec":"2023-06-27T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Coughlin - Plaisance 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":70.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397139,"projectNumber":"J1643","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-11-30T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Delaney 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397140,"projectNumber":"J1661","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-02-23T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Lapeer","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Imlay Pump 120kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397141,"projectNumber":"J1663","queueDate":"2021-12-03T05:00:00+00:00","doneDate":"2023-03-07T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2025-08-02T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"ARGENTA - TALLMADGE 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397142,"projectNumber":"J1667","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-12-21T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Bard Rd to Clare Junction 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397143,"projectNumber":"J1687","queueDate":"2021-12-03T05:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Decatur","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Decatur Switching Station 161kv","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397144,"projectNumber":"J1944","queueDate":"2021-08-23T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2027-11-08T05:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"GREENWOOD - RAPSON (BANNER) 345.0kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":185.0,"dp1NrisMw":185.0,"dp2ErisMw":185.0,"dp2NrisMw":185.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397145,"projectNumber":"J1672","queueDate":"2020-06-23T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","negInService":"2025-11-16T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Tinnin Road 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397146,"projectNumber":"J1675","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2021-02-13T05:00:00+00:00","inService":"2023-12-15T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Edgar","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kansas 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397147,"projectNumber":"J1677","queueDate":"2020-06-24T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","negInService":"2026-01-29T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Leghorn 345 kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397148,"projectNumber":"J1679","queueDate":"2020-06-24T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","negInService":"2026-04-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"7XENIA    - 7MTVERNW 345.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397149,"projectNumber":"J1680","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Cass","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"345 kV Walton Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397150,"projectNumber":"J1681","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Maries","state":"MO","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Bland to Franks 345kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397151,"projectNumber":"J1948","queueDate":"2022-03-23T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Marion","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HANNIBAL WEST","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":195.0,"dp1NrisMw":195.0,"dp2ErisMw":195.0,"dp2NrisMw":195.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397152,"projectNumber":"J1949","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Antrim","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Mancelona - Westwood 69kV","summerNetMW":99.6,"winterNetMW":99.6,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397153,"projectNumber":"J1951","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Lemoyne-Majestic 345kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397154,"projectNumber":"J1953","queueDate":"2022-07-20T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Red Gum 115kV","summerNetMW":264.6,"winterNetMW":264.6,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397155,"projectNumber":"J1960","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Porter","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Starke - Flint Lake 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397156,"projectNumber":"J1961","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Cass","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Buffalo 115kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":190.0,"dp1NrisMw":57.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397157,"projectNumber":"J1668","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Donaldsonville - Evergreen 230 kV","summerNetMW":194.0,"winterNetMW":194.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397158,"projectNumber":"J1669","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","giaToExec":"2022-11-28T05:00:00+00:00","negInService":"2025-12-04T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"LAKE CHARLES BULK","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":165.0,"dp1NrisMw":0.0,"dp2ErisMw":165.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397159,"projectNumber":"J1947","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397160,"projectNumber":"J1959","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. John the Baptist","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Waterford-Vacherie 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397161,"projectNumber":"J1673","queueDate":"2020-06-23T04:00:00+00:00","inService":"2024-01-15T05:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2025-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Fisher - Marthaville 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":100.0,"dp2ErisMw":200.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397162,"projectNumber":"J1952","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Emery-Floyd 161kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":54.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397163,"projectNumber":"J1954","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"SW Delavan 138kV","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397164,"projectNumber":"J1955","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"SW Delavan 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397165,"projectNumber":"J1957","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Coahoma","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Clarksdale-Roundaway 115kV (co-located with J2284)","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397166,"projectNumber":"J1958","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. John the Baptist","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Waterford 230kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397167,"projectNumber":"J1964","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"N Madison - Columbia","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397168,"projectNumber":"J1965","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7MCCREDIE - 7MONTGMRY 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397169,"projectNumber":"J1962","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Polk","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Livingston - Rich 138kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397170,"projectNumber":"J1963","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Polk","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Livingston - Rich 138kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397171,"projectNumber":"J1956","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. John the Baptist","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Waterford 230kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397172,"projectNumber":"J1966","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"WABASH VALLEY POWER ASSOCIATION, INC.","county":"Clinton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cayuga  -  Frankfort  230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397173,"projectNumber":"J1969","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Lemoyne-Majestic 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397174,"projectNumber":"J1970","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4SIDNEY 1 - 4MIRA TAP 138.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397175,"projectNumber":"J1972","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Des Moines","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Denmark - Newport","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":115.0,"dp1NrisMw":115.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397176,"projectNumber":"J1982","queueDate":"2021-11-30T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gladwin","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other_","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":25.0,"dp2NrisMw":25.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397177,"projectNumber":"J1732","queueDate":"2020-06-24T04:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","negInService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"ACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV","summerNetMW":98.4,"winterNetMW":98.4,"dp1ErisMw":98.4,"dp1NrisMw":98.4,"dp2ErisMw":98.4,"dp2NrisMw":98.4,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397178,"projectNumber":"J1733","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Allamakee","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Lansing 161 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397179,"projectNumber":"J1988","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Coahoma","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Roundaway Cepa 115kV","summerNetMW":120.96,"winterNetMW":120.96,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397180,"projectNumber":"J1831","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","negInService":"2026-08-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Menard","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Shockey 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":175.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397181,"projectNumber":"J1991","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Genpower Keo 500kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397182,"projectNumber":"J1833","queueDate":"2021-10-19T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","giaToExec":"2023-01-19T05:00:00+00:00","negInService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lafourche","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Leeville 115kV","summerNetMW":115.1,"winterNetMW":115.1,"dp1ErisMw":115.1,"dp1NrisMw":115.1,"dp2ErisMw":115.1,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397183,"projectNumber":"J1737","queueDate":"2021-10-22T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Rush","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gwynville 345 kV","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397184,"projectNumber":"J1836","queueDate":"2020-06-23T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","negInService":"2027-12-30T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Montgomery- Callaway- 7","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":275.0,"dp2NrisMw":275.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397185,"projectNumber":"J1967","queueDate":"2022-03-24T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rantoul East 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":45.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397186,"projectNumber":"J1989","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Brown","state":"SD","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale 345 - Twin Brooks 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397187,"projectNumber":"J1971","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cardinal","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397188,"projectNumber":"J1973","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4SIDNEY 1 - 4MIRA TAP 138.0kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397189,"projectNumber":"J1990","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Stutsman","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":215.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397190,"projectNumber":"J1735","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2023-06-22T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"J1304 POI 138 kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397191,"projectNumber":"J1832","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","giaToExec":"2022-08-10T04:00:00+00:00","negInService":"2024-07-15T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Plaisance 138kV","summerNetMW":145.09,"winterNetMW":145.09,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":145.0,"dp2NrisMw":90.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3397192,"projectNumber":"J1834","queueDate":"2021-12-16T05:00:00+00:00","inService":"2025-04-25T04:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2025-05-25T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Orange","state":"TX","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Sabine 138/230 kV Substation","summerNetMW":66.7,"winterNetMW":126.0,"dp1ErisMw":126.0,"dp1NrisMw":66.7,"dp2ErisMw":126.0,"dp2NrisMw":66.7,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397193,"projectNumber":"J1739","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-02-23T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Sand Lake 138kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397194,"projectNumber":"J1838","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-02-23T05:00:00+00:00","inService":"2025-02-12T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Christiana 138 kV","summerNetMW":320.0,"winterNetMW":320.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397195,"projectNumber":"J1742","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-14T05:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Porter","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Babcock - Lake George 345 kV","summerNetMW":294.1,"winterNetMW":294.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397196,"projectNumber":"J1840","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-08-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"De Witt","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Clinton to Goose Creek-4545 345kV line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397197,"projectNumber":"J1743","queueDate":"2022-04-06T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Deedsville 345 kV Substation","summerNetMW":292.9,"winterNetMW":292.9,"dp1ErisMw":292.89,"dp1NrisMw":292.89,"dp2ErisMw":292.89,"dp2NrisMw":292.89,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397198,"projectNumber":"J1744","queueDate":"2022-04-05T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","negInService":"2027-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Hutsonville - Neoga 138 kV","summerNetMW":149.5,"winterNetMW":149.5,"dp1ErisMw":149.5,"dp1NrisMw":149.5,"dp2ErisMw":149.5,"dp2NrisMw":149.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397199,"projectNumber":"J1974","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mattoon West","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397200,"projectNumber":"J1979","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Howard","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hazleton-Mitchell County 345kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":60.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397201,"projectNumber":"J1842","queueDate":"2021-10-19T04:00:00+00:00","inService":"2026-02-02T05:00:00+00:00","giaToExec":"2022-11-17T05:00:00+00:00","negInService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"FORREST CITY N SS - WYNNE SOUTH 161.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":0.0,"dp2ErisMw":135.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397202,"projectNumber":"J1745","queueDate":"2020-06-23T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","negInService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Winnebago","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Fitzgerald 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397203,"projectNumber":"J1980","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Kent","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Vergennes 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397204,"projectNumber":"J1731","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-03-12T05:00:00+00:00","inService":"2022-02-01T05:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Madison","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Noblesville to Fall Creek 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397205,"projectNumber":"J1844","queueDate":"2020-12-31T05:00:00+00:00","inService":"2024-10-07T04:00:00+00:00","negInService":"2029-02-06T05:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"19CVTRY","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397206,"projectNumber":"J1851","queueDate":"2021-11-30T05:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","negInService":"2026-11-15T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"CROSSETT NORTH - BEEKMAN 115.0kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":195.0,"dp1NrisMw":80.0,"dp2ErisMw":185.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397207,"projectNumber":"J1750","queueDate":"2022-04-06T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marquette","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Other_","summerNetMW":149.7,"winterNetMW":149.7,"dp1ErisMw":149.7,"dp1NrisMw":149.7,"dp2ErisMw":149.7,"dp2NrisMw":149.7,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397208,"projectNumber":"J1855","queueDate":"2021-11-17T05:00:00+00:00","inService":"2026-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"MALLORY 161","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":500.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397209,"projectNumber":"J1983","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"N. Madison 69kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":25.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397210,"projectNumber":"J1985","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Chicken Farm - Amite","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397211,"projectNumber":"J1986","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"St. Charles","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Montgomery 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397212,"projectNumber":"J1734","queueDate":"2020-06-24T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","negInService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Lee","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Burlington Generation - Wever 161kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"In Service (with Provisional GIA)"},{"id":3397213,"projectNumber":"J1975","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mattoon West","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397214,"projectNumber":"J1976","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Porter","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Starke - Flint Lake 138kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397215,"projectNumber":"J1978","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pocahontas","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Lemars Tap-Little Sioux 161kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":170.0,"dp1NrisMw":52.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397216,"projectNumber":"J1984","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2026-01-27T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Tallmadge 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397217,"projectNumber":"J1736","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Dubois","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Duff 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397218,"projectNumber":"J1738","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-02T05:00:00+00:00","inService":"2023-05-15T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"McPherson","state":"SD","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Leola Substation 41.6kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397219,"projectNumber":"J1835","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Spencer","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Culley to Grandview 138 KV line tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397220,"projectNumber":"J1741","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-03T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Cass","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Walton 345kV  Substation","summerNetMW":270.0,"winterNetMW":270.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397221,"projectNumber":"J1841","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Forrest City to Wynne S 161 KV Line","summerNetMW":52.0,"winterNetMW":52.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397222,"projectNumber":"J1746","queueDate":"2020-06-24T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","negInService":"2028-06-12T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Columbia 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397223,"projectNumber":"J1847","queueDate":"2021-08-09T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Mower","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Murphy Creek 161kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397224,"projectNumber":"J1848","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2023-08-15T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Van Buren","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS-Only","poiName":"Covert","summerNetMW":1128.0,"winterNetMW":1235.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397225,"projectNumber":"J1740","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"University to Mukwanago 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397226,"projectNumber":"J1837","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-03-12T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Pana - Route 51 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397227,"projectNumber":"J1849","queueDate":"2021-11-30T05:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","negInService":"2028-05-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cypress 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397228,"projectNumber":"J1852","queueDate":"2022-06-16T04:00:00+00:00","withdrawnDate":"2023-10-09T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bison 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397229,"projectNumber":"J1853","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2023-10-09T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Des Moines","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Denmark - Newport","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397230,"projectNumber":"J1856","queueDate":"2021-11-17T05:00:00+00:00","inService":"2026-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"SHOFFNER - NEWPORT","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":147.0,"dp1NrisMw":147.0,"dp2ErisMw":140.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397231,"projectNumber":"J1846","queueDate":"2021-07-22T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Renville","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PANTHER","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397232,"projectNumber":"J1850","queueDate":"2021-11-24T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Martin","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Kirk - Cecelia 138kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397233,"projectNumber":"J1857","queueDate":"2021-11-17T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2026-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"EBONY SS -  5WM LEHI-W","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397234,"projectNumber":"J1863","queueDate":"2021-08-16T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","negInService":"2026-06-12T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Vantyle 138kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397235,"projectNumber":"J1867","queueDate":"2021-11-22T05:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Quinn","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397236,"projectNumber":"J1755","queueDate":"2020-06-25T04:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","negInService":"2025-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Bureau","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Bureau County 138 kV","summerNetMW":147.2,"winterNetMW":147.2,"dp1ErisMw":147.19,"dp1NrisMw":147.19,"dp2ErisMw":147.19,"dp2NrisMw":147.19,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397237,"projectNumber":"J1749","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2022-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"West Baton Rouge","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Addis - Big Cajun 230kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397238,"projectNumber":"J1751","queueDate":"2022-04-06T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","negInService":"2026-05-02T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Wood","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Saratoga - Badger West 138.0kV","summerNetMW":150.5,"winterNetMW":150.5,"dp1ErisMw":150.5,"dp1NrisMw":150.5,"dp2ErisMw":150.5,"dp2NrisMw":150.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397239,"projectNumber":"J1753","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-12-01T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Green","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Columbia-South Fond du Lac 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397240,"projectNumber":"J1860","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-03-03T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Morocco to Beecher 138kV (8.36 miles from Morocco)","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397241,"projectNumber":"J1861","queueDate":"2022-03-28T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STILLWELL - L.N.G. PLANT 138.0kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":45.0,"dp1NrisMw":45.0,"dp2ErisMw":45.0,"dp2NrisMw":45.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397242,"projectNumber":"J1754","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2022-12-12T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"McHenry","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"McHenry ND","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397243,"projectNumber":"J1839","queueDate":"2020-06-25T04:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","negInService":"2026-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macon","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Decatur ADM North 138 kV","summerNetMW":325.0,"winterNetMW":340.3,"dp1ErisMw":340.3,"dp1NrisMw":340.3,"dp2ErisMw":340.3,"dp2NrisMw":340.3,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397244,"projectNumber":"J1843","queueDate":"2022-01-06T05:00:00+00:00","withdrawnDate":"2023-06-22T04:00:00+00:00","inService":"2023-03-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Christiana 138 kV","summerNetMW":12.0,"winterNetMW":12.0,"dp1ErisMw":12.0,"dp1NrisMw":12.0,"dp2ErisMw":12.0,"dp2NrisMw":12.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397245,"projectNumber":"J1866","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2023-10-09T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Clark","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"T Corners 115kV Sub","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397246,"projectNumber":"J1868","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Winn","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Winnfield to Standard 115kV","summerNetMW":260.0,"winterNetMW":260.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397247,"projectNumber":"J1845","queueDate":"2020-12-31T05:00:00+00:00","inService":"2025-10-06T04:00:00+00:00","negInService":"2028-08-29T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"18BATTLC","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397248,"projectNumber":"J1747","queueDate":"2020-06-23T04:00:00+00:00","inService":"2022-02-28T05:00:00+00:00","giaToExec":"2022-12-02T05:00:00+00:00","negInService":"2024-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"J830 POI","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397249,"projectNumber":"J1858","queueDate":"2021-11-30T05:00:00+00:00","inService":"2026-04-15T04:00:00+00:00","negInService":"2028-03-20T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Sandy Bayou","summerNetMW":440.0,"winterNetMW":440.0,"dp1ErisMw":440.0,"dp1NrisMw":440.0,"dp2ErisMw":440.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397250,"projectNumber":"J1759","queueDate":"2020-06-23T04:00:00+00:00","inService":"2024-01-15T05:00:00+00:00","giaToExec":"2023-08-04T04:00:00+00:00","negInService":"2025-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Fisher to Mansfield Compressor 230 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397251,"projectNumber":"J1752","queueDate":"2022-05-06T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","negInService":"2026-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Golden Sands - Arnott (O-119)","summerNetMW":148.1,"winterNetMW":148.1,"dp1ErisMw":148.1,"dp1NrisMw":148.1,"dp2ErisMw":148.1,"dp2NrisMw":148.1,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397252,"projectNumber":"J1862","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-03-03T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Clinton","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Bingham West 138kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":45.0,"dp1NrisMw":45.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397253,"projectNumber":"J1760","queueDate":"2020-06-15T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Timberland 230kV","summerNetMW":205.0,"winterNetMW":205.0,"dp1ErisMw":215.0,"dp1NrisMw":60.0,"dp2ErisMw":205.0,"dp2NrisMw":60.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397254,"projectNumber":"J1885","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REID EHV 345 KV SUBSTATION","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397255,"projectNumber":"J1765","queueDate":"2020-06-11T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tipton","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Tipton West Substation 230kV","summerNetMW":93.2,"winterNetMW":93.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397256,"projectNumber":"J1895","queueDate":"2023-10-03T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Balsam","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397257,"projectNumber":"J1897","queueDate":"2021-12-14T05:00:00+00:00","inService":"2024-08-15T04:00:00+00:00","negInService":"2027-10-22T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"DELL EHV - SAN SOUCI 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":500.0,"dp2NrisMw":425.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397258,"projectNumber":"J1903","queueDate":"2021-08-03T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Osceola","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"Osceola (43.431167, -95.416667)","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397259,"projectNumber":"J1757","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-14T05:00:00+00:00","inService":"2023-04-20T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kansas - Faraday 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397260,"projectNumber":"J1872","queueDate":"2021-08-16T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","negInService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"El Dorado 500kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397261,"projectNumber":"J1756","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-03-31T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Shelby","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gwynneville to Sunnyside 345kV","summerNetMW":309.0,"winterNetMW":309.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397262,"projectNumber":"J1871","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Independence Substation 230kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397263,"projectNumber":"J1875","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"El Dorado 500kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397264,"projectNumber":"J1876","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Decatur","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greensburg","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397265,"projectNumber":"J1761","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Barnes","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"E-NRIS","poiName":"Maple River 230kV","summerNetMW":39.0,"winterNetMW":39.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397266,"projectNumber":"J1763","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-21T05:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Cavalier","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Langdon Substation 115kV","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397267,"projectNumber":"J1884","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Columbia 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397268,"projectNumber":"J1886","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2022-11-22T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REID EHV 345 KV SUBSTATION","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397269,"projectNumber":"J1904","queueDate":"2021-08-17T04:00:00+00:00","inService":"2025-11-08T05:00:00+00:00","negInService":"2028-11-08T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Richard 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397270,"projectNumber":"J1905","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Banner-Rapson 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397271,"projectNumber":"J1910","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Gallagher-Tittabawassee 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397272,"projectNumber":"J1911","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Madrid - Blackfoot 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397273,"projectNumber":"J1758","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Barnes","state":"ND","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Pillsburry Substation  230kV","summerNetMW":42.0,"winterNetMW":42.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397274,"projectNumber":"J1874","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"El Dorado 500kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397275,"projectNumber":"J1888","queueDate":"2022-01-25T05:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-04-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Oliver","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Square Butte 230 kV Substation East","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397276,"projectNumber":"J1889","queueDate":"2021-08-04T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mount Vernon","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397277,"projectNumber":"J1890","queueDate":"2025-04-17T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2027-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"HARTBURG - AEP LAYFIELD 500.0kV","summerNetMW":270.0,"winterNetMW":270.0,"dp1ErisMw":270.0,"dp1NrisMw":270.0,"dp2ErisMw":270.0,"dp2NrisMw":270.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397278,"projectNumber":"J1891","queueDate":"2021-08-19T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Attala","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"230 kV McAdams Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397279,"projectNumber":"J1768","queueDate":"2020-06-16T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Orange","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Lost River Substation  345","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397280,"projectNumber":"J1898","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Byron 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397281,"projectNumber":"J1771","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-03-15T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Casey - Sullivan 345 kV","summerNetMW":197.3,"winterNetMW":197.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397282,"projectNumber":"J1772","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","negInService":"2026-03-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397283,"projectNumber":"J1869","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Winn","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Winnfield to Standard 115kV","summerNetMW":78.0,"winterNetMW":78.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397284,"projectNumber":"J1870","queueDate":"2021-08-16T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","negInService":"2028-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Independence Substation 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":180.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397285,"projectNumber":"J1873","queueDate":"2021-08-16T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","negInService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"El Dorado 500kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397286,"projectNumber":"J1880","queueDate":"2021-08-16T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","negInService":"2027-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Argenta to Tallmadge 345kV (33 miles from Argenta)","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":60.0,"dp1NrisMw":60.0,"dp2ErisMw":60.0,"dp2NrisMw":60.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397287,"projectNumber":"J1882","queueDate":"2022-03-28T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"San Jose Rail 138kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":45.0,"dp1NrisMw":45.0,"dp2ErisMw":45.0,"dp2NrisMw":45.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397288,"projectNumber":"J1762","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-02-19T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Iron","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Crystal Falls - Aspen 69 kV","summerNetMW":22.5,"winterNetMW":22.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397289,"projectNumber":"J1883","queueDate":"2021-07-21T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2023-06-10T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ouachita","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS-Only","poiName":"Rilla 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397290,"projectNumber":"J1764","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2020-12-01T05:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"WABASH VALLEY POWER ASSOCIATION, INC.","county":"Perry","state":"MO","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Seminary/Perryville 138kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397291,"projectNumber":"J1766","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-10-15T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Fallon","state":"MT","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Keystone XL (Pumping station - 14) - 115kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397292,"projectNumber":"J1894","queueDate":"2021-10-29T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2029-02-08T05:00:00+00:00","transmissionOwner":"METC","county":"Kalamazoo","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Jaguar 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397293,"projectNumber":"J1769","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Howard","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Beaver Creek to Rice 161 kV line tap (same POI as J898)","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":80.0,"dp1NrisMw":0.0,"dp2ErisMw":80.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397294,"projectNumber":"J1900","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2028-10-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Brownstown 12  120kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397295,"projectNumber":"J1877","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Decatur","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greensburg 138kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397296,"projectNumber":"J1893","queueDate":"2021-11-01T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-04-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Morton","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mandan 230 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397297,"projectNumber":"J1906","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"BOGALUSA","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397298,"projectNumber":"J1779","queueDate":"2021-09-01T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-27T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Rockdale","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397299,"projectNumber":"J1922","queueDate":"2021-08-19T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cottage Grove-Karn 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397300,"projectNumber":"J1925","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Livingston","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Tihart-Latson 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397301,"projectNumber":"J1767","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hancock","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Burt to Emery  161kV","summerNetMW":37.0,"winterNetMW":37.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397302,"projectNumber":"J1899","queueDate":"2021-12-22T05:00:00+00:00","inService":"2024-08-15T04:00:00+00:00","negInService":"2027-10-22T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"DELL EHV - SAN SOUCI 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":500.0,"dp2NrisMw":425.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397303,"projectNumber":"J1770","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Hoopston 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397304,"projectNumber":"J1901","queueDate":"2022-03-25T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Webster","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"South Henderson","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397305,"projectNumber":"J1784","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"New Castle to Hagerstown 69 kV","summerNetMW":39.0,"winterNetMW":39.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397306,"projectNumber":"J1785","queueDate":"2022-01-11T05:00:00+00:00","withdrawnDate":"2026-01-09T05:00:00+00:00","inService":"2024-07-12T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Maple 69 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":90.0,"dp2NrisMw":90.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397307,"projectNumber":"J1929","queueDate":"2021-08-24T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","negInService":"2028-09-25T04:00:00+00:00","transmissionOwner":"METC","county":"Cheboygan","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other_","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":110.0,"dp2NrisMw":110.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397308,"projectNumber":"J1786","queueDate":"2020-06-24T04:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Gibson Sta - Merom (HED) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397309,"projectNumber":"J1902","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","negInService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"IRONTON","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397310,"projectNumber":"J1907","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Newton","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397311,"projectNumber":"J1773","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2027-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Lafayette","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Hill Valley to Cardinal 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397312,"projectNumber":"J1775","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-11-11T05:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Calumet","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Forest Junction Substation 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397313,"projectNumber":"J1915","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Almeda Junction-Shale 138kV Transmission Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397314,"projectNumber":"J1780","queueDate":"2020-06-23T04:00:00+00:00","inService":"2023-08-15T04:00:00+00:00","negInService":"2026-08-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397315,"projectNumber":"J1921","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Montcalm","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Deja- Derby Jct 138kV Transmission line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397316,"projectNumber":"J1927","queueDate":"2021-12-03T05:00:00+00:00","inService":"2027-08-01T04:00:00+00:00","negInService":"2027-04-01T04:00:00+00:00","transmissionOwner":"MUSCATINE POWER AND WATER","county":"Muscatine","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Grandview Substation 69 kV","summerNetMW":23.4,"winterNetMW":23.4,"dp1ErisMw":24.0,"dp1NrisMw":24.0,"dp2ErisMw":24.0,"dp2NrisMw":24.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397317,"projectNumber":"J1774","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2023-07-20T04:00:00+00:00","inService":"2023-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Warren","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Cayuga 345kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397318,"projectNumber":"J1908","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cocodrie","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397319,"projectNumber":"J1909","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Gallagher-Tittabawassee 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397320,"projectNumber":"J1912","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Greenwood-Rapson 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397321,"projectNumber":"J1913","queueDate":"2021-08-19T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Murphy-Tittabawassee 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397322,"projectNumber":"J1777","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","negInService":"2026-12-31T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Aster 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397323,"projectNumber":"J1776","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Osceola","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Dickinson County Switch Yard 161kV","summerNetMW":34.0,"winterNetMW":34.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397324,"projectNumber":"J1918","queueDate":"2021-08-24T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2026-01-09T05:00:00+00:00","transmissionOwner":"METC","county":"Montcalm","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"KENOWA - NELSON ROAD 345.0kV","summerNetMW":132.0,"winterNetMW":132.0,"dp1ErisMw":132.0,"dp1NrisMw":132.0,"dp2ErisMw":132.0,"dp2NrisMw":132.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"LEGACY: Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3397325,"projectNumber":"J1781","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2027-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Iowa","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Hill Valley 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":300.0,"dp2NrisMw":300.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397326,"projectNumber":"J1923","queueDate":"2021-08-19T04:00:00+00:00","withdrawnDate":"2021-12-22T05:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rapson 120 kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397327,"projectNumber":"J1924","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cottage Grove-Seven Mile 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397328,"projectNumber":"J1926","queueDate":"2022-03-23T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mackinaw","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":60.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397329,"projectNumber":"J1930","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"N Madison - Columbia","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397330,"projectNumber":"J1936","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Werner West - Rocky Run 345kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397331,"projectNumber":"J1937","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Werner West - Rocky Run 345kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397332,"projectNumber":"J1942","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Seville TP-Niles TP 120 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397333,"projectNumber":"J1787","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-09-22T04:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Beech Grove - Ray Braswell 115 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397334,"projectNumber":"J1931","queueDate":"2021-11-30T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","negInService":"2027-07-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Iowa","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Hill Valley 345kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":12.0,"dp2ErisMw":40.0,"dp2NrisMw":12.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397335,"projectNumber":"J1934","queueDate":"2021-08-24T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","negInService":"2028-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Lakeview 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397336,"projectNumber":"J1935","queueDate":"2021-11-29T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"N. Madison 69kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397337,"projectNumber":"J1790","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2023-02-16T05:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","giaToExec":"2022-11-28T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ashley","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Crossett - Monticello East 115 kV Line","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397338,"projectNumber":"J1939","queueDate":"2023-10-18T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2027-12-11T05:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"CORNELL - LAYTON 138.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397339,"projectNumber":"J1940","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Monroe-Lallendorf 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397340,"projectNumber":"J1794","queueDate":"2020-06-22T04:00:00+00:00","doneDate":"2022-11-18T05:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","giaToExec":"2022-11-18T05:00:00+00:00","negInService":"2025-05-26T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"RICHARD - SCOTT 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397341,"projectNumber":"J1914","queueDate":"2023-10-05T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2026-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Presque Isle","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"PORT CALCITE - ROCKPORT 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397342,"projectNumber":"J1778","queueDate":"2020-06-22T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-03-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Paris 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":50.0,"dp2ErisMw":100.0,"dp2NrisMw":50.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397343,"projectNumber":"J1798","queueDate":"2020-06-24T04:00:00+00:00","inService":"2021-06-01T04:00:00+00:00","giaToExec":"2023-03-08T05:00:00+00:00","negInService":"2023-03-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ITC)","studyPhase":"GIA","svcType":"ERIS","poiName":"Waterman 120kV","summerNetMW":0.0,"winterNetMW":25.0,"dp1ErisMw":25.0,"dp1NrisMw":0.0,"dp2ErisMw":25.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397344,"projectNumber":"J1803","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2023-02-28T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Houghton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Winona-Atlantic 69 kV","summerNetMW":1.6,"winterNetMW":1.6,"dp1ErisMw":1.6,"dp1NrisMw":1.6,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397345,"projectNumber":"J1788","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-09-24T04:00:00+00:00","inService":"2023-02-28T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Mary","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Caneland 230 kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397346,"projectNumber":"J1791","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Gerald Andrus-Tinnin Road 230 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397347,"projectNumber":"J1916","queueDate":"2023-10-19T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2026-03-06T05:00:00+00:00","transmissionOwner":"Michigan Electric Transmission Company LLC","county":"Branch","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"NEWTON","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397348,"projectNumber":"J1917","queueDate":"2021-08-19T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","negInService":"2028-01-14T05:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"MADRID - MAJESTIC 345.0kV","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":165.0,"dp1NrisMw":165.0,"dp2ErisMw":148.5,"dp2NrisMw":148.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397349,"projectNumber":"J1920","queueDate":"2021-08-22T04:00:00+00:00","withdrawnDate":"2023-09-06T04:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Leelanau","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Tuscola-Arrowhead 120kV Transmission Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397350,"projectNumber":"J1782","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2026-08-10T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"WABASH RIVER GEN. STA. TO WHITESVILLE SOUTH SUB 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397351,"projectNumber":"J1783","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2026-08-10T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"WABASH RIVER GEN. STA. TO WHITESVILLE SOUTH SUB 230 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397352,"projectNumber":"J1932","queueDate":"2021-08-24T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gladwin","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397353,"projectNumber":"J1815","queueDate":"2022-03-16T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Linden Junction - Crawfordsville 138 kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":130.0,"dp1NrisMw":130.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397354,"projectNumber":"J1817","queueDate":"2020-07-28T04:00:00+00:00","withdrawnDate":"2023-02-28T05:00:00+00:00","inService":"2021-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Houghton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"ATC WInona-Atlantic Minw 69 kV tap (J1244)","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397355,"projectNumber":"J1933","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Bastrop Tap 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397356,"projectNumber":"J1789","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2021-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Brinkley East to Clarendon 115 kV","summerNetMW":5.99,"winterNetMW":5.99,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397357,"projectNumber":"J1943","queueDate":"2021-08-23T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Columbia - North Madison 345/138 kV 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397358,"projectNumber":"J1797","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. John the Baptist","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Waterford 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397359,"projectNumber":"J1804","queueDate":"2022-02-28T05:00:00+00:00","withdrawnDate":"2023-01-31T05:00:00+00:00","inService":"2024-06-06T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"St. Croix","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"PINE LAKE TO THREE LAKES 115 KV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397360,"projectNumber":"J1806","queueDate":"2020-06-20T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2022-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Greensboro Substation 345kV","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397361,"projectNumber":"J1808","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-02-28T05:00:00+00:00","negInService":"2026-02-28T05:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Barron","state":"WI","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Barron 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":148.0,"dp1NrisMw":0.0,"dp2ErisMw":148.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397362,"projectNumber":"J1809","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-02-19T05:00:00+00:00","inService":"2023-08-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Houghton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Atlantic -Silver River 138 kV","summerNetMW":62.5,"winterNetMW":62.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397363,"projectNumber":"J1793","queueDate":"2020-06-23T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","negInService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Holland 138 kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397364,"projectNumber":"J1805","queueDate":"2022-01-11T05:00:00+00:00","withdrawnDate":"2026-01-09T05:00:00+00:00","inService":"2024-04-12T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Maple 69 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397365,"projectNumber":"J1812","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Chambers","state":"TX","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Stowell 230 kV","summerNetMW":294.25,"winterNetMW":294.25,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397366,"projectNumber":"J1813","queueDate":"2022-07-07T04:00:00+00:00","inService":"2020-03-20T04:00:00+00:00","giaToExec":"2022-11-15T05:00:00+00:00","negInService":"2002-03-20T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"DeSoto","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Entergy Freeport 230 kV Substation","summerNetMW":920.0,"winterNetMW":1005.0,"dp1ErisMw":205.0,"dp1NrisMw":0.0,"dp2ErisMw":205.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397367,"projectNumber":"J1820","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-13T04:00:00+00:00","negInService":"2026-09-13T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397368,"projectNumber":"J1822","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-01-04T05:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397369,"projectNumber":"J1807","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2023-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Washington","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Mount Tabor 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397370,"projectNumber":"J1810","queueDate":"2020-06-20T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Reynolds 345kV to Burr Oaks 345kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397371,"projectNumber":"J1811","queueDate":"2020-06-19T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Independence","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Independence 161 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397372,"projectNumber":"J1814","queueDate":"2020-06-24T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2026-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Nordic","summerNetMW":22.5,"winterNetMW":22.5,"dp1ErisMw":22.5,"dp1NrisMw":22.5,"dp2ErisMw":22.5,"dp2NrisMw":22.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397373,"projectNumber":"J1938","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Werner West - Rocky Run 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397374,"projectNumber":"J1792","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-02-19T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Houghton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"New Tap of the Ontonagan to Rockland Jct 69kV Line approx. 2.2 mi. north of Rockland Jct.","summerNetMW":22.5,"winterNetMW":22.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397375,"projectNumber":"J1795","queueDate":"2020-06-22T04:00:00+00:00","inService":"2023-08-31T04:00:00+00:00","giaToExec":"2022-11-21T05:00:00+00:00","negInService":"2025-12-04T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"ERIS","poiName":"Bayou Cove to Richard 138kV (Circuit 258)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397376,"projectNumber":"J1796","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2023-02-28T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Pine Prairie to Coughlin 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397377,"projectNumber":"J1799","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2021-02-13T05:00:00+00:00","inService":"2022-02-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"E-NRIS","poiName":"Joppa 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397378,"projectNumber":"J1800","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-10-08T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Mower","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Adams Switch Yard 161kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397379,"projectNumber":"J1801","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-11-17T05:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS-Only","poiName":"Story County Substation 161kV","summerNetMW":39.0,"winterNetMW":39.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397380,"projectNumber":"J1802","queueDate":"2020-06-18T04:00:00+00:00","withdrawnDate":"2026-08-12T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Burr Oak 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397381,"projectNumber":"J1816","queueDate":"2022-03-17T04:00:00+00:00","inService":"2025-10-30T04:00:00+00:00","giaToExec":"2022-11-17T05:00:00+00:00","negInService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"FISHER - CHERRY VALLEY 161.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":100.0,"dp2ErisMw":135.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397382,"projectNumber":"J1818","queueDate":"2020-06-19T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","giaToExec":"2023-01-18T05:00:00+00:00","negInService":"2026-06-30T04:00:00+00:00","transmissionOwner":"LAFAYETTE UTILITIES SYSTEM","county":"Lafayette","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Northeast (Moss) 69kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":80.0,"dp2NrisMw":80.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397383,"projectNumber":"J1819","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-13T04:00:00+00:00","negInService":"2026-09-13T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397384,"projectNumber":"J1823","queueDate":"2020-06-24T04:00:00+00:00","withdrawnDate":"2021-02-19T05:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Houghton","state":"MI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Portage (UPPCO) - Atlantic 69 kV","summerNetMW":62.5,"winterNetMW":62.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397385,"projectNumber":"J1826","queueDate":"2022-09-08T04:00:00+00:00","inService":"2022-03-01T05:00:00+00:00","negInService":"2024-08-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota","state":"MN","studyCycle":"DPP-2020","studyGroup":"West","studyPhase":"GIA","svcType":"NRIS","poiName":"Cannon Falls Transmission 69 kV","summerNetMW":4.0,"winterNetMW":4.0,"dp1ErisMw":4.0,"dp1NrisMw":0.0,"dp2ErisMw":4.0,"dp2NrisMw":0.0,"fuelType":"Hydro","facilityType":"Hydroelectric","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397386,"projectNumber":"J1830","queueDate":"2020-06-23T04:00:00+00:00","withdrawnDate":"2024-09-03T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Kelso - Joppa (Massac) 345 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397387,"projectNumber":"J1999","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rodemacher","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397388,"projectNumber":"J2000","queueDate":"2021-08-10T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Frankfort to Cayuga 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397389,"projectNumber":"J1824","queueDate":"2020-06-24T04:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","negInService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2020","studyGroup":"East (ATC)","studyPhase":"GIA","svcType":"NRIS","poiName":"Academy 138KV","summerNetMW":73.8,"winterNetMW":73.8,"dp1ErisMw":67.0,"dp1NrisMw":67.0,"dp2ErisMw":67.0,"dp2NrisMw":67.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397390,"projectNumber":"J1825","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2020-12-18T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Decatur","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"Westport","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397391,"projectNumber":"J1995","queueDate":"2021-08-04T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2025-07-23T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Richland","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"DUNN - OAK RIDGE (LA) 115.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397392,"projectNumber":"J1996","queueDate":"2021-08-11T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Shawano","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"West Shawano 138kV - Badger 138kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397393,"projectNumber":"J1997","queueDate":"2021-08-11T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Nelson (EES) - Longville 138kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397394,"projectNumber":"J1998","queueDate":"2021-08-04T04:00:00+00:00","withdrawnDate":"2026-06-22T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Nuthatch Switching Station","summerNetMW":66.0,"winterNetMW":66.0,"dp1ErisMw":66.0,"dp1NrisMw":66.0,"dp2ErisMw":66.0,"dp2NrisMw":66.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397395,"projectNumber":"J1828","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2021-03-12T05:00:00+00:00","inService":"2024-08-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"ERIS","poiName":"Austin-1 138 kV substation","summerNetMW":99.2,"winterNetMW":99.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397396,"projectNumber":"J1829","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2023-07-17T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Shelby","state":"IN","studyCycle":"DPP-2020","studyGroup":"Central","studyPhase":"GIA","svcType":"NRIS","poiName":"DEI's Columbus to Clark Twp. 230 kV (one of the two 230 kV circuits going from Columbus to Five Poin","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397397,"projectNumber":"J1992","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Genpower Keo 500kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397398,"projectNumber":"J1993","queueDate":"2021-12-01T05:00:00+00:00","inService":"2025-07-23T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS-Only","poiName":"Columbia - South Fond du Lac 345.0kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":99.0,"dp1NrisMw":99.0,"dp2ErisMw":99.0,"dp2NrisMw":99.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397399,"projectNumber":"J2009","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Robert E Ritchie - Stuttgart Rcuskey 230kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397400,"projectNumber":"J2010","queueDate":"2021-08-26T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","negInService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397401,"projectNumber":"J2006","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Robert E Ritchie - Stuttgart Rcuskey 230kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397402,"projectNumber":"J2008","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7MCCREDIE - 7MONTGMRY 345.0kV","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":65.0,"dp1NrisMw":65.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397403,"projectNumber":"J2011","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Bastrop Tap 115kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397404,"projectNumber":"J2018","queueDate":"2021-11-23T05:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Clark","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Eau Claire - Arpin 345kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397405,"projectNumber":"J2020","queueDate":"2021-08-10T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"CLECO Cooper-Penton Road 230kV Line","summerNetMW":260.0,"winterNetMW":260.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397406,"projectNumber":"J2021","queueDate":"2021-07-30T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Trempealeau","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tremval 69kV","summerNetMW":48.43,"winterNetMW":48.43,"dp1ErisMw":48.43,"dp1NrisMw":48.43,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397407,"projectNumber":"J2012","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Chicken Farm-Amite","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397408,"projectNumber":"J2027","queueDate":"2025-07-14T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Dakota","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":150.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397409,"projectNumber":"J1821","queueDate":"2020-06-25T04:00:00+00:00","inService":"2023-09-13T04:00:00+00:00","negInService":"2026-09-13T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397410,"projectNumber":"J1827","queueDate":"2021-10-20T04:00:00+00:00","doneDate":"2023-01-18T05:00:00+00:00","inService":"2023-10-31T04:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"bastrop tap point","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":90.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397411,"projectNumber":"J2022","queueDate":"2021-10-18T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Mower","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pleasant Valley 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397412,"projectNumber":"J2023","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Gloster to Liberty 138 kV","summerNetMW":94.1,"winterNetMW":94.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397413,"projectNumber":"J2030","queueDate":"2021-07-21T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Isanti","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ISANTTI TAP to ATHNSSW 69kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":56.0,"dp1NrisMw":56.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397414,"projectNumber":"J2031","queueDate":"2021-08-13T04:00:00+00:00","inService":"2026-12-15T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tama","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Toledo","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397415,"projectNumber":"J2032","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Marion","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hanna","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":70.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397416,"projectNumber":"J2034","queueDate":"2022-04-05T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lafourche","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Thibodaux","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397417,"projectNumber":"J2045","queueDate":"2022-03-28T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Goodland 138 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":50.0,"dp2NrisMw":50.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397418,"projectNumber":"J2046","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Wabash","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Miami Wabash - Mier 138 kV (40.723889, -85.812019)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397419,"projectNumber":"J2026","queueDate":"2021-11-15T05:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","negInService":"2027-12-02T05:00:00+00:00","transmissionOwner":"ITC","county":"Gratiot","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"REGAL","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397420,"projectNumber":"J2028","queueDate":"2021-08-10T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Kuhn Rd to Parkin","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397421,"projectNumber":"J2029","queueDate":"2021-11-30T05:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2027-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marquette","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Perch Lake","summerNetMW":62.5,"winterNetMW":62.5,"dp1ErisMw":62.5,"dp1NrisMw":62.5,"dp2ErisMw":62.5,"dp2NrisMw":62.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397422,"projectNumber":"J2039","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Meredosia to Ipava 345 kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397423,"projectNumber":"J1994","queueDate":"2021-07-30T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Fond du Lac","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Metomen 138 kV","summerNetMW":97.09,"winterNetMW":97.09,"dp1ErisMw":97.08,"dp1NrisMw":97.08,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397424,"projectNumber":"J2001","queueDate":"2021-08-16T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","negInService":"2029-07-12T04:00:00+00:00","transmissionOwner":"METC","county":"Newaygo","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"KENOWA - LUDINGTON 345.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":220.0,"dp2NrisMw":220.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397425,"projectNumber":"J2040","queueDate":"2021-08-03T04:00:00+00:00","withdrawnDate":"2025-10-15T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Dickinson","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Lakefield - Obrien Co 345 kV (43.497803, -95.318336)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397426,"projectNumber":"J2041","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Amelia North substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397427,"projectNumber":"J2042","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"CROSSETT NORTH - BEEKMAN 115.0kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397428,"projectNumber":"J2043","queueDate":"2022-04-05T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Callaway","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Overton - McCredie 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397429,"projectNumber":"J2002","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-03-13T04:00:00+00:00","negInService":"2027-05-13T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Washington","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SUB T HASKINS","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397430,"projectNumber":"J2003","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Deuel","state":"SD","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Astoria 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397431,"projectNumber":"J2004","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397432,"projectNumber":"J2005","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Deuel","state":"SD","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Astoria 345kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397433,"projectNumber":"J2007","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Genpower Keo 500kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397434,"projectNumber":"J2016","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Daviess","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"F.B Culley to Northeast","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397435,"projectNumber":"J2035","queueDate":"2022-04-05T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lafourche","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Thibodaux","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397436,"projectNumber":"J2036","queueDate":"2022-04-05T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hutsonville - Neoga 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397437,"projectNumber":"J2013","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Chicken Farm-Amite","summerNetMW":52.92,"winterNetMW":52.92,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397438,"projectNumber":"J2014","queueDate":"2021-11-23T05:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Clark","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Eau Claire - Arpin 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397439,"projectNumber":"J2015","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Lula-Tunica (same POI as J1440)","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397440,"projectNumber":"J2024","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Cypress 230 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397441,"projectNumber":"J2038","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kokomo Webster St.  - Walton 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397442,"projectNumber":"J2053","queueDate":"2021-08-17T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Redwood","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":151.47,"winterNetMW":151.47,"dp1ErisMw":151.47,"dp1NrisMw":122.0,"dp2ErisMw":151.47,"dp2NrisMw":122.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397443,"projectNumber":"J2054","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Freeborn","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Freeborn","summerNetMW":67.0,"winterNetMW":67.0,"dp1ErisMw":67.0,"dp1NrisMw":67.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397444,"projectNumber":"J2059","queueDate":"2022-03-18T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tippecanoe","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Springboro - Lafayette 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397445,"projectNumber":"J2025","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. James","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Vacherie 230 kV","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397446,"projectNumber":"J2033","queueDate":"2021-08-26T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7XENIA    - 7MTVERNW 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397447,"projectNumber":"J2060","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Tippecanoe","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Springboro - Lafayette 138 kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397448,"projectNumber":"J2061","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","negInService":"2028-11-24T05:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"MURPHY","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397449,"projectNumber":"J2062","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2023-06-05T04:00:00+00:00","inService":"2024-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Columbia 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397450,"projectNumber":"J2063","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-07-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wheatland 345kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397451,"projectNumber":"J2048","queueDate":"2022-03-25T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Benton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GOODLAND - MORRISON DITCH 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397452,"projectNumber":"J2055","queueDate":"2021-08-13T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","negInService":"2026-06-26T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Edgewater","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397453,"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"DeSoto","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Robinsonville 230 kV","summerNetMW":199.0,"winterNetMW":199.0,"dp1ErisMw":199.0,"dp1NrisMw":0.0,"dp2ErisMw":199.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397454,"projectNumber":"J2056","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2025-03-03T05:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Morocco to Beecher 138 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397455,"projectNumber":"J2057","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2026-03-23T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2029-04-15T04:00:00+00:00","transmissionOwner":"METC","county":"Montcalm","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Nelson Road to Kenowa 345 kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3397456,"projectNumber":"J2077","queueDate":"2021-12-10T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Livingston","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Independence (6INDEPD)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397457,"projectNumber":"J2078","queueDate":"2021-08-13T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fernald","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397458,"projectNumber":"J2079","queueDate":"2021-08-06T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hancock","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"Lime Creek 161 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397459,"projectNumber":"J2086","queueDate":"2021-08-09T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Barnes","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Buffalo 345 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397460,"projectNumber":"J2087","queueDate":"2025-08-19T04:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","negInService":"2029-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Renville","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FRANKLIN","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":125.0,"dp2NrisMw":125.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397461,"projectNumber":"J2044","queueDate":"2022-03-29T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Goodland 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397462,"projectNumber":"J2049","queueDate":"2022-03-25T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397463,"projectNumber":"J2050","queueDate":"2022-03-28T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Macon","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Thomas Hill-Adair-1 161kV","summerNetMW":208.43,"winterNetMW":208.43,"dp1ErisMw":208.43,"dp1NrisMw":208.43,"dp2ErisMw":208.43,"dp2NrisMw":208.43,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397464,"projectNumber":"J2051","queueDate":"2021-11-23T05:00:00+00:00","withdrawnDate":"2023-11-10T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"161 kV line tap of DELL EAST to Blytheville","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397465,"projectNumber":"J2052","queueDate":"2022-04-05T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Overton - McCredie 345kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397466,"projectNumber":"J2065","queueDate":"2021-07-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pipestone","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Buffalo Ridge to Pipestone 115kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397467,"projectNumber":"J2066","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2026-09-18T04:00:00+00:00","inService":"2022-12-02T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Henry","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Denmark","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397468,"projectNumber":"J2068","queueDate":"2021-07-19T04:00:00+00:00","withdrawnDate":"2026-05-20T04:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Pierce","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Herbert 69 kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":75.0,"dp2NrisMw":75.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397469,"projectNumber":"J2071","queueDate":"2021-09-14T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2028-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"RYE CO - CYPRESS 138.0kV","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":198.0,"dp1NrisMw":0.0,"dp2ErisMw":198.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397470,"projectNumber":"J2072","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Woodward 115kV -  H.S. EHV 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397471,"projectNumber":"J2080","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2026-06-04T04:00:00+00:00","inService":"2024-05-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Oliver","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Square Butte 230 kV Substation East","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397472,"projectNumber":"J2081","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2025-12-09T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","negInService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Sans Souci 500kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":15.0,"dp1NrisMw":15.0,"dp2ErisMw":15.0,"dp2NrisMw":15.0,"fuelType":"Coal","facilityType":"Steam Turbine (including Nuclear, Geothermal and Solar Steam)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397473,"projectNumber":"J2082","queueDate":"2021-09-02T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-04T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Shady Oaks (Bus# 500780) to Coughlin (Bus# 500230)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397474,"projectNumber":"J2083","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2023-11-10T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Allen","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Caney","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397475,"projectNumber":"J2089","queueDate":"2021-11-23T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Line tap DELL to Manilla AECC 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397476,"projectNumber":"J2257","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Ville Platte - Westfork 230kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397477,"projectNumber":"J2093","queueDate":"2021-12-21T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"West Memphis to Hughes 161 kV Line Tap","summerNetMW":144.0,"winterNetMW":144.0,"dp1ErisMw":144.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397478,"projectNumber":"J2094","queueDate":"2021-08-03T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2022-11-30T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Sargent","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Forman 230 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397479,"projectNumber":"J2097","queueDate":"2021-08-25T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morton","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tri-County 230 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397480,"projectNumber":"J2098","queueDate":"2021-08-22T04:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","negInService":"2026-01-31T05:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"BATTLE CREEK - ONEIDA 345.0kV","summerNetMW":309.0,"winterNetMW":309.0,"dp1ErisMw":309.0,"dp1NrisMw":309.0,"dp2ErisMw":309.0,"dp2NrisMw":309.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397481,"projectNumber":"J2073","queueDate":"2021-11-29T05:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-10-15T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Ohio","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"345 kV Wilson Substation","summerNetMW":91.53,"winterNetMW":91.53,"dp1ErisMw":91.53,"dp1NrisMw":91.53,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397482,"projectNumber":"J2074","queueDate":"2021-10-18T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Outagamie","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Werner West 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397483,"projectNumber":"J2084","queueDate":"2021-11-01T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Emmons","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Linton NW (not in power flow case yet)","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":45.0,"dp1NrisMw":45.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397484,"projectNumber":"J2085","queueDate":"2021-11-01T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Emmons","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Linton NW 115 kV (radial to Wishek 115 kV)","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397485,"projectNumber":"J2090","queueDate":"2022-07-13T04:00:00+00:00","withdrawnDate":"2023-11-07T05:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"161 kV  Parkin to Kuhn RoadLine Tap","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397486,"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"DeSoto","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"TWINKLETOWN 230 KV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":130.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397487,"projectNumber":"J2095","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Tama","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Belle Plaine Junction to Toledo Transmission","summerNetMW":212.0,"winterNetMW":212.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397488,"projectNumber":"J2260","queueDate":"2021-10-07T04:00:00+00:00","inService":"2023-07-31T04:00:00+00:00","transmissionOwner":"METC","county":"Presque Isle","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"PORT CALCITE - RIGGSVILLE 138.0kV","summerNetMW":251.5,"winterNetMW":251.5,"dp1ErisMw":149.24,"dp1NrisMw":149.24,"dp2ErisMw":149.24,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397489,"projectNumber":"J2264","queueDate":"2021-10-11T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-02-02T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Prairie","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Desarc(A) (500kV) -Griffithville(B) (500kV)","summerNetMW":88.0,"winterNetMW":88.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397490,"projectNumber":"J2265","queueDate":"2025-07-16T04:00:00+00:00","inService":"2024-02-15T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Bollinger","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"St. Francois (Bus #345773) - Lutesville (Bus #344974) 345 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":200.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397491,"projectNumber":"J2266","queueDate":"2025-06-09T04:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Edgar","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7KANSAS   - 08SUGCRK 345.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":175.0,"dp2NrisMw":175.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397492,"projectNumber":"J2268","queueDate":"2021-08-11T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Duane Arnold","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":370.0,"dp1NrisMw":370.0,"dp2ErisMw":370.0,"dp2NrisMw":370.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397493,"projectNumber":"J2269","queueDate":"2022-06-14T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Veedersburg West - Lafayette 230kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397494,"projectNumber":"J2273","queueDate":"2025-07-03T04:00:00+00:00","inService":"2024-03-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clinton","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tabor","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":175.0,"dp2NrisMw":175.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397495,"projectNumber":"J2064","queueDate":"2021-11-08T05:00:00+00:00","inService":"2024-10-07T04:00:00+00:00","negInService":"2026-11-04T05:00:00+00:00","transmissionOwner":"METC","county":"Jackson","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Tompkins 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397496,"projectNumber":"J2069","queueDate":"2021-11-30T05:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2027-06-07T04:00:00+00:00","transmissionOwner":"ITC","county":"Montcalm","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"EUREKA - VESTABURG 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397497,"projectNumber":"J2070","queueDate":"2021-10-18T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"St. Croix","state":"WI","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Three Lakes - Pine Lake 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397498,"projectNumber":"J2075","queueDate":"2021-08-27T04:00:00+00:00","inService":"2024-10-04T04:00:00+00:00","negInService":"2028-05-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"China (Bus# 334204) to Sheco Batiste Creek (Bus# 334240)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397499,"projectNumber":"J2088","queueDate":"2022-07-13T04:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500 kV (854.0)","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":400.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397500,"projectNumber":"J2092","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2023-10-10T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Wright","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Dickinson Sub","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397501,"projectNumber":"J2258","queueDate":"2022-03-28T04:00:00+00:00","inService":"2024-05-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Adams","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"East Quincy-Fishhook 138kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":175.0,"dp2NrisMw":175.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397502,"projectNumber":"J2262","queueDate":"2021-10-11T04:00:00+00:00","inService":"2029-07-20T04:00:00+00:00","negInService":"2028-09-28T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV","summerNetMW":625.0,"winterNetMW":625.0,"dp1ErisMw":652.0,"dp1NrisMw":652.0,"dp2ErisMw":625.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397503,"projectNumber":"J2263","queueDate":"2021-08-31T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-08-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport 345KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397504,"projectNumber":"J2271","queueDate":"2021-07-21T04:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"South Fond du Lac to Columbia 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397505,"projectNumber":"J2272","queueDate":"2021-07-22T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Calamus East","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397506,"projectNumber":"J2275","queueDate":"2022-03-22T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fargo to Sandburg 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":250.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397507,"projectNumber":"J2277","queueDate":"2022-05-06T04:00:00+00:00","withdrawnDate":"2025-10-08T04:00:00+00:00","inService":"2023-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Arnott - Golden Sands 138.0kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397508,"projectNumber":"J2279","queueDate":"2021-07-21T04:00:00+00:00","withdrawnDate":"2025-03-03T05:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Ionia","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Burnips to Tremaine 138 kV line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397509,"projectNumber":"J2280","queueDate":"2022-03-28T04:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GREENWOOD CLARK TOWNSHIP","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":198.0,"dp1NrisMw":198.0,"dp2ErisMw":198.0,"dp2NrisMw":198.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397510,"projectNumber":"J2288","queueDate":"2025-01-27T05:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Ralls","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SPENCER CREEK","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":175.0,"dp2NrisMw":175.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397511,"projectNumber":"J2293","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2024-10-01T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Adams","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other_","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397512,"projectNumber":"J2297","queueDate":"2021-09-09T04:00:00+00:00","withdrawnDate":"2026-03-10T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","negInService":"2026-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Indianola 230kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397513,"projectNumber":"J2261","queueDate":"2021-10-11T04:00:00+00:00","inService":"2029-07-20T04:00:00+00:00","negInService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV","summerNetMW":625.0,"winterNetMW":625.0,"dp1ErisMw":652.0,"dp1NrisMw":652.0,"dp2ErisMw":625.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397514,"projectNumber":"J2267","queueDate":"2022-03-24T04:00:00+00:00","inService":"2025-03-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Williamson","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"345 kV Crab Orchard Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":225.0,"dp2NrisMw":225.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397515,"projectNumber":"J2274","queueDate":"2021-07-21T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Lincoln","state":"MO","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pike - Troy 161kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":104.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397516,"projectNumber":"J2276","queueDate":"2022-04-11T04:00:00+00:00","inService":"2022-01-01T05:00:00+00:00","negInService":"2027-01-01T05:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES - TRANSMISSION","county":"Douglas","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ALEXANDRIA","summerNetMW":39.5,"winterNetMW":39.5,"dp1ErisMw":39.5,"dp1NrisMw":39.5,"dp2ErisMw":39.5,"dp2NrisMw":39.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397517,"projectNumber":"J2292","queueDate":"2021-09-15T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","negInService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"GOOS FERRY","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":0.0,"dp2ErisMw":50.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397518,"projectNumber":"J2296","queueDate":"2022-03-24T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Merom Gibson 345kV line Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":100.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397519,"projectNumber":"J2259","queueDate":"2021-08-12T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"WABASH VALLEY POWER ASSOCIATION, INC.","county":"Hendricks","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Amo 345kV","summerNetMW":199.99,"winterNetMW":199.99,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397520,"projectNumber":"J2270","queueDate":"2021-08-16T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":300.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397521,"projectNumber":"J2278","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Edgar","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397522,"projectNumber":"J2282","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-10-25T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Ohio","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BR Tap -- New Hardinsburg 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397523,"projectNumber":"J2283","queueDate":"2021-11-19T05:00:00+00:00","inService":"2020-10-01T04:00:00+00:00","negInService":"2020-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Hillsdale","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"18Knowles (MISO node #256632)","summerNetMW":16.1,"winterNetMW":16.1,"dp1ErisMw":16.1,"dp1NrisMw":16.1,"dp2ErisMw":16.1,"dp2NrisMw":16.1,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397524,"projectNumber":"J2284","queueDate":"2021-09-08T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-12-30T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Coahoma","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Clarksdale-Delta 115kV line","summerNetMW":65.97,"winterNetMW":65.97,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397525,"projectNumber":"J2287","queueDate":"2021-09-07T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"DELTA SES SWITCHYARD 115kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":0.0,"dp2ErisMw":122.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397526,"projectNumber":"J2294","queueDate":"2021-08-10T04:00:00+00:00","inService":"2024-05-01T04:00:00+00:00","negInService":"2028-06-28T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Mississippi","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Dell to Nucor 161 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":250.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397527,"projectNumber":"J2302","queueDate":"2021-11-10T05:00:00+00:00","inService":"2024-08-01T04:00:00+00:00","negInService":"2027-10-11T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Helena","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"MCKNIGHT - PLANT DANIEL 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":400.0,"dp2NrisMw":400.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397528,"projectNumber":"J2304","queueDate":"2021-12-02T05:00:00+00:00","inService":"2024-04-15T04:00:00+00:00","negInService":"2028-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Columbia - Rockdale 345.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":400.0,"dp2NrisMw":400.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397529,"projectNumber":"J2289","queueDate":"2021-09-09T04:00:00+00:00","withdrawnDate":"2026-02-17T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","negInService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Indianola 230/130 Sub","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397530,"projectNumber":"J2290","queueDate":"2022-02-17T05:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2025-10-25T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Avoyelles","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"CLECO Yellow Bayou 138kV Substation","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397531,"projectNumber":"J2300","queueDate":"2021-11-30T05:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Greene","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Gainesville Switching Station","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397532,"projectNumber":"J2308","queueDate":"2022-03-23T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greentown  - Walton. 230.0kV","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":35.0,"dp1NrisMw":35.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397533,"projectNumber":"J2309","queueDate":"2021-09-07T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","negInService":"2029-10-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Murray","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Chanarambie - ELLSBOROUGH (GRE) 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397534,"projectNumber":"J2311","queueDate":"2024-10-18T04:00:00+00:00","inService":"2024-02-09T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Putnam","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":145.0,"dp1NrisMw":145.0,"dp2ErisMw":145.0,"dp2NrisMw":145.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397535,"projectNumber":"J2305","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Henderson - AB Brown 138 kV","summerNetMW":139.0,"winterNetMW":139.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397536,"projectNumber":"J2312","queueDate":"2024-10-18T04:00:00+00:00","inService":"2024-02-09T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Putnam","summerNetMW":47.9,"winterNetMW":47.9,"dp1ErisMw":47.9,"dp1NrisMw":47.9,"dp2ErisMw":47.9,"dp2NrisMw":47.9,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397537,"projectNumber":"J2314","queueDate":"2021-09-10T04:00:00+00:00","inService":"2023-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"PETRY WOODS SS","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":150.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397538,"projectNumber":"J2315","queueDate":"2021-09-10T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2023-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Petry Woods","summerNetMW":75.3,"winterNetMW":75.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397539,"projectNumber":"J2313","queueDate":"2021-09-10T04:00:00+00:00","withdrawnDate":"2025-03-07T05:00:00+00:00","inService":"2023-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Other_","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397540,"projectNumber":"J2316","queueDate":"2021-09-16T04:00:00+00:00","inService":"2023-09-15T04:00:00+00:00","negInService":"2027-08-02T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Nordic 138kV Substation","summerNetMW":77.5,"winterNetMW":77.5,"dp1ErisMw":77.5,"dp1NrisMw":77.5,"dp2ErisMw":77.5,"dp2NrisMw":71.5,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397541,"projectNumber":"J2334","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Redhawk","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":195.0,"dp1NrisMw":195.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397542,"projectNumber":"J3838","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ingham","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DELHI - TOMPKINS 138.0kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":135.0,"dp1NrisMw":135.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397543,"projectNumber":"J2317","queueDate":"2021-12-21T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","negInService":"2027-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ouachita","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":202.5,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397544,"projectNumber":"J2319","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2021-12-22T05:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Stein 345 kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397545,"projectNumber":"J1748","queueDate":"2020-07-17T04:00:00+00:00","doneDate":"2022-11-29T05:00:00+00:00","inService":"2023-08-15T04:00:00+00:00","giaToExec":"2022-11-29T05:00:00+00:00","negInService":"2025-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"DeSoto","state":"MS","studyCycle":"DPP-2020","studyGroup":"South","studyPhase":"GIA","svcType":"NRIS","poiName":"Twinkletown 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":100.0,"dp2NrisMw":100.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397546,"projectNumber":"J3849","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Winnebago","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bison - Colby 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3397547,"projectNumber":"J2298","queueDate":"2021-11-30T05:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","negInService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Greene","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Gainesville Switching Station","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":200.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397548,"projectNumber":"J2301","queueDate":"2022-03-28T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":70.0,"dp1NrisMw":0.0,"dp2ErisMw":70.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397549,"projectNumber":"J2307","queueDate":"2022-03-23T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greentown  - Walton. 230.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":130.0,"dp2ErisMw":130.0,"dp2NrisMw":130.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397550,"projectNumber":"J2324","queueDate":"2022-09-08T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-02-24T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Winnebago","state":"IL","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Shirland Ave Tap (Y-54) to Shaw 69kV","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397551,"projectNumber":"J3525","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-06T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Rock Island","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SUB 47","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397552,"projectNumber":"J3536","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC TRUMANN WEST - TRUMANN 161.0kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397553,"projectNumber":"J3559","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Hancock","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Coleman EHV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397554,"projectNumber":"J3561","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jo Daviess","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Galena (DPC) - Savanna 161kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397555,"projectNumber":"J3620","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MONETTE JUNCTION - PARAGOULD 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397556,"projectNumber":"J3621","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HERGETT - POWERLINE ROAD 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397557,"projectNumber":"J3533","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Randolph","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5MOBERLY  - SALSBRY5 (KCPL) 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397558,"projectNumber":"J3530","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Saline","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SHERIDAN EHV - MAGNET COVE 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397559,"projectNumber":"J3546","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lincoln","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Yankee - Brookings CO. 115.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397560,"projectNumber":"J3617","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DATTO","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397561,"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Wabasha","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wabaco","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397562,"projectNumber":"J3526","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2030-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NORTH ROCHESTER","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397563,"projectNumber":"J3532","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Roseau","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Riel (MH) - Roseau County North 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397564,"projectNumber":"J3534","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Madison","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DELHI - TALLULAH 115.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397565,"projectNumber":"J3531","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"White","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397566,"projectNumber":"J3537","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Kalamazoo","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Weeds Lake 138kV substation (Bus Number 256510)","summerNetMW":265.0,"winterNetMW":265.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397567,"projectNumber":"J3545","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BINGHAM - MARQUETTE 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397568,"projectNumber":"J3578","queueDate":"2024-04-09T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Greene","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gainesville Switching Station","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397569,"projectNumber":"J2310","queueDate":"2021-09-09T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2024-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Beauregard","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Rhodes","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397570,"projectNumber":"J2318","queueDate":"2022-03-28T04:00:00+00:00","withdrawnDate":"2024-10-08T04:00:00+00:00","inService":"2025-10-25T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Warren","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"North East (Castle) - Culley 138 kV (J1642 POI)","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397571,"projectNumber":"J3622","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HERGETT - POWERLINE ROAD 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397572,"projectNumber":"J4301","queueDate":"2026-09-08T19:05:24+00:00","inService":"2031-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Peoria","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397573,"projectNumber":"J2320","queueDate":"2021-09-10T04:00:00+00:00","withdrawnDate":"2023-10-25T04:00:00+00:00","inService":"2023-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Inverness","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397574,"projectNumber":"J3847","queueDate":"2025-01-03T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jefferson","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Walton Shell Substation 138KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397575,"projectNumber":"J3846","queueDate":"2025-01-10T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397576,"projectNumber":"J3853","queueDate":"2024-12-26T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Iroquois","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397577,"projectNumber":"J4305","queueDate":"2026-09-02T19:36:36+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397578,"projectNumber":"J4262","queueDate":"2026-08-20T18:29:06+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Tazewell","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397579,"projectNumber":"J3535","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Dunklin","state":"MO","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"JIM HILL - HAYTI SOUTH 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397580,"projectNumber":"J3547","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Martin","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LAKEFIELD","summerNetMW":549.6,"winterNetMW":630.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397581,"projectNumber":"J3560","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Putnam 138kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397582,"projectNumber":"J3623","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - TILLATOBA 230.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397583,"projectNumber":"J3616","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STUTTGART NORTH SS - STUTTGART RICUSKEY 115.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397584,"projectNumber":"J3618","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DATTO","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397585,"projectNumber":"J3619","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MONETTE JUNCTION - PARAGOULD 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397586,"projectNumber":"J4307","queueDate":"2026-09-09T18:08:53+00:00","inService":"2031-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":720.0,"winterNetMW":720.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397587,"projectNumber":"J4267","queueDate":"2026-08-20T18:14:15+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Tazewell","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397588,"projectNumber":"J4276","queueDate":"2026-08-28T16:44:15+00:00","inService":"2031-10-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397589,"projectNumber":"J4021","queueDate":"2025-05-27T04:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Sullivan","state":"IN","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Petersburg - Sullivan (AEP/PJM) 345.0kV","summerNetMW":470.0,"winterNetMW":470.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397590,"projectNumber":"J4020","queueDate":"2025-05-12T04:00:00+00:00","withdrawnDate":"2025-09-11T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pleasant Prairie - Arcadian 345.0kV","summerNetMW":481.0,"winterNetMW":481.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397591,"projectNumber":"J4030","queueDate":"2025-05-29T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Faulkner","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MAYFLOWER115KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397592,"projectNumber":"J3983","queueDate":"2024-10-30T04:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Gibson","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MACKEY","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397593,"projectNumber":"J4281","queueDate":"2026-09-01T16:17:55+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":481.2,"winterNetMW":481.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397594,"projectNumber":"J4017","queueDate":"2025-05-15T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Blue Earth","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wilmarth - Fieldon 345.0kV","summerNetMW":299.0,"winterNetMW":299.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397595,"projectNumber":"J4269","queueDate":"2026-08-13T00:08:19+00:00","inService":"2031-03-26T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397596,"projectNumber":"J4279","queueDate":"2026-08-28T00:54:15+00:00","inService":"2029-10-05T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":9.0,"winterNetMW":9.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397597,"projectNumber":"J4019","queueDate":"2025-05-07T04:00:00+00:00","inService":"2030-07-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"BATTLE CREEK - ONEIDA 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397598,"projectNumber":"J3950","queueDate":"2025-02-20T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7CASEY - 7SNYDER  345.0kV","summerNetMW":340.0,"winterNetMW":340.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397599,"projectNumber":"J3947","queueDate":"2025-03-25T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7FARADAY - 7PANA 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397600,"projectNumber":"J4022","queueDate":"2025-05-22T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ouachita","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STERLINGTON 500 SWYD","summerNetMW":1509.0,"winterNetMW":1509.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397601,"projectNumber":"S1081","queueDate":"2025-01-13T05:00:00+00:00","inService":"2028-04-30T04:00:00+00:00","negInService":"2029-05-12T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"DU PONT - WHITE LAKE 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397602,"projectNumber":"S1083","queueDate":"2025-01-14T05:00:00+00:00","withdrawnDate":"2026-03-24T04:00:00+00:00","inService":"2029-09-12T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Hancock","state":"KY","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Skillman","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397603,"projectNumber":"J3949","queueDate":"2025-04-07T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Scott","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7MEREDOSIA - 7TURNER 345.0kV","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":245.0,"dp1NrisMw":245.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397604,"projectNumber":"J3946","queueDate":"2025-03-31T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Tazewell","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397605,"projectNumber":"J3952","queueDate":"2025-02-26T05:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":395.0,"winterNetMW":395.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397606,"projectNumber":"J3974","queueDate":"2025-02-11T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397607,"projectNumber":"S1085","queueDate":"2025-01-14T05:00:00+00:00","inService":"2028-07-01T04:00:00+00:00","negInService":"2028-07-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Nobles","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"NOBLES COUNTY","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397608,"projectNumber":"J3897","queueDate":"2025-02-07T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta - Bedford 345 345.0kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397609,"projectNumber":"J3898","queueDate":"2025-02-14T05:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Howard","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV","summerNetMW":155.0,"winterNetMW":155.0,"dp1ErisMw":155.0,"dp1NrisMw":155.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397610,"projectNumber":"J3975","queueDate":"2025-03-10T04:00:00+00:00","inService":"2030-02-20T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rusk","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stone Lake - Gardner Park 345.0kV","summerNetMW":416.5,"winterNetMW":416.5,"dp1ErisMw":416.5,"dp1NrisMw":416.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397611,"projectNumber":"J3973","queueDate":"2025-03-05T05:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"COLDWATER - MOORE ROAD 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397612,"projectNumber":"J3976","queueDate":"2025-03-25T04:00:00+00:00","inService":"2028-12-15T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7COFFEN N - 7RAMSEY   345.0kV","summerNetMW":66.8,"winterNetMW":66.8,"dp1ErisMw":66.8,"dp1NrisMw":66.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397613,"projectNumber":"J3896","queueDate":"2025-02-07T05:00:00+00:00","inService":"2030-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta - Bedford 345 345.0kV","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":70.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397614,"projectNumber":"S1080","queueDate":"2025-01-14T05:00:00+00:00","inService":"2028-07-30T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Martin","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Rutland","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397615,"projectNumber":"R5064","queueDate":"2025-04-08T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Allamakee","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Lansing","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3397616,"projectNumber":"J3921","queueDate":"2025-03-07T05:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Jasper","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BONDURANT - MONTEZUMA 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397617,"projectNumber":"J3922","queueDate":"2025-03-04T05:00:00+00:00","inService":"2030-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HIPLE","summerNetMW":1445.0,"winterNetMW":1445.0,"dp1ErisMw":1445.0,"dp1NrisMw":1445.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3397618,"projectNumber":"J3924","queueDate":"2025-03-05T05:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"COLDWATER - MOORE ROAD 138.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397619,"projectNumber":"J3933","queueDate":"2025-02-24T05:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer - Quinn 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397620,"projectNumber":"J4099","queueDate":"2025-10-07T04:00:00+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Fox Lake - Jackson North 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397621,"projectNumber":"J4120","queueDate":"2025-09-16T04:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397622,"projectNumber":"J4122","queueDate":"2025-09-19T04:00:00+00:00","inService":"2031-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Goss","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397623,"projectNumber":"J4133","queueDate":"2025-10-03T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"De Soto","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dolet Hills Substation","summerNetMW":756.0,"winterNetMW":756.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397624,"projectNumber":"J4135","queueDate":"2025-10-03T04:00:00+00:00","withdrawnDate":"2025-12-26T05:00:00+00:00","inService":"2030-04-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South 345 kV substation","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397625,"projectNumber":"J4151","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"MINNESOTA MUNICIPAL POWER AGENCY","county":"Redwood","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397626,"projectNumber":"J4018","queueDate":"2025-05-02T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Ford","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397627,"projectNumber":"J4031","queueDate":"2025-05-12T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Scott","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7MEREDOSIA - 7TURNER 345.0kV","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":245.0,"dp1NrisMw":245.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397628,"projectNumber":"J3984","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397629,"projectNumber":"J3948","queueDate":"2025-03-25T04:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AB Brown 345 - Gibson (Duke Terminal) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397630,"projectNumber":"J3951","queueDate":"2025-02-26T05:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":218.0,"winterNetMW":218.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397631,"projectNumber":"J3980","queueDate":"2025-04-08T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta - Merom (HED) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397632,"projectNumber":"S1111","queueDate":"2025-07-31T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","negInService":"2028-05-05T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Adair","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"ORIENT","summerNetMW":263.0,"winterNetMW":263.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397633,"projectNumber":"J3923","queueDate":"2025-02-28T05:00:00+00:00","inService":"2030-03-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Majestic-Milan 345 kV Line","summerNetMW":1414.0,"winterNetMW":1414.0,"dp1ErisMw":1414.0,"dp1NrisMw":1414.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397634,"projectNumber":"J3981","queueDate":"2025-04-08T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta - Merom (HED) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397635,"projectNumber":"S1113","queueDate":"2025-08-26T04:00:00+00:00","inService":"2026-08-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Quinn","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397636,"projectNumber":"J4123","queueDate":"2025-09-19T04:00:00+00:00","inService":"2031-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"WAGNER","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397637,"projectNumber":"J4154","queueDate":"2025-10-07T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"GridUnity","county":"Madison","state":"MS","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"Andes Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397638,"projectNumber":"J3934","queueDate":"2025-02-19T05:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2029-03-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"McLeod","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blue Lake - MCLEOD (GRE) 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397639,"projectNumber":"J4097","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"New J1377 ATC Switching Station","summerNetMW":71.5,"winterNetMW":71.5,"dp1ErisMw":71.5,"dp1NrisMw":71.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397640,"projectNumber":"J4134","queueDate":"2025-10-03T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ouachita","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC CAMDEN SOUTH - STEPHENS 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397641,"projectNumber":"J4152","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"MINNESOTA MUNICIPAL POWER AGENCY M2PA","county":"Redwood","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397642,"projectNumber":"J4153","queueDate":"2025-10-07T04:00:00+00:00","inService":"2031-06-28T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant","state":"SD","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Big Stone South 345 kV substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397643,"projectNumber":"J4159","queueDate":"2025-08-13T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"ROOSEVELT","summerNetMW":616.0,"winterNetMW":664.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397644,"projectNumber":"J4156","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Ouachita","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RILLA - RIVERTON 115.0kV","summerNetMW":93.0,"winterNetMW":93.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397645,"projectNumber":"J4158","queueDate":"2025-10-02T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"De Witt","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"4TABOR - 4SCLINTON TP 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397646,"projectNumber":"S1117","queueDate":"2025-08-31T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","negInService":"2027-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"New Madrid","state":"MO","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Marston 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397647,"projectNumber":"J3925","queueDate":"2025-02-07T05:00:00+00:00","inService":"2030-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta - Bedford 345 345.0kV","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":70.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397648,"projectNumber":"J4098","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Lafayette","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rork - Sellers Road 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397649,"projectNumber":"J4119","queueDate":"2025-09-23T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Rankin","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RANKIN","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397650,"projectNumber":"J4121","queueDate":"2025-09-19T04:00:00+00:00","withdrawnDate":"2026-04-17T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Washington","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397651,"projectNumber":"J4136","queueDate":"2025-10-03T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2030-04-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397652,"projectNumber":"S1134","queueDate":"2025-12-24T21:51:10+00:00","inService":"2028-01-03T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"DeSoto","state":"MS","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"SIS","poiName":"TWINKLETOWN","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397653,"projectNumber":"R5076","queueDate":"2025-10-15T04:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"","county":"Lake","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"SCHAHFER GEN STA - ST. JOHN 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397654,"projectNumber":"J4160","queueDate":"2025-08-13T04:00:00+00:00","inService":"2026-05-31T04:00:00+00:00","negInService":"2026-08-15T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ROOSEVELT","summerNetMW":55.0,"winterNetMW":55.0,"dp1ErisMw":55.0,"dp1NrisMw":55.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397655,"projectNumber":"J4194","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-06-11T04:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Meeker","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"SHERBURNE CO","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397656,"projectNumber":"J3880","queueDate":"2025-02-10T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7NEWTON   - 7TANNER    345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397657,"projectNumber":"S1143","queueDate":"2026-01-20T22:17:08+00:00","inService":"2027-12-31T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"IL","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397658,"projectNumber":"S1169","queueDate":"2026-02-11T01:56:02+00:00","inService":"2027-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"BOGALUSA - TALISHEEK (LAGEN) 230.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397659,"projectNumber":"R5081","queueDate":"2025-12-22T21:54:30+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"","county":"Mower","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Adams","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397660,"projectNumber":"J3881","queueDate":"2025-02-10T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7NEWTON   - 7TANNER    345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397661,"projectNumber":"J3877","queueDate":"2025-01-03T05:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Pike","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397662,"projectNumber":"J4157","queueDate":"2025-10-03T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morrison","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Iron Ridge - Benton 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":97.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397663,"projectNumber":"J4205","queueDate":"2025-11-17T05:00:00+00:00","inService":"2025-06-16T04:00:00+00:00","transmissionOwner":"ENTERGY NEW ORLEANS, LLC","county":"Orleans","state":"LA","studyCycle":"0MW GIA","studyGroup":"NA","studyPhase":"","svcType":"ERIS","poiName":"Suillivan Station (Entergy0","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397664,"projectNumber":"J4166","queueDate":"2025-09-24T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-11-15T05:00:00+00:00","transmissionOwner":"","county":"Iberville","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Commodore 500 kV Substation,","summerNetMW":710.0,"winterNetMW":710.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397665,"projectNumber":"J4164","queueDate":"2025-09-29T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dane","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Madison 345/138 kV","summerNetMW":1203.0,"winterNetMW":1203.0,"dp1ErisMw":1203.0,"dp1NrisMw":1203.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397666,"projectNumber":"S1155","queueDate":"2026-03-13T23:38:42+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"","state":"MO","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397667,"projectNumber":"S1140","queueDate":"2026-03-07T03:12:54+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Clinton","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Calamus East","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397668,"projectNumber":"R5079","queueDate":"2025-11-25T05:41:17+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397669,"projectNumber":"S1160","queueDate":"2026-03-28T02:47:28+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"","state":"SD","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397670,"projectNumber":"S1137","queueDate":"2025-12-05T20:43:06+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397671,"projectNumber":"J4208","queueDate":"2025-12-20T03:36:56+00:00","inService":"2029-05-01T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397672,"projectNumber":"R5075","queueDate":"2025-12-15T08:35:54+00:00","inService":"2024-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397673,"projectNumber":"R5080","queueDate":"2025-12-19T02:34:46+00:00","inService":"2025-03-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Crooked Lake","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397674,"projectNumber":"R5095","queueDate":"2026-01-03T08:24:32+00:00","inService":"2024-05-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397675,"projectNumber":"R5077","queueDate":"2025-12-02T06:30:09+00:00","inService":"2026-08-03T04:00:00+00:00","transmissionOwner":"ITC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397676,"projectNumber":"S1161","queueDate":"2026-03-24T00:28:33+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"AR","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":625.0,"winterNetMW":625.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397677,"projectNumber":"J3497","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397678,"projectNumber":"J3624","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MAGNOLIA SOUTH - SHULER 115.0kV","summerNetMW":155.0,"winterNetMW":155.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397679,"projectNumber":"J3644","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397680,"projectNumber":"J3647","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-11-15T05:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON ROAD","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397681,"projectNumber":"J3643","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2024-11-04T05:00:00+00:00","inService":"2028-10-16T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REDSTONE - TITTABAWASSEE 138.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397682,"projectNumber":"J3645","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RAPSON","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397683,"projectNumber":"J3651","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEECHER - KNOWLES 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397684,"projectNumber":"J3827","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Mackinac","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Indian Lake - Hiawatha 138.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397685,"projectNumber":"J3311","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Landry","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WELLS","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397686,"projectNumber":"J4200","queueDate":"2025-09-30T04:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2008-03-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Ramsey","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"E-NRIS","poiName":"Merriam Park","summerNetMW":16.0,"winterNetMW":16.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hydro","facilityType":"Hydroelectric","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397687,"projectNumber":"J4198","queueDate":"2025-09-03T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Pana 138 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397688,"projectNumber":"J4196","queueDate":"2025-09-29T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Phillips","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GILLETT - ELAINE 115.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397689,"projectNumber":"S1105","queueDate":"2025-06-24T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Lonoke","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"KEO EHV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397690,"projectNumber":"J3878","queueDate":"2024-12-19T05:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jefferson","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7PR STATE - 7MTVERNW 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397691,"projectNumber":"J3882","queueDate":"2025-02-10T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Crawford","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4HUTSONVL - 4HEATH 138.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397692,"projectNumber":"J3883","queueDate":"2025-02-10T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Crawford","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4HUTSONVL - 4HEATH 138.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397693,"projectNumber":"J3879","queueDate":"2024-05-28T04:00:00+00:00","inService":"2030-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Jackson","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cayuga  - Hillsdale North 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397694,"projectNumber":"J3876","queueDate":"2025-02-06T05:00:00+00:00","withdrawnDate":"2025-12-31T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Lapeer","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397695,"projectNumber":"J3875","queueDate":"2025-02-06T05:00:00+00:00","withdrawnDate":"2025-12-31T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Lapeer","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397696,"projectNumber":"J3649","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-03-28T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Houghton","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Winona","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397697,"projectNumber":"J3650","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-15T05:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BEVERIDGE","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397698,"projectNumber":"J3375","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Washington","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Gerald Andrus 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397699,"projectNumber":"J3395","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Sangamon","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Andrew Bkr - Fancy Creek 69.0kV","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397700,"projectNumber":"J3455","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT","county":"Trinity","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ONALASKA","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397701,"projectNumber":"J3002","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Pine","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Arrowhead - Bear Creek (GRE) 230kV","summerNetMW":288.0,"winterNetMW":288.0,"dp1ErisMw":288.0,"dp1NrisMw":243.75,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397702,"projectNumber":"J2930","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"","county":"Henderson","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397703,"projectNumber":"J2920","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"1673  Interconnection Substation","summerNetMW":92.0,"winterNetMW":92.0,"dp1ErisMw":92.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397704,"projectNumber":"J2927","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tibbs","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397705,"projectNumber":"J3033","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Webster","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reid EHV 345 kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397706,"projectNumber":"J2942","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"Cooper to Penton Road 230 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397707,"projectNumber":"J3035","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-04T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Desha","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"REED SS - ROHWER 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397708,"projectNumber":"J2966","queueDate":"2022-09-08T04:00:00+00:00","inService":"2025-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Quitman","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Batesville to Moon Lake ss 230kV Line","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":450.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397709,"projectNumber":"J3061","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lawrence","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Walnut Ridge (Bus #338208) to Sedgewick (Bus #338206) 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397710,"projectNumber":"J3518","queueDate":"2024-04-19T04:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Gasconade","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BLAND","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3397711,"projectNumber":"J3310","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Lincoln","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BROOKHAVEN","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397712,"projectNumber":"R5078","queueDate":"2025-12-19T02:33:54+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397713,"projectNumber":"J4210","queueDate":"2026-02-06T05:56:29+00:00","inService":"2030-01-06T05:00:00+00:00","transmissionOwner":"ITC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397714,"projectNumber":"J3520","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4WEEDMAN  - 4MAHOMET 1 138.0kV","summerNetMW":215.0,"winterNetMW":215.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397715,"projectNumber":"J3519","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-10-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Quiver","summerNetMW":199.9,"winterNetMW":199.9,"dp1ErisMw":200.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397716,"projectNumber":"J3646","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ST. CLAIR","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397717,"projectNumber":"J3648","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-02-13T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Baraga","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Silver River - Perch Lake 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397718,"projectNumber":"J3341","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"J2192 POI","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397719,"projectNumber":"J3360","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Morgan","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Meredosia","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397720,"projectNumber":"J3397","queueDate":"2024-03-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Rock","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"Magnolia","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397721,"projectNumber":"J3350","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Randolph","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5MOBERLY  - 5OVERTON  161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397722,"projectNumber":"J3396","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Scott","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Winchester - Hillview Tap 69.0kV","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397723,"projectNumber":"J2938","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Knox","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4MONM BLVD W - 4CASTRO_JCT 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397724,"projectNumber":"J2951","queueDate":"2022-09-05T04:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Union","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"Creston Roadhouse","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397725,"projectNumber":"J2941","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Macon Lake SS - Lake Chicot Pump STA 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397726,"projectNumber":"J3019","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Feliciana","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Fancy Point to Port Hudson 230 kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397727,"projectNumber":"J3454","queueDate":"2024-04-13T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397728,"projectNumber":"J2934","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Thetford to Murphy 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397729,"projectNumber":"J2998","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fayetteville Bee Hollow Road 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397730,"projectNumber":"J2975","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bevil Substation 230 kV","summerNetMW":44.1,"winterNetMW":44.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397731,"projectNumber":"J2946","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Dubuque","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Salem - Hickory Creek 345 kV line","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397732,"projectNumber":"J3010","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-09-27T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clay","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"TAP ON THE CARBON TO BRAZIL 69KV LINE","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397733,"projectNumber":"J3009","queueDate":"2022-08-25T04:00:00+00:00","inService":"2025-05-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"VOYAGER","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397734,"projectNumber":"J2944","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rocky Run - Gardner Park 345.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":350.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397735,"projectNumber":"J2977","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Bradley","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC Hermitage south- Hilo 115Kv","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397736,"projectNumber":"J2958","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Claiborne","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Haynesville South 115kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397737,"projectNumber":"J2960","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Spencer","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"10CULY13 253500 (F.B. Culley ) - 10AEP_T  353586 (tap between Culley (10CULY13 253500) - Grandview (","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397738,"projectNumber":"J3052","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"1990-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MCV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Steam Turbine (including Nuclear, Geothermal and Solar Steam)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397739,"projectNumber":"J2985","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"","county":"Chicot","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"AECC CHICOT - EUDORA 115.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397740,"projectNumber":"J3012","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"","county":"Coles","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Mattoon East","summerNetMW":287.0,"winterNetMW":287.0,"dp1ErisMw":287.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397741,"projectNumber":"J3349","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ipava","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397742,"projectNumber":"J3373","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"HARRISBURG SS - HARRISBURG 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397743,"projectNumber":"J3032","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sarepta","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397744,"projectNumber":"J3021","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lyon","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Lake Yankton to Lyon County 115kV","summerNetMW":235.0,"winterNetMW":235.0,"dp1ErisMw":235.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397745,"projectNumber":"J2961","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Daviess","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport Station (08EDWRDS  249722) - Whitefield (08WHTFLD  249876) 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397746,"projectNumber":"J3058","queueDate":"2025-07-28T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"TARLETON","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397747,"projectNumber":"J3063","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7JORD - 7CMDR 345.0kV","summerNetMW":143.0,"winterNetMW":143.0,"dp1ErisMw":143.0,"dp1NrisMw":143.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397748,"projectNumber":"J3066","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Osceola","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hersey Interconnection","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397749,"projectNumber":"J3374","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"RITCHIE SWYD - TARLETON 230.0kV","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397750,"projectNumber":"J3380","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cleveland","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC PINEBERGEN - AECC GLENDALE 115.0kV","summerNetMW":155.0,"winterNetMW":155.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397751,"projectNumber":"J3069","queueDate":"2022-09-02T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-12-27T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B)","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397752,"projectNumber":"J3050","queueDate":"2025-07-29T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MAJESTIC - ONEIDA 345.0kV","summerNetMW":255.0,"winterNetMW":255.0,"dp1ErisMw":255.0,"dp1NrisMw":255.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397753,"projectNumber":"J3055","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BOGALUSA 500 SS - FRANKLIN EHV 500.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397754,"projectNumber":"J3056","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BOGALUSA 500 SS - FRANKLIN EHV 500.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397755,"projectNumber":"J3394","queueDate":"2024-04-16T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ville Platte - West Fork 230.0kV","summerNetMW":155.6,"winterNetMW":155.6,"dp1ErisMw":155.6,"dp1NrisMw":155.6,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397756,"projectNumber":"J3398","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Greene","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Walkerville - Eldred 69.0kV","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3397757,"projectNumber":"J3401","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DELL EHV - SAN SOUCI 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":490.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3397758,"projectNumber":"J2947","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)","summerNetMW":205.0,"winterNetMW":205.0,"dp1ErisMw":205.0,"dp1NrisMw":205.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397759,"projectNumber":"J2921","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","transmissionOwner":"","county":"Calhoun","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397760,"projectNumber":"J3017","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Grant","state":"SD","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South 345 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397761,"projectNumber":"J3075","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Merom Primary - Worthington Primary 345.0kV","summerNetMW":560.0,"winterNetMW":560.0,"dp1ErisMw":560.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397762,"projectNumber":"J3076","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Wabash","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"08GIBSON (PSI) - 7ALBION   345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397763,"projectNumber":"J3077","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-11-30T05:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Gibson","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Francisco 345/138kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397764,"projectNumber":"J3122","queueDate":"2022-09-14T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marked Tree â€“ Marion 161kV Tap at 35.3902, -90.3372","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397765,"projectNumber":"J3099","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-27T04:00:00+00:00","inService":"2027-06-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Faulkner","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Hamlet to Gravel Ridge 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397766,"projectNumber":"J3155","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Winnebago","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Neevin","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397767,"projectNumber":"J3036","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"REMINGTON SS - LONOKE EAST 115.0kV","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397768,"projectNumber":"J2987","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Merom Primary - Worthington Primary 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397769,"projectNumber":"J2997","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COLFAX - MADRID 120.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397770,"projectNumber":"J3006","queueDate":"2025-07-29T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Milwaukee","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Granville345kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397771,"projectNumber":"J3038","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado Upland SS 115kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397772,"projectNumber":"J2974","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Adams","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4HULL     - 4HERLEMAN 138.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397773,"projectNumber":"J3093","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"LAKEOVER EHV - MCADAMS EHV 500.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397774,"projectNumber":"J3158","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Colby 345 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397775,"projectNumber":"J3034","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-08-04T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BRINKLEY WEST - BRINKLEY EAST 115kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397776,"projectNumber":"J2968","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"LC Bulk to Henning 138kV Line (Circuit 28)","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397777,"projectNumber":"J3057","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Richard (Bus #335366) to Colonial Academy (Bus #335375) 138kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397778,"projectNumber":"J3053","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"LAKEOVER EHV - MCADAMS EHV 500.0kV","summerNetMW":169.0,"winterNetMW":169.0,"dp1ErisMw":169.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397779,"projectNumber":"J3062","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Edwards to Bolton 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397780,"projectNumber":"J3073","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"INDEPENDENCE-ISES - POWERLINE ROAD 500 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397781,"projectNumber":"J3054","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2017-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bogslusa 500 kV - Franklin EHV 500 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397782,"projectNumber":"J3074","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"4TIBBS - 4STEELEVLE N 138.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397783,"projectNumber":"J3045","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Orange","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Chisholm RD- Hartburg 230kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397784,"projectNumber":"J3215","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-07-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Stillwell to Babcock 345kV Transmission Line","summerNetMW":500.0,"winterNetMW":594.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397785,"projectNumber":"J3154","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blackhawk (MEC) - Quinn 345 (shared POI with J2892)","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397786,"projectNumber":"J3207","queueDate":"2022-03-10T05:00:00+00:00","inService":"2024-05-06T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Starke","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"J3578","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397787,"projectNumber":"J3068","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-04-17T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Helena","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Amite (A) - Gillsburg (B) 115kV TL","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397788,"projectNumber":"J3048","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crawford","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MOSES SES to AECC HUNTER NORTH","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397789,"projectNumber":"J3047","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Adair","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ORIENT - NORTHBORO 345.0kV","summerNetMW":263.0,"winterNetMW":263.0,"dp1ErisMw":263.0,"dp1NrisMw":263.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397790,"projectNumber":"J3071","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Entergy Hughes - Forest City South 161 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397791,"projectNumber":"J3200","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Turkey Hill 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397792,"projectNumber":"J3098","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Franklin","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7)","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397793,"projectNumber":"J3163","queueDate":"2022-07-26T04:00:00+00:00","inService":"2028-03-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BISON","summerNetMW":481.0,"winterNetMW":481.0,"dp1ErisMw":481.0,"dp1NrisMw":481.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397794,"projectNumber":"J3151","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sheboygan Falls","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397795,"projectNumber":"J3196","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-02-27T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Starke","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Burr Oak to East Winamac 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397796,"projectNumber":"J3089","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2029-04-30T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Webster","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reid EHV","summerNetMW":696.0,"winterNetMW":696.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397797,"projectNumber":"J3049","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"LAKEOVER EHV - MCADAMS EHV 500.0kV","summerNetMW":188.0,"winterNetMW":188.0,"dp1ErisMw":188.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397798,"projectNumber":"J3064","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-20T04:00:00+00:00","transmissionOwner":"","county":"Perry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7JORD - 7CMDR 345.0kV","summerNetMW":157.0,"winterNetMW":157.0,"dp1ErisMw":157.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397799,"projectNumber":"J3164","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Ouachita","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"McClellan 138 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397800,"projectNumber":"J3165","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-08-31T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Breckinridge","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"New Hardinsburg","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397801,"projectNumber":"J3072","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-27T04:00:00+00:00","inService":"2024-12-30T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Wilkinson","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Woodviille - Centreville 115 kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397802,"projectNumber":"J3065","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-03-30T04:00:00+00:00","transmissionOwner":"METC","county":"Oceana","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DONALDSON CREEK","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":20.0,"dp1NrisMw":20.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397803,"projectNumber":"J3156","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Townline Road","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397804,"projectNumber":"J3159","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Dubuque","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gardner 69 kV substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397805,"projectNumber":"J3208","queueDate":"2022-09-08T04:00:00+00:00","inService":"2023-09-22T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Dubois","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Patoka Valley","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":10.0,"dp1NrisMw":10.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397806,"projectNumber":"J3097","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-08-29T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Entergy Mississippi Gillsburg Tap - Gillsburg on the Amite - Gillsburg115 kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397807,"projectNumber":"J3222","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Moultrie","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Arland to Faraday 345 kV Line Tap","summerNetMW":109.0,"winterNetMW":109.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397808,"projectNumber":"J3087","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan","state":"TX","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Shockey","summerNetMW":204.6,"winterNetMW":204.6,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397809,"projectNumber":"J3111","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC TRUMANN WEST - POWERLINE ROAD 161kv","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397810,"projectNumber":"J3112","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Barton - West Helena 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397811,"projectNumber":"J3113","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2022-12-06T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397812,"projectNumber":"J3117","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397813,"projectNumber":"J3152","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Green","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Monroe","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397814,"projectNumber":"J3153","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Beaver Channel 161 kV Substation","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Piston (Engine), Internal Combustion (Diesel)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397815,"projectNumber":"J3157","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Winnebago","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"Bison","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397816,"projectNumber":"J3204","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Clark","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stone Lake - Gardner Park 345.0kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":190.0,"dp1NrisMw":190.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397817,"projectNumber":"J3166","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport Station IGCC","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397818,"projectNumber":"J3168","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REYNOLDS","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397819,"projectNumber":"J3088","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-02-01T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Woodbury","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Raun to Sioux City","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397820,"projectNumber":"J3167","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ipava 138 kV Substation","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397821,"projectNumber":"J3096","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reid 161 kV to Henderson 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397822,"projectNumber":"J3086","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Peoria","state":"TX","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"New 345kV switchyard, looping in the Fargo-Sandburg 345kV","summerNetMW":252.96,"winterNetMW":252.96,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397823,"projectNumber":"J3085","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Madison","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fredericktown 138 kV Substation","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397824,"projectNumber":"J3082","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"","county":"Franklin","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping the 'Gilbert / 3GILBERT_LA (303322)' to 'Winnsboro / 3WINNSBORO! (337330)' 115kV line.","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":135.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397825,"projectNumber":"J3083","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Pointe Coupee","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"WATERLOO - FANCY POINT 230.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397826,"projectNumber":"J3115","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Sharkey","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping the 'Onward / 3ONWARD+ (336967)' to 'Rolling Fork / 3ROLING FRK! (336968)' 115kV line","summerNetMW":216.0,"winterNetMW":216.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397827,"projectNumber":"J3108","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Jasper","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Missionary 161kV Substation","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397828,"projectNumber":"J3114","queueDate":"2025-11-13T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sandborn Primary - Worthington Primary 161.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397829,"projectNumber":"J3119","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2022-12-06T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Pulaski","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397830,"projectNumber":"J3211","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J1564 Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397831,"projectNumber":"J3230","queueDate":"2022-09-14T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PARKIN - GILMORE 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397832,"projectNumber":"J2626","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"345kV Commodore to Jordan","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397833,"projectNumber":"J3110","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Powerline Road / 8POWERLN_RD% (338156) 500kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397834,"projectNumber":"J3120","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping 'Newport AB / NEWPORTSOLAR (338177)' to 'Cash / 5CASH (338171)' 161kV Line.","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397835,"projectNumber":"J3210","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Tammany","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J2245 Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397836,"projectNumber":"J3198","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-07-29T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Barron","state":"WI","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Barron","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397837,"projectNumber":"J3107","queueDate":"2025-10-23T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Johnson","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Enron Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397838,"projectNumber":"J2616","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Scanlan (Cajun) to Bosco SS 138 kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397839,"projectNumber":"J2622","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Drew","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wilmar to Monticello South 115 kV","summerNetMW":107.0,"winterNetMW":107.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397840,"projectNumber":"J2619","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Montcalm","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Kenowa to Nelson Rd. 345kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397841,"projectNumber":"J2562","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-11-20T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dewitt - Deluce","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397842,"projectNumber":"J2629","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Newton","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Leach to Newton Bulk 138 kV Line","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397843,"projectNumber":"J2621","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"St. Croix","state":"WI","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pine Lake 161 kV Substation","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397844,"projectNumber":"J2659","queueDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-20T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Turner","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397845,"projectNumber":"J2656","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"","county":"Macon","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"4LATHAM-4N DEC E 138 kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397846,"projectNumber":"J2657","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"REYNOLDS - BURR OAK 345.0kV","summerNetMW":138.0,"winterNetMW":138.0,"dp1ErisMw":138.0,"dp1NrisMw":138.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397847,"projectNumber":"J2578","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Tuscola","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"KARN - THETFORD (ATLANTA) 138.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397848,"projectNumber":"J2567","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Oceana","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"KENOWA - LUDINGTON 345.0kV","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":240.0,"dp1NrisMw":240.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397849,"projectNumber":"J2568","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Acadia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Habetz - Sellers Road 138 kV Line","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397850,"projectNumber":"J2572","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Hamilton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Noblesville (Duke) - Hortonville (Duke) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397851,"projectNumber":"J3116","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397852,"projectNumber":"J3118","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397853,"projectNumber":"J3105","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Amite","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Franklin EHV -  McKnight 500 kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397854,"projectNumber":"J2580","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Winn","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Montgomery to Winnfield 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397855,"projectNumber":"J2620","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ouachita","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bearden to Camden North 115 kV","summerNetMW":164.0,"winterNetMW":164.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397856,"projectNumber":"J2623","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"H.S. EHV to Friendship 115 kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397857,"projectNumber":"J2663","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reynolds - Burr Oak 345 kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397858,"projectNumber":"J2615","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Warren","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FB Culley to Dubois Transmission Line","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397859,"projectNumber":"J2618","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Macomb","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lenox 120kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397860,"projectNumber":"J2666","queueDate":"2024-01-09T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Brick Church 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397861,"projectNumber":"J2586","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SPEED 345","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397862,"projectNumber":"J2685","queueDate":"2025-08-21T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sharkey","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"ROLLING FORK","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397863,"projectNumber":"J2690","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"","county":"Washington","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397864,"projectNumber":"J2701","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COLONIAL WELSH 138","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397865,"projectNumber":"J2703","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Scott","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Meredosia 345 kV","summerNetMW":398.0,"winterNetMW":398.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397866,"projectNumber":"J2723","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Vermillion","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"EAST WINAMAC-MONTICELLO 138kV","summerNetMW":249.0,"winterNetMW":249.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397867,"projectNumber":"J3080","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-08-29T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ameren owned Kelso - Joppa (Massac) 345 kV Tie-Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397868,"projectNumber":"J3101","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-06-13T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Shaw-Indianola 115kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Wind","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397869,"projectNumber":"J3197","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-12-22T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EAST LEESVILLE -RODEMACHER 230","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397870,"projectNumber":"J2563","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"crandal","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397871,"projectNumber":"J2587","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Edgar","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sugar Creek - Cayuga CT  345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397872,"projectNumber":"J2693","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"","county":"Franklin","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WISNER","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":105.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397873,"projectNumber":"J2700","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"138 kV LAKE CHARLES BULK","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397874,"projectNumber":"J2702","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ipava-Macomb, West-1429 138 kV","summerNetMW":100.8,"winterNetMW":100.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397875,"projectNumber":"J2706","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 500 kV (181.1,503.0)","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397876,"projectNumber":"J2733","queueDate":"2025-09-05T04:00:00+00:00","withdrawnDate":"2025-11-03T05:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lawrence","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SWIFTON - AECC HOXIE SOUTH 161.0kV","summerNetMW":126.0,"winterNetMW":126.0,"dp1ErisMw":126.0,"dp1NrisMw":126.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397877,"projectNumber":"J2724","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7NEOGA-7HOLLAND 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397878,"projectNumber":"J2712","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Clinton 230","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397879,"projectNumber":"J2612","queueDate":"2023-09-07T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Flora 115kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397880,"projectNumber":"J2658","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-23T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CASEY-7NEWTON 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397881,"projectNumber":"J2660","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-23T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CASEY-7NEWTON 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397882,"projectNumber":"J2661","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7Xenia- 7MT Vrnon 345 KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397883,"projectNumber":"J2662","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"","county":"Cumberland","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CASEY    - 7NEWTON   345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397884,"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Ripley","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Batesville 138kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397885,"projectNumber":"J2715","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ACADIA - COLONIAL ACADEMY CO 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397886,"projectNumber":"J2726","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Montgomery","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7Enon- 7Montgmry 345 KV","summerNetMW":248.0,"winterNetMW":248.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397887,"projectNumber":"J2831","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Natchitoches","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Colfax-Rodemacher 230 kV","summerNetMW":36.0,"winterNetMW":36.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hydro","facilityType":"Hydroelectric","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397888,"projectNumber":"J2769","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Helena","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Amite - Gillsburg Tap 115 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397889,"projectNumber":"J2752","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Montgomery","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"ELLIOTT SS - SAWYER SS (CE) 115.0kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397890,"projectNumber":"J2754","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Polk","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"138kV Bragg - SHECO Menard Line","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397891,"projectNumber":"J2582","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Speed 138 kV substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397892,"projectNumber":"J2592","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Tuscola","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Thetford (Atlanta) - Karn 138 kV line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397893,"projectNumber":"J2585","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Worthington Primary - Merom Primary 345 kV line","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397894,"projectNumber":"J2588","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"TOMPKINS - VROOMAN 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397895,"projectNumber":"J2725","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marquette - North Belding 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397896,"projectNumber":"J2727","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pickens - Midway SS (CE) 115kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397897,"projectNumber":"J2589","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Jackson","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"TOMPKINS - VROOMAN 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397898,"projectNumber":"J2590","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stein - Rapson 345 kV line","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397899,"projectNumber":"J2709","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DEEDSVILLE 345","summerNetMW":228.0,"winterNetMW":228.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397900,"projectNumber":"J2711","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Porter","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FLINT LAKE - SOUTH VALPARAISO 138 kV","summerNetMW":122.0,"winterNetMW":122.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397901,"projectNumber":"J2728","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-07-24T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Freeborn","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Glenworth","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397902,"projectNumber":"J2881","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC PINEBERGEN - AECC GLENDALE 115.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397903,"projectNumber":"J2750","queueDate":"2025-08-21T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"","county":"Phillips","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"RITCHIE SWYD - TARLETON 230.0kV","summerNetMW":197.5,"winterNetMW":197.5,"dp1ErisMw":197.5,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397904,"projectNumber":"J2768","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Shelby SS - Roundaway SS (CE) 115 kV Line","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397905,"projectNumber":"J2875","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"","county":"Presque Isle","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hagensville 138 kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397906,"projectNumber":"J2877","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MURPHY - TITTABAWASSEE 345.0kV","summerNetMW":129.0,"winterNetMW":129.0,"dp1ErisMw":129.0,"dp1NrisMw":129.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397907,"projectNumber":"J2863","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-20T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Fillmore","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397908,"projectNumber":"J2844","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"","county":"Henderson","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397909,"projectNumber":"J2664","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cayuga Sta - Nucor 345 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397910,"projectNumber":"J2614","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Henry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mercer 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397911,"projectNumber":"J2713","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mercer","state":"IL","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"OAK GROVE - MERCER CO (AMRN)","summerNetMW":47.6,"winterNetMW":47.6,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397912,"projectNumber":"J2714","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Eunice","summerNetMW":162.0,"winterNetMW":162.0,"dp1ErisMw":162.0,"dp1NrisMw":130.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397913,"projectNumber":"J2617","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Palisades to Argenta 345 kV","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397914,"projectNumber":"J2625","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Marion","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Maywood 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397915,"projectNumber":"J2647","queueDate":"2022-09-14T04:00:00+00:00","inService":"2028-02-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Franklin","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"West Frankfort East 345 kV (7E W FKFT)","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397916,"projectNumber":"J2564","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"138kV Crawfordsville","summerNetMW":18.9,"winterNetMW":18.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397917,"projectNumber":"J2721","queueDate":"2023-10-19T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Panola","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Senatobia-Sardis 115 kV Line","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397918,"projectNumber":"J2732","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"METC","county":"Ogemaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gallagher to Twinning 138kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397919,"projectNumber":"J2683","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"New Substation on Rye  Co - Cypress 138 kV (Same POI as J2071)","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397920,"projectNumber":"J2731","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-07-24T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Maple Leaf","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397921,"projectNumber":"J2720","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-04-25T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Yazoo","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MIDWAY SS (CE) - YAZOO CITY SS 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397922,"projectNumber":"J2696","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS INC. EAI","county":"Mississippi","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sandy Bayou","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397923,"projectNumber":"J2699","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Carroll","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"115 kV DARNELL","summerNetMW":58.1,"winterNetMW":58.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397924,"projectNumber":"J2704","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"","county":"Ouachita","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cargas","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":219.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397925,"projectNumber":"J2876","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2026-03-12T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Arenac","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Whittemore to Twining 138 kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397926,"projectNumber":"J2862","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Bradley","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC Hermitage South-Hilo 115kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397927,"projectNumber":"J2878","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2026-03-12T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GREENWOOD - RAPSON 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397928,"projectNumber":"J2818","queueDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ouachita","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC CAMDEN SOUTH - STEPHENS 115.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397929,"projectNumber":"J2864","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Nevada","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"McNeil EHV to Etta EHV 500kV","summerNetMW":375.0,"winterNetMW":375.0,"dp1ErisMw":375.0,"dp1NrisMw":375.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397930,"projectNumber":"J2819","queueDate":"2025-10-27T04:00:00+00:00","inService":"2025-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Red River","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RINGGOLD - CARROLL (CLECO) 115.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397931,"projectNumber":"J2705","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Assumption","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NAPOLEONVILLE 115 kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397932,"projectNumber":"J2707","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Assumption","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PAINCOURTVILLE 115 kV","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397933,"projectNumber":"J2865","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ouachita","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado EHV - McNeil EHV 500kV","summerNetMW":375.0,"winterNetMW":375.0,"dp1ErisMw":375.0,"dp1NrisMw":375.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397934,"projectNumber":"J2821","queueDate":"2022-09-08T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Crittenden","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sullivan - Marion Jct 69 kV","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397935,"projectNumber":"J2791","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"LAFAYETTE UTILITIES SYSTEM","county":"Lafayette","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Doc Bonin 69kV","summerNetMW":243.1,"winterNetMW":243.1,"dp1ErisMw":243.1,"dp1NrisMw":243.1,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397936,"projectNumber":"J2861","queueDate":"2022-09-13T04:00:00+00:00","inService":"2029-08-31T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Mower","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rochester 161kV (A) to Adams 161kV (B)","summerNetMW":147.0,"winterNetMW":147.0,"dp1ErisMw":147.0,"dp1NrisMw":147.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397937,"projectNumber":"J2822","queueDate":"2022-09-08T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PALISADES - VERGENNES 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397938,"projectNumber":"J2824","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Yazoo","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Picken - Midway SS (CE) 115 kV","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397939,"projectNumber":"J2708","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"","county":"Ouachita","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cargas","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":219.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397940,"projectNumber":"J2710","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Clinton","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Mulliken Jct.- Chester 69 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397941,"projectNumber":"J2893","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-08-18T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DURANT - BOWLING GREEN SS 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397942,"projectNumber":"J2762","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-13T04:00:00+00:00","inService":"2025-11-05T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4TAZEWELL-4FLINT 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397943,"projectNumber":"J2730","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-07-24T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Jackson","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Jackson North 161kV Substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397944,"projectNumber":"J2734","queueDate":"2025-07-28T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GILMORE - WILSON 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397945,"projectNumber":"J2903","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-02-01T05:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Lincoln","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397946,"projectNumber":"J2904","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PLANTATION","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397947,"projectNumber":"J2830","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Jennings","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Brewersville - Dabney 69kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397948,"projectNumber":"J2832","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Carroll","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Darnell - Tallulah 115 kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397949,"projectNumber":"J2736","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rosedale to Stringtown 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397950,"projectNumber":"J2889","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Argenta 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397951,"projectNumber":"J2806","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Warren","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Warrenton 161kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397952,"projectNumber":"J2835","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Jefferson","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Madison - Scottsburg 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397953,"projectNumber":"J2788","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-08-07T04:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dayton 120kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397954,"projectNumber":"J2905","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Washington","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HOLLANDALE - NITTA YUMA SS (CE) 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397955,"projectNumber":"J2751","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"STRINGTOWN","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397956,"projectNumber":"J2753","queueDate":"2025-08-21T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"","county":"East Carroll","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"DARNELL - TALLULAH 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397957,"projectNumber":"J2871","queueDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"","county":"Mississippi","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":70.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397958,"projectNumber":"J2765","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"West Carroll","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Darnell 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397959,"projectNumber":"J2784","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-11-03T05:00:00+00:00","inService":"2026-07-20T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Sangamon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Turner 345kv Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397960,"projectNumber":"J2785","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado - Sheridan 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397961,"projectNumber":"J2800","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-09-29T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EL DORADO EHV - SAREPTA 345/115KV SW STA 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397962,"projectNumber":"J2820","queueDate":"2022-09-08T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Daviess","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bon Harbor Tap-Stanley Tap 69kv","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397963,"projectNumber":"J2885","queueDate":"2022-09-06T04:00:00+00:00","inService":"2025-01-10T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Red Lake","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Plummer Pipe","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":130.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397964,"projectNumber":"J2817","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT","county":"Liberty","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Batiste Creek 230kV Substation","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397965,"projectNumber":"J2867","queueDate":"2022-09-12T04:00:00+00:00","inService":"2029-08-31T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Wabasha","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lake City (A) to Zumbro Falls (B)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397966,"projectNumber":"J2827","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Norrell 230kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397967,"projectNumber":"J2816","queueDate":"2022-09-08T04:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"","county":"Ouachita","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"RILLA - RIVERTON 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397968,"projectNumber":"J2866","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Nevada","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"McNeil 500kV (A) to Etta 500kV (B)","summerNetMW":375.0,"winterNetMW":375.0,"dp1ErisMw":375.0,"dp1NrisMw":375.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397969,"projectNumber":"J2823","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Jefferson","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Madison West 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397970,"projectNumber":"J2825","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Panola","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COMO - CRENSHAW 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397971,"projectNumber":"J2828","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"L.R. 145th St - Wrightsville 115kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397972,"projectNumber":"J2789","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-08T05:00:00+00:00","inService":"2025-11-05T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4NEWTON-4ROBNSNAM 138kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397973,"projectNumber":"J2833","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Wood","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sigel - Auburndale Tap (Y-107) 69kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397974,"projectNumber":"J2882","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cooper-Penton Road 230kV","summerNetMW":410.0,"winterNetMW":410.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397975,"projectNumber":"J2790","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-13T04:00:00+00:00","inService":"2026-02-05T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7Pana-7Austin 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397976,"projectNumber":"J2890","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lake Charles Bulk 138kV Substation","summerNetMW":440.0,"winterNetMW":440.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397977,"projectNumber":"J2838","queueDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"","county":"Richland","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DUNN - OAK RIDGE (LA) 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397978,"projectNumber":"J2912","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Mercer","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Coyote Switchyard 345kV Substation","summerNetMW":347.0,"winterNetMW":347.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397979,"projectNumber":"J2834","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Fond du Lac","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"South Fond du Lac - North Fond du Lac 69kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397980,"projectNumber":"J2884","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cooper to Penton Road 230kV","summerNetMW":276.0,"winterNetMW":276.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397981,"projectNumber":"J2837","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Jennings","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"North Vernon - Madison 138 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397982,"projectNumber":"J2911","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Penton 230KV Substation","summerNetMW":810.0,"winterNetMW":810.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397983,"projectNumber":"J2782","queueDate":"2022-09-07T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"KENTLAND-MOROCCO 69kV","summerNetMW":38.0,"winterNetMW":38.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397984,"projectNumber":"J2795","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lincoln","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DOWNSVILLE","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397985,"projectNumber":"J2868","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-04T04:00:00+00:00","inService":"2026-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Jackson","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Alma Center- Merrillan (DCP) 69 KV","summerNetMW":46.2,"winterNetMW":46.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397986,"projectNumber":"J2763","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"CLEVELAND/SOUTH - STEINER (CE) 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397987,"projectNumber":"J2919","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kokomo Webster St. to Walton 230 kV","summerNetMW":142.59,"winterNetMW":142.59,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397988,"projectNumber":"J2774","queueDate":"2024-08-20T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2026-07-20T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Ionia","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397989,"projectNumber":"J2815","queueDate":"2022-08-30T04:00:00+00:00","inService":"2025-02-15T05:00:00+00:00","negInService":"2026-02-14T05:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ARGENTA - VERONA 138.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397990,"projectNumber":"J2805","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"VEEDERSBURG WEST 230 Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397991,"projectNumber":"J2857","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Banks SS (CE) - Hambrick SS (CE) 115 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397992,"projectNumber":"J2780","queueDate":"2023-10-05T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Pulaski","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STARKE (Actual POI is on ASPHALTUM to MEDARYVILLE 69kV Circuit 6919 an appendix  G facility)","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397993,"projectNumber":"J2888","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lafayette","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Baxter Wilson SES SWYD 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397994,"projectNumber":"J2870","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-12-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sawyer","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STONE LAKE","summerNetMW":243.6,"winterNetMW":243.6,"dp1ErisMw":243.6,"dp1NrisMw":243.6,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397995,"projectNumber":"J2764","queueDate":"2025-07-24T04:00:00+00:00","inService":"2025-12-06T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Craighead","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"JONESBORO (APL) - CASH 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397996,"projectNumber":"J2759","queueDate":"2023-09-12T04:00:00+00:00","inService":"2029-02-15T05:00:00+00:00","transmissionOwner":"","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397997,"projectNumber":"J2880","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397998,"projectNumber":"J2874","queueDate":"2022-08-31T04:00:00+00:00","inService":"2025-11-15T05:00:00+00:00","negInService":"2026-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HAMPTON","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":85.0,"dp1NrisMw":85.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3397999,"projectNumber":"J2793","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Muddy","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398000,"projectNumber":"J2757","queueDate":"2025-10-17T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Cherokee","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"LITTLE SIOUX - CLIPPER 161.0kV","summerNetMW":160.3,"winterNetMW":160.3,"dp1ErisMw":160.3,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398001,"projectNumber":"J2787","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-27T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BRINKLEY EAST-AECC AUBREY 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398002,"projectNumber":"J2792","queueDate":"2022-08-31T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Persimmon Mill--Red Gum  115kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398003,"projectNumber":"J2907","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-26T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sheridan 500 kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":400.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398004,"projectNumber":"J2839","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ascension","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Donaldsonville to Evergreen 230 kV line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398005,"projectNumber":"J2814","queueDate":"2022-09-07T04:00:00+00:00","inService":"2026-02-15T05:00:00+00:00","negInService":"2027-03-27T04:00:00+00:00","transmissionOwner":"METC","county":"Kalamazoo","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ARGENTA - MORROW 138.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398006,"projectNumber":"J2891","queueDate":"2024-01-09T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398007,"projectNumber":"J2797","queueDate":"2025-10-25T04:00:00+00:00","inService":"2026-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"White","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Norris City North","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398008,"projectNumber":"J2840","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Byron 161 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398009,"projectNumber":"J2799","queueDate":"2025-10-25T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ARGENTA - PALISADES 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398010,"projectNumber":"J2906","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Kalamazoo","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Jaguar 138kV substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398011,"projectNumber":"J2846","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Pulaski","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reynolds--Burr Oak 345kV line","summerNetMW":700.0,"winterNetMW":700.0,"dp1ErisMw":700.0,"dp1NrisMw":700.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398012,"projectNumber":"J2848","queueDate":"2025-11-19T05:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Hamilton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Noblesville  - Fall Creek (AEP) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398013,"projectNumber":"J2908","queueDate":"2022-07-27T04:00:00+00:00","inService":"2023-07-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Morgan","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"E-NRIS","poiName":"Jacksonville North","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":30.0,"dp1NrisMw":30.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398014,"projectNumber":"J2860","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Roy S Nelson - DeRidder Mill 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398015,"projectNumber":"J2854","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"White","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Griffithville - SERCY Price 115 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398016,"projectNumber":"J2851","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2022-12-09T05:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Walker","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rocky Creek","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398017,"projectNumber":"J2794","queueDate":"2022-08-23T04:00:00+00:00","inService":"2029-12-27T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"A Tap on Kinmundy-Otego 138kv line","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398018,"projectNumber":"J2859","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-11-20T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC KEO-BAUCUM 115 kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398019,"projectNumber":"J2886","queueDate":"2022-09-15T04:00:00+00:00","inService":"2029-09-17T04:00:00+00:00","transmissionOwner":"","county":"Sangamon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4Auburn N-4Jacksnvl 138kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":115.0,"dp1NrisMw":115.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398020,"projectNumber":"J2812","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Hillsdale","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MOORE ROAD","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398021,"projectNumber":"J2849","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Pulaski","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reynolds--Burr Oak 345kV line","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":245.0,"dp1NrisMw":245.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398022,"projectNumber":"J2856","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2024-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Jefferson","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Franklin EHV - Grand Gulf Transmission 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398023,"projectNumber":"J2786","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-07-01T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ARGENTA - TALLMADGE 345.0kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398024,"projectNumber":"J2813","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-02-15T05:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Slate Goss 345 KV Line","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398025,"projectNumber":"J2853","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-08-30T04:00:00+00:00","transmissionOwner":"CITY WATER LIGHT & POWER","county":"Sangamon","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Westchester 138 kV station - PSSE bus 343513","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398026,"projectNumber":"J2917","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"","county":"Ouachita","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PRAIRIE ROAD","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398027,"projectNumber":"J2916","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"East Leesville-Rodemacher 230 KV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398028,"projectNumber":"J2910","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-22T04:00:00+00:00","inService":"2026-06-14T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Chambers","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Stowell 230kV","summerNetMW":303.0,"winterNetMW":303.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398029,"projectNumber":"J2767","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-08-04T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hightower - Rye 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398030,"projectNumber":"J2918","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"","county":"Jasper","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4EFFINGHM N - 4NEWTON 138kV","summerNetMW":97.0,"winterNetMW":97.0,"dp1ErisMw":97.0,"dp1NrisMw":25.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398031,"projectNumber":"J2781","queueDate":"2022-09-07T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Jasper","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398032,"projectNumber":"J2783","queueDate":"2022-09-07T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Monticello 69kV (Acutal POI is a tap on GUERNSEY - Monon Circuit 6907 an appendix G  facility)","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398033,"projectNumber":"J2761","queueDate":"2022-09-15T04:00:00+00:00","inService":"2029-09-28T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SME","county":"Marion","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Columbia","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398034,"projectNumber":"J2850","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-09T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bagby to Gerald Andrus 230 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398035,"projectNumber":"S1168","queueDate":"2026-07-02T04:00:00+00:00","inService":"2028-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion","state":"IL","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Finks 138 kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398036,"projectNumber":"J3231","queueDate":"2022-09-14T04:00:00+00:00","inService":"2024-11-29T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GLOSTER - LIBERTY 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398037,"projectNumber":"J2756","queueDate":"2022-09-09T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Livingston","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Burna Tap - Joy 69.0kV","summerNetMW":42.0,"winterNetMW":42.0,"dp1ErisMw":42.0,"dp1NrisMw":42.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398038,"projectNumber":"J2755","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-24T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pike","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AMITY SS-AECC MURFREESBORO EAST 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398039,"projectNumber":"J2758","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-02-27T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stuttgart Ricuskey to Woodward 230kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398040,"projectNumber":"J2802","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-04-06T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Singer J1424 to Penton 230 kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398041,"projectNumber":"J2950","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2018-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Clay","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"Clay County","summerNetMW":299.3,"winterNetMW":299.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398042,"projectNumber":"J2990","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-06-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pottawattamie","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Overland - J1859 POI 345kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398043,"projectNumber":"J2847","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Starke","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Reynolds--Burr Oak 345kV Line","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398044,"projectNumber":"J2858","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-11-20T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bayou Cove - Richard 138 kV circuit 2","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398045,"projectNumber":"J2749","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-04T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Winger 115kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398046,"projectNumber":"J2952","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Chambers","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Crooked Bayou to Stowell 138 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398047,"projectNumber":"J2894","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-05-07T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hendricks","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Westland Jct - Westline 69kV Line","summerNetMW":22.77,"winterNetMW":22.77,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398048,"projectNumber":"J2748","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-07T04:00:00+00:00","inService":"2026-08-04T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Clearwater","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wilton - Winger 230.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398049,"projectNumber":"J2937","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"","county":"Montgomery","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4PANA - 4OAKLEY 138.0kV","summerNetMW":186.0,"winterNetMW":186.0,"dp1ErisMw":186.0,"dp1NrisMw":93.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398050,"projectNumber":"J3018","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pottawattamie","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Overland Trail - Fallow Avenue 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398051,"projectNumber":"J2988","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-03-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Humboldt","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J2256 POI - Irvington 345kV line","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398052,"projectNumber":"J3041","queueDate":"2022-09-13T04:00:00+00:00","inService":"2029-08-31T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Byron 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398053,"projectNumber":"J2935","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Thetford to Murphy 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398054,"projectNumber":"J3003","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4HAVANA2 - 4CINCINATTI 138.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":135.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398055,"projectNumber":"J3016","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Cass","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Walton","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398056,"projectNumber":"J3030","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jefferson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"White Bluff to Sheridan 500kV","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":450.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398057,"projectNumber":"J2978","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Memphis EHV to Keo 500 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398058,"projectNumber":"J2971","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Covington","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Southwest Lone Star 161 kV - Mississippi Hub 161 kV","summerNetMW":280.0,"winterNetMW":280.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398059,"projectNumber":"J2970","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Gibson (Duke Terminal) 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398060,"projectNumber":"J2965","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"OAK GROVE 115 SUB","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398061,"projectNumber":"J2855","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Lawrence","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bedford - Edwardsport 138 kV line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398062,"projectNumber":"J2746","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-07-04T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Rush","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Boyd - Sexton","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398063,"projectNumber":"J2993","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Woodward-Grapevine 115kV line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398064,"projectNumber":"J3000","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Worthington - Merom 345kV Line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398065,"projectNumber":"J2939","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Tunica","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hambrick Switching Station 115kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398066,"projectNumber":"J2940","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sharkey","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Nitta Yuma SS (CE) - Rolling Fork 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398067,"projectNumber":"J2747","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-04T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398068,"projectNumber":"J2949","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Marshall","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marshalltown 161 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398069,"projectNumber":"J2982","queueDate":"2022-09-14T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"","county":"Warren","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Line 6629 Monmouth 69 kV Switching Station","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":35.0,"dp1NrisMw":35.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398070,"projectNumber":"J2976","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT","county":"Jasper","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Mill Creek SW Station 138 kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398071,"projectNumber":"J2992","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Perry","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hintonville 161kV Substation","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398072,"projectNumber":"J2999","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"","county":"Perry","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hintonville","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398073,"projectNumber":"J2953","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Orange","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CHISHOLM RD - SABINE 230 kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398074,"projectNumber":"J2922","queueDate":"2022-09-14T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7CASEY    - 7NEWTON   345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398075,"projectNumber":"J2943","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Minden to Sarepta 115 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398076,"projectNumber":"J3042","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"","county":"St. John the Baptist","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"WATERFORD 230 SWYD - VACHERIE 230.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398077,"projectNumber":"J3004","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cane","summerNetMW":142.0,"winterNetMW":142.0,"dp1ErisMw":142.0,"dp1NrisMw":127.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398078,"projectNumber":"J2996","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Corning North to Datto 161kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398079,"projectNumber":"J3011","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Prairie State Plant Switchyard 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398080,"projectNumber":"J3008","queueDate":"2022-08-24T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-05-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Cook","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sheffield - Burnham 345 (Tie line between CE and NIPS, NIPS owns 1.87 miles)","summerNetMW":270.0,"winterNetMW":270.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398081,"projectNumber":"J2945","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"","county":"Washington","state":"IA","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SUB T  3 - HILLS  3 345.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":350.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Steam Turbine (including Nuclear, Geothermal and Solar Steam)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398082,"projectNumber":"J2948","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Marshall","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marshalltown","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":75.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398083,"projectNumber":"J2931","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"","county":"Henderson","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398084,"projectNumber":"J2967","queueDate":"2022-09-09T04:00:00+00:00","inService":"2025-10-15T04:00:00+00:00","transmissionOwner":"","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lowe Grout Rd to Jennings 138kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398085,"projectNumber":"J3031","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jefferson","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4WLTNVL TP 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398086,"projectNumber":"J2955","queueDate":"2023-11-07T05:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Saline","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WRIGHTSVILLE Ã¢?? WHITE BLUFF EHV 115 KV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398087,"projectNumber":"J3023","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"H.S. EHV 500 kV Substation","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398088,"projectNumber":"J3014","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Cooper - Leesville 138.0kV","summerNetMW":280.0,"winterNetMW":280.0,"dp1ErisMw":280.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398089,"projectNumber":"J2957","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Panola","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Como - Crenshaw 115 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398090,"projectNumber":"J2989","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-06-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Hardin","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blackhawk (MEC)- Quinn 345 KV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398091,"projectNumber":"J3029","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-12-05T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Freeborn","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Freeborn","summerNetMW":153.0,"winterNetMW":153.0,"dp1ErisMw":153.0,"dp1NrisMw":153.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398092,"projectNumber":"J3022","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Taylor","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Orient to Atchison County 345 kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398093,"projectNumber":"J2983","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"WOODWARD 115 SUB - AECC GRAPEVINE 115.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398094,"projectNumber":"J2991","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dayton 120kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398095,"projectNumber":"J2959","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Starke","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rollin Schahfer (17SCHAHFER  255110) 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398096,"projectNumber":"J2980","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2023-10-02T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Perry","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hintonville 161/69 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398097,"projectNumber":"J2929","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Henderson 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398098,"projectNumber":"J2964","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tallahatchie","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Webb 115 kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398099,"projectNumber":"J2994","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Deluce 115kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398100,"projectNumber":"J3039","queueDate":"2022-09-13T04:00:00+00:00","inService":"2029-08-31T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Byron 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398101,"projectNumber":"J2954","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC CORNING NORTH Ã¢?? DATTO 161 KV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398102,"projectNumber":"J2933","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gallagher-Tittabawassee 345kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398103,"projectNumber":"J2973","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7FARADAY - 7PANA 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398104,"projectNumber":"J2984","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Corning North to Datto 161kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398105,"projectNumber":"J2995","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CHICOT115kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398106,"projectNumber":"J3037","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Eldorado Upland SS 115kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398107,"projectNumber":"J3020","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lyon","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lake Yankton to Buffalo Ridge 115kV","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398108,"projectNumber":"J3005","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Havana-Shockey (138kV)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398109,"projectNumber":"J3024","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-27T04:00:00+00:00","inService":"2026-03-07T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Louisa","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Newport 161 kV Bus High Side of T91 XFRMR 161/69 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398110,"projectNumber":"J2969","queueDate":"2022-09-12T04:00:00+00:00","inService":"2002-11-01T05:00:00+00:00","transmissionOwner":"MICHIGAN PUBLIC POWER AGENCY MPPA","county":"Kalkaska","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Kalkaska Gen","summerNetMW":13.4,"winterNetMW":13.4,"dp1ErisMw":13.4,"dp1NrisMw":13.4,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398111,"projectNumber":"J2972","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Adams","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4HULL     - 4HERLEMAN 138.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398112,"projectNumber":"J2956","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Galion 115 kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398113,"projectNumber":"J2926","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Franklin","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ashley to West Frankfort-1536","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398114,"projectNumber":"J2981","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ameren Centralia 69 kV Substation","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398115,"projectNumber":"J2962","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-12-01T05:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Hamilton","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Akin - Hamilton 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398116,"projectNumber":"J2986","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"AECC DELUCE - GILLETT 115.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398117,"projectNumber":"J3007","queueDate":"2022-08-25T04:00:00+00:00","inService":"2025-05-15T04:00:00+00:00","transmissionOwner":"METC","county":"Mason","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PERE MARQUETTE - LINDEMAN 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398118,"projectNumber":"J3060","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-20T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CMDR-7ASTER 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398119,"projectNumber":"J3027","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"","county":"Stark","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398120,"projectNumber":"J2924","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EL DORADO EHV - SAREPTA 345/115 SS 345.0kV","summerNetMW":222.0,"winterNetMW":222.0,"dp1ErisMw":222.0,"dp1NrisMw":222.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398121,"projectNumber":"J3067","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BEEKMAN - NORTH BASTROP 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398122,"projectNumber":"J3104","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Tinnin Road 230kV Substation","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398123,"projectNumber":"J2936","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-02T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Independence (A)(500kV) to Powerline (B) (500 kV)","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398124,"projectNumber":"J2963","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Puro","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398125,"projectNumber":"J2925","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gillett","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398126,"projectNumber":"J2979","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mason City West 69 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398127,"projectNumber":"J3026","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Deridder Mill - Roy S Nelson 138 kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398128,"projectNumber":"J3059","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-07-20T04:00:00+00:00","transmissionOwner":"ITC","county":"Midland","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398129,"projectNumber":"J3070","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-02-27T05:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Morton","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Square Butte 230 kV Substation East","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398130,"projectNumber":"J3043","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwards","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398131,"projectNumber":"J3025","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Douglas","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Alexandria to Hudson 115 kV","summerNetMW":188.0,"winterNetMW":188.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398132,"projectNumber":"J2932","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Henderson","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Henderson 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398133,"projectNumber":"J3125","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Crandall 345 kV Substation","summerNetMW":289.0,"winterNetMW":289.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398134,"projectNumber":"J3139","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Pickens 230 kV Substation","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398135,"projectNumber":"J3202","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Iron","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5CLARK    - 5PILTMA   161.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398136,"projectNumber":"J3092","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SHELBY SS","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398137,"projectNumber":"J2923","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-05-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EL DORADO EHV - SARPETA 345/115 KV SW STA 345kV","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398138,"projectNumber":"J3051","queueDate":"2024-01-09T05:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Chisago","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rush City 230 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398139,"projectNumber":"J3046","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-25T04:00:00+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Concordia","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Red Gum to Metropolis 115 kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398140,"projectNumber":"J3203","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-07-20T04:00:00+00:00","transmissionOwner":"METC","county":"Clinton","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bingham - Lookng GL J 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398141,"projectNumber":"J3130","queueDate":"2022-09-09T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kinmundy to Salem 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398142,"projectNumber":"J3131","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado EHV - Sarepta 345/115KV SW STA 345 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398143,"projectNumber":"J3133","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","transmissionOwner":"","county":"Saginaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Murphy to Nelson Road 345 kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398144,"projectNumber":"J3201","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Walthall","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Tylertown-Bogalusa 115 kV","summerNetMW":148.0,"winterNetMW":148.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398145,"projectNumber":"J3172","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Dakota","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GRE-NININGR7 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398146,"projectNumber":"J3174","queueDate":"2022-09-09T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Scott","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Jacksonville Industrial Pk-Winchester Switching Station 138 kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398147,"projectNumber":"J3090","queueDate":"2022-09-09T04:00:00+00:00","inService":"2025-10-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS INC. EAI","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Memphis EHV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398148,"projectNumber":"J3146","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Amo - Wheatland Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398149,"projectNumber":"J3044","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwards","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398150,"projectNumber":"J3216","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bloomington Brokaw","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398151,"projectNumber":"J3205","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Franklin","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Arlington to Smithdale 115 kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398152,"projectNumber":"J3132","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"El Dorado EHV - Sarepta 345/115KV SW STA 345 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398153,"projectNumber":"J3001","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J2134 POI to White Bluff 115kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398154,"projectNumber":"J3040","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ouachita","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EL DORADO EHV - MCNEIL EHV 500.0kV","summerNetMW":290.0,"winterNetMW":290.0,"dp1ErisMw":290.0,"dp1NrisMw":290.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398155,"projectNumber":"J3140","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Porter","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"South Valparaiso 138 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":50.0,"dp1NrisMw":50.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398156,"projectNumber":"J3169","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cypress 138 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398157,"projectNumber":"J3015","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"","county":"Iroquois","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Gilman - Watseka 138kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":400.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398158,"projectNumber":"J3028","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"","county":"Perry","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Waynesboro 161 - Hintonville 161 161.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398159,"projectNumber":"J2928","queueDate":"2022-09-02T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Poinsett","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Harrisburg 161 kV Substation","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398160,"projectNumber":"J3013","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ashley","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398161,"projectNumber":"J3206","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer 345 kV Substation","summerNetMW":194.0,"winterNetMW":194.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398162,"projectNumber":"J3124","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","transmissionOwner":"","county":"Saginaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Murphy 345 kV Substation","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398163,"projectNumber":"J3218","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Nevada","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Prescott (#337507) to Emmett (#337505)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398164,"projectNumber":"J3142","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Johnson","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Circuit ID# 6950 - Columbus North (08COLNRT) - Franklin Forsythe St (08FRSYTH)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398165,"projectNumber":"J3134","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Otsego","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gaylord Interconnection","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398166,"projectNumber":"J3213","queueDate":"2022-09-01T04:00:00+00:00","inService":"2026-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Hennepin","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Riverside 115kV Substation","summerNetMW":55.0,"winterNetMW":55.0,"dp1ErisMw":55.0,"dp1NrisMw":55.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398167,"projectNumber":"J3143","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Jackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398168,"projectNumber":"J3144","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398169,"projectNumber":"J3145","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398170,"projectNumber":"J3182","queueDate":"2022-09-11T04:00:00+00:00","withdrawnDate":"2023-02-16T05:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Oliver","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Coyote","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398171,"projectNumber":"J3181","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"","county":"Logan","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4FOGARTY - 4LIMIT 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398172,"projectNumber":"J3219","queueDate":"2022-09-14T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS-Only","poiName":"CANNON FALLS TRANSM.","summerNetMW":3.0,"winterNetMW":3.0,"dp1ErisMw":0.0,"dp1NrisMw":3.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hydro","facilityType":"Hydroelectric","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398173,"projectNumber":"J3193","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"POYEN-GIFFORD 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398174,"projectNumber":"J3170","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Avoyelles","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Eola-Marksville 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398175,"projectNumber":"J3183","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Grant","state":"SD","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South 230KV Substation","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398176,"projectNumber":"J3195","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-02-27T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pulaski","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"White Bluff EHV - Wrightsville 115 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398177,"projectNumber":"J3194","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-02-27T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Hardin","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RYE CO-CYPRESS 138 kV","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398178,"projectNumber":"J3189","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"St. Johns 138 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398179,"projectNumber":"J3109","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Taping the 'Carlisle / 3CARISLE! (338003)' to 'Screeton / 3SCREETON (338005)' 115kV line","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398180,"projectNumber":"J3084","queueDate":"2025-08-12T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom (HED) -  Dresser 345.0kV","summerNetMW":641.8,"winterNetMW":641.8,"dp1ErisMw":641.8,"dp1NrisMw":641.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398181,"projectNumber":"J3171","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Drew","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Monticello East-Reed SS 115 kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398182,"projectNumber":"J3173","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Swifton to Hoxie 161 kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398183,"projectNumber":"J3081","queueDate":"2025-07-28T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DEGRAY DAM - H.S. EHV 115.0kV","summerNetMW":105.0,"winterNetMW":105.0,"dp1ErisMw":105.0,"dp1NrisMw":105.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398184,"projectNumber":"J3078","queueDate":"2022-09-12T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fargo to Sandburg 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398185,"projectNumber":"J3095","queueDate":"2022-09-13T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"","county":"Ford","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4PAXTON - 4J845POI 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398186,"projectNumber":"J3121","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Wayne","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Centerville 69 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398187,"projectNumber":"J3161","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Huebner 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398188,"projectNumber":"J3138","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rapides 230kV Substation","summerNetMW":49.3,"winterNetMW":49.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398189,"projectNumber":"J3147","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Johnson","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Trafalgar Switchyard (08TRFLGJ)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398190,"projectNumber":"J3091","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Logan","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"East Bismarck Junction to Wishek Junction","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398191,"projectNumber":"J3184","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Turkey Hill 138 kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":145.0,"dp1NrisMw":145.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398192,"projectNumber":"J3191","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC BALCH-FISHER 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398193,"projectNumber":"J3221","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"LA_ORD_115","summerNetMW":49.0,"winterNetMW":49.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398194,"projectNumber":"J3102","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Pemiscot","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Dell to New Madrid 500kV line","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398195,"projectNumber":"J3079","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jasper","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Jasper-Holly Springs 138 kV line tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398196,"projectNumber":"J3149","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mills","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hastings to Bunge","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398197,"projectNumber":"J3126","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Washington","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stringtown-Greenville/North 115kV Transmission Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398198,"projectNumber":"J3127","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Brinkley East - Clarendon 115 kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398199,"projectNumber":"J3185","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-02-01T05:00:00+00:00","transmissionOwner":"","county":"Effingham","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Effingham - Newton 138KV (4EFFINGHM 347025 -4NEWTON 347831)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398200,"projectNumber":"J3186","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"","county":"Bolivar","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rosedale - Delta 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398201,"projectNumber":"J3217","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Crandall 345kV Substation","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398202,"projectNumber":"J3103","queueDate":"2022-06-22T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Lafayette - Veedersburg West 230 kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398203,"projectNumber":"J3188","queueDate":"2022-09-14T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"","county":"Marshall","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hallock 138 kV","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":35.0,"dp1NrisMw":35.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398204,"projectNumber":"J3137","queueDate":"2025-10-17T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pocahontas","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Sac - Pocahontas 161 kV","summerNetMW":156.3,"winterNetMW":156.3,"dp1ErisMw":156.3,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398205,"projectNumber":"J3187","queueDate":"2022-08-31T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Havana 138 kV Sub","summerNetMW":37.0,"winterNetMW":37.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398206,"projectNumber":"J3160","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Fond du Lac","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"South Fond du Lac 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398207,"projectNumber":"J3135","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-07-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Commodore-Aster-4513","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398208,"projectNumber":"J3100","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Roscommon","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Higgins - Mio Dam 138 kV line","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398209,"projectNumber":"J3128","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ELECTRIC AVENUE LLC","county":"East Feliciana","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Starhill Substation 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398210,"projectNumber":"J3178","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"De Soto","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dolet Hills","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398211,"projectNumber":"J3179","queueDate":"2022-11-05T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Plaquemines","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Derrick","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398212,"projectNumber":"J3180","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"De Soto","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Dolet Hills","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398213,"projectNumber":"J3192","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Mallory 161 kV Substation","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398214,"projectNumber":"J3190","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2023-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pike 161 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398215,"projectNumber":"J3136","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Daviess","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398216,"projectNumber":"J3214","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Lee","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wever","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398217,"projectNumber":"J3106","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-08-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Pemiscot","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Dell to New Madrid 500 kV line","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398218,"projectNumber":"J3123","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Orange","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Chisholm RD- Hartburg 230kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398219,"projectNumber":"J3150","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Panola","state":"MS","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Crenshaw to Como","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398220,"projectNumber":"J3175","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Robinsonville 230kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398221,"projectNumber":"J3176","queueDate":"2022-11-05T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Plaquemines","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Derrick","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398222,"projectNumber":"J3177","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Tunica","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Robinsonville 230kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398223,"projectNumber":"J3226","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BURR OAK - PLYMOUTH 138.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398224,"projectNumber":"J3228","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Redstone-Tittabawassee 138 kV Line","summerNetMW":26.0,"winterNetMW":26.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398225,"projectNumber":"J3094","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Washington","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pumpkin Center 230kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398226,"projectNumber":"J3129","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Feliciana","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Starhill 138 kV Substation","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398227,"projectNumber":"J3220","queueDate":"2024-08-05T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Ionia","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Peddler","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398228,"projectNumber":"J3199","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-12-22T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Adair","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Zachary 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398229,"projectNumber":"J3209","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-03-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Hineston","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398230,"projectNumber":"J3162","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Beloit Gateway","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398231,"projectNumber":"J3212","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mills","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GLENWOOD","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398232,"projectNumber":"J3148","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-07-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Greene","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Drager to Grand Junction","summerNetMW":131.0,"winterNetMW":131.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398233,"projectNumber":"J3223","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Edwards","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV","summerNetMW":88.0,"winterNetMW":88.0,"dp1ErisMw":88.0,"dp1NrisMw":88.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398234,"projectNumber":"J3224","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"","county":"Marion","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4KINMUNDY-4TANNER 138kv","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398235,"projectNumber":"J3141","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ritchie Plant Substation 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398236,"projectNumber":"J3229","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-04-24T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Maries","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4DILLON - 4LKSIDE TP2 138.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398237,"projectNumber":"J3225","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2022-12-05T05:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BABCOCK-STILLWELL 345 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398238,"projectNumber":"J2642","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BOGALUSA - DEXTER SS (CE) 115.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398239,"projectNumber":"J2643","queueDate":"2022-09-12T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"BOGALUSA - DEXTER SS (CE) 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398240,"projectNumber":"J2649","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500kv","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398241,"projectNumber":"J2668","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Mason","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lake County - Pere Marquette (METC) 138.0kV","summerNetMW":215.0,"winterNetMW":215.0,"dp1ErisMw":215.0,"dp1NrisMw":215.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398242,"projectNumber":"J2554","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-18T04:00:00+00:00","transmissionOwner":"","county":"Putnam","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Putnam","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398243,"projectNumber":"J3227","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Ogemaw","state":"MI","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gallagher to Livingston 345 kV Segment on the Livingston â€“ Tittabawassee 345 kV Line","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398244,"projectNumber":"J2680","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-10-20T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Dunklin","state":"MO","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Jim Hill-Hayti South 161 kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398245,"projectNumber":"J2653","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Polk","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Army Post 161kV Substation","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398246,"projectNumber":"J2645","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-18T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4PREST - 4BALDWIN 138.0kV","summerNetMW":199.0,"winterNetMW":199.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398247,"projectNumber":"J2669","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Mason","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lake County - Pere Marquette (METC) 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398248,"projectNumber":"J2556","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-18T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Whiteside","state":"IL","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SUB 39 - CORDOVA 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398249,"projectNumber":"J2558","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-07-18T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Delta Ms - Ruleville 115kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398250,"projectNumber":"J2560","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-06-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CLEVELAND/SOUTH - STEINER (CE) 115.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398251,"projectNumber":"J2561","queueDate":"2022-09-15T04:00:00+00:00","inService":"2030-07-18T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Yellow Medicine","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HAZEL CREEK","summerNetMW":153.0,"winterNetMW":153.0,"dp1ErisMw":153.0,"dp1NrisMw":153.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398252,"projectNumber":"J2651","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"","county":"East Baton Rouge","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MOLER - COLFEL 230.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398253,"projectNumber":"J2574","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":172.0,"winterNetMW":172.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398254,"projectNumber":"J2667","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GREENWOOD - RAPSON 345.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":135.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398255,"projectNumber":"J2655","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Polk","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Army Post 161 kV Substation","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398256,"projectNumber":"J2671","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Arenac","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Whittemore to Twining 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398257,"projectNumber":"J2674","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Clinton","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bingham to Marquette 138 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398258,"projectNumber":"J2678","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Delta","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Chandler 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398259,"projectNumber":"J2583","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Battle Creek - Island Road 138 kV Line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398260,"projectNumber":"J2577","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Parkin","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398261,"projectNumber":"J2613","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HOLLAND BOTTOM - INDEPENDENCE-ISES 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398262,"projectNumber":"J2573","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Washington","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gallagher to Bedford 138kV Line","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398263,"projectNumber":"J2608","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Stevens","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hancock 115kV Substation","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":160.0,"dp1NrisMw":160.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398264,"projectNumber":"J2610","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Bond","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4GREENVIL to 4HOOKDALE 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398265,"projectNumber":"J2569","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"St. Louis","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Arrowhead 115 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398266,"projectNumber":"J2593","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-04-24T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Gasconade","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bland 138 kV Substation","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398267,"projectNumber":"J2675","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gladwin","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BARD ROAD - GALLAGHER 138.0kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398268,"projectNumber":"J2676","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","negInService":"2027-10-04T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RAPSON - STEIN 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398269,"projectNumber":"J2565","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Iroquois","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4GILMAN-4PAXTON E 138kV","summerNetMW":265.0,"winterNetMW":265.0,"dp1ErisMw":265.0,"dp1NrisMw":265.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398270,"projectNumber":"J2584","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Warren","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Warrenton 161kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398271,"projectNumber":"J2665","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-29T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Mercer","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Coyote Switchyard 345kV Substation","summerNetMW":347.0,"winterNetMW":347.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398272,"projectNumber":"J2654","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clinton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Frankfort  -  New London 230.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398273,"projectNumber":"J2579","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-10T05:00:00+00:00","inService":"2027-06-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cincinnati 138 kV Substation","summerNetMW":362.0,"winterNetMW":362.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398274,"projectNumber":"J2628","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-07-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RAPSON","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398275,"projectNumber":"J2611","queueDate":"2022-09-14T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Alcona","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"IOSCO - SPRUCE ROAD 138.0kV","summerNetMW":215.0,"winterNetMW":215.0,"dp1ErisMw":215.0,"dp1NrisMw":215.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398276,"projectNumber":"J2571","queueDate":"2022-09-15T04:00:00+00:00","inService":"2024-01-31T05:00:00+00:00","transmissionOwner":"BROOKFIELD ENERGY MARKETING INC.","county":"Tunica","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J866 Six Mile Lake Substation","summerNetMW":176.6,"winterNetMW":176.6,"dp1ErisMw":176.6,"dp1NrisMw":176.6,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398277,"projectNumber":"J2624","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-01-01T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Stevens","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South 345kV Substation","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398278,"projectNumber":"J2646","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lincoln","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"REESE 115 - TRUSSELS CROSSING (LAGEN)","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398279,"projectNumber":"J2576","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-01-31T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Louisa","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Denmark - Newport 161kV","summerNetMW":164.1,"winterNetMW":164.1,"dp1ErisMw":164.1,"dp1NrisMw":164.1,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398280,"projectNumber":"J2682","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-02T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Independence-ISES- Newport 161 KV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398281,"projectNumber":"J2595","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"LAKEOVER EHV-RAY BRASWELL EHV 500 kV","summerNetMW":650.0,"winterNetMW":650.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398282,"projectNumber":"J2597","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Memphis 500 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398283,"projectNumber":"J2650","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2024-02-05T05:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Hancock","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sunnyside to Hanna 345 kV","summerNetMW":236.0,"winterNetMW":236.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398284,"projectNumber":"J2648","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-02T04:00:00+00:00","transmissionOwner":"","county":"Champaign","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sidney 138 kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":135.0,"dp1NrisMw":135.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398285,"projectNumber":"J2591","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-10-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Choctaw","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"E-NRIS","poiName":"WOLF CREEK 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"High Voltage DC","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398286,"projectNumber":"J2679","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Livingston","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COLFAX to Madrid 120 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398287,"projectNumber":"J2594","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Hinds","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ray Braswell 230 kV","summerNetMW":650.0,"winterNetMW":650.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398288,"projectNumber":"J2596","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"West Memphis 500 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398289,"projectNumber":"J2557","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2029-07-18T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Wood","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Arpin","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398290,"projectNumber":"J2559","queueDate":"2022-09-14T04:00:00+00:00","inService":"2029-07-18T04:00:00+00:00","transmissionOwner":"","county":"Wood","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Arpin","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398291,"projectNumber":"J2570","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Lafourche","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Thibodaux 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398292,"projectNumber":"J2652","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Rosemount - Nininger (GRE) 115 kV line","summerNetMW":197.0,"winterNetMW":197.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398293,"projectNumber":"J2670","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"","county":"Mason","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ludington to Keystone 345 kV","summerNetMW":223.0,"winterNetMW":223.0,"dp1ErisMw":223.0,"dp1NrisMw":223.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398294,"projectNumber":"J2672","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BINGHAM - CORNELL 138.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":120.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398295,"projectNumber":"J2673","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","negInService":"2026-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Clare","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BARD ROAD - WARREN 138.0kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":145.0,"dp1NrisMw":145.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398296,"projectNumber":"J2677","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Greenwood 120 kV","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":195.0,"dp1NrisMw":195.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398297,"projectNumber":"J2641","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"NEWPORT","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398298,"projectNumber":"J2566","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Daviess","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gibson Sta - Bedford 345 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398299,"projectNumber":"J2609","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"DPP-2022","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sand Lake","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398300,"projectNumber":"J2635","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cane 138 kV","summerNetMW":52.0,"winterNetMW":52.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398301,"projectNumber":"J2598","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Mower","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Adams to Hayward 161 kV Tap","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398302,"projectNumber":"J2627","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"","county":"Adams","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"East Quincy","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398303,"projectNumber":"J2681","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Springhill 115kV (A) to Taylor 115kV (B)","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398304,"projectNumber":"J2575","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-06-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cincinnati 138 kV Substation","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":198.0,"dp1NrisMw":198.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398305,"projectNumber":"J2632","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-24T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Webster","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sarpeta to Minden 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398306,"projectNumber":"J2719","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-01T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Gladwin","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BARD ROAD 138kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398307,"projectNumber":"J2600","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Wabasha","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wabaco to Alma 161 kV Tap","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398308,"projectNumber":"J2602","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"DeSoto","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Twinkletown 230 kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398309,"projectNumber":"J2633","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Van Buren","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC Clinton Industrial - AECC Clinton West 161 KV","summerNetMW":61.0,"winterNetMW":61.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398310,"projectNumber":"J2638","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Nevada","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Emmet SS - Hope East SS 115KV","summerNetMW":58.0,"winterNetMW":58.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398311,"projectNumber":"J2605","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES - TRANSMISSION","county":"Steele","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ALEXANDRIA 345 KV","summerNetMW":339.0,"winterNetMW":339.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398312,"projectNumber":"J2607","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Redhawk 138 kV - MTEP Project (17976)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398313,"projectNumber":"J2644","queueDate":"2022-09-10T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EUDORA - CHICKASAW (LAGEN) 115.0kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398314,"projectNumber":"J2631","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-24T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Stuttgart Ricuskey- Tarleton 230 KV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398315,"projectNumber":"J2637","queueDate":"2022-09-10T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cotton Plant- Brinkley West 115KV","summerNetMW":64.5,"winterNetMW":64.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398316,"projectNumber":"J2639","queueDate":"2022-09-09T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Bradley","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC HERMITAGE SOUTH - HILO 115.0kV","summerNetMW":105.8,"winterNetMW":105.8,"dp1ErisMw":105.8,"dp1NrisMw":70.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398317,"projectNumber":"J2640","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":394.5,"winterNetMW":394.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398318,"projectNumber":"J2630","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-24T04:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Woodruff","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Des Arc to Cotton Plant 115 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398319,"projectNumber":"J2744","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Wilkinson","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CENTREVILLE","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398320,"projectNumber":"J2745","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Humphreys","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BELZONI - BELZONI TAP SS 115.0kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398321,"projectNumber":"J2729","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-02-01T05:00:00+00:00","transmissionOwner":"","county":"West Baton Rouge","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ADDIS - BIG CAJUN #1 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398322,"projectNumber":"J2742","queueDate":"2022-09-13T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"White","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BEEBE - GARNER SS 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398323,"projectNumber":"J2722","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-08-14T04:00:00+00:00","inService":"2026-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clinton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tap on Frankfort - New London 230 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398324,"projectNumber":"J2691","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Bollinger","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7RUSH     - 7BALDWIN 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398325,"projectNumber":"J2740","queueDate":"2022-09-13T04:00:00+00:00","inService":"2029-02-15T05:00:00+00:00","transmissionOwner":"","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"DELTA SWYD - SHELBY SS 115.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398326,"projectNumber":"J2741","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DELTA SWYD - DREW [MS] 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398327,"projectNumber":"J2738","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-02-01T05:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Rock Island","state":"IL","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SUB 17","summerNetMW":128.0,"winterNetMW":128.0,"dp1ErisMw":128.0,"dp1NrisMw":128.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398328,"projectNumber":"J2717","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-10-23T04:00:00+00:00","inService":"2029-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ETTA 500kV Substation","summerNetMW":600.0,"winterNetMW":600.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398329,"projectNumber":"J2718","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"New Madrid","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398330,"projectNumber":"J2735","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2022-12-06T05:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Ouachita","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Selman Field 69 kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398331,"projectNumber":"J2698","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-10-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Choctaw","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"E-NRIS","poiName":"WOLF CREEK 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"High Voltage DC","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398332,"projectNumber":"J2716","queueDate":"2022-09-14T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HAMPTON 345 KV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398333,"projectNumber":"J2686","queueDate":"2022-09-15T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Muscatine","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Walcott 345 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398334,"projectNumber":"J2770","queueDate":"2023-09-12T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Grant","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Colfax-Montgomery (EES) 230 kV Line","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398335,"projectNumber":"J2772","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Mercer","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Coyote Switchyard 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398336,"projectNumber":"J2775","queueDate":"2022-09-08T04:00:00+00:00","withdrawnDate":"2025-08-07T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398337,"projectNumber":"J2801","queueDate":"2023-09-11T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Woodruff","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"AECC HUNTER NORTH - MCCRORY 161.0kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":130.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398338,"projectNumber":"J2760","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Hubbard","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BADOURA4 (608610) 230 kV Substation","summerNetMW":68.0,"winterNetMW":68.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398339,"projectNumber":"J2778","queueDate":"2022-09-07T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Deedsville\tNorth Manchester Switching Sta 69kV (Circuit Number 6974).","summerNetMW":15.0,"winterNetMW":15.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398340,"projectNumber":"J2779","queueDate":"2022-09-08T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clinton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Lafayette\tto Middlefork 69kV Line (Circuit 6909)","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398341,"projectNumber":"J2692","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-10-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Choctaw","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"E-NRIS","poiName":"WOLF CREEK 500 kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"High Voltage DC","facilityType":"Solar/Wind","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398342,"projectNumber":"J2694","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"","county":"Christian","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7COFFEEN  - 7PANA     345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Wind/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398343,"projectNumber":"J2695","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Carroll","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":234.0,"winterNetMW":234.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398344,"projectNumber":"J2688","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-05-26T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Newton","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NEWTON 138 kV","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398345,"projectNumber":"J2689","queueDate":"2025-07-31T04:00:00+00:00","inService":"2026-05-26T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"JACINTO 230kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398346,"projectNumber":"J2687","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Hancock","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sunnyside to Gwynneville 345kV line","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398347,"projectNumber":"J2773","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"","county":"Poinsett","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Newport - Fisher 161 kV Line","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398348,"projectNumber":"J2826","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sandborn Primary - Worthington Primary 161.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":125.0,"dp1NrisMw":125.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398349,"projectNumber":"J2901","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"MACEDONIA - TAYLOR 115.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398350,"projectNumber":"J2892","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2026-09-16T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Franklin","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blackhawk (MEC) - Quinn 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398351,"projectNumber":"J2803","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Carroll","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Winona (3WINONA!  337060) - Carrollton (3CARROLLTON+  337056) 115 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398352,"projectNumber":"J2796","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Jackson","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Newport Ab-Cash 161kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398353,"projectNumber":"J2776","queueDate":"2022-09-07T04:00:00+00:00","withdrawnDate":"2023-03-22T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Fulton","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WINAMAC to BRUCE LAKE 69kV (Circuit ID 6913) NIPSCO AREA","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398354,"projectNumber":"J2777","queueDate":"2022-09-07T04:00:00+00:00","withdrawnDate":"2023-03-22T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Madison","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cadiz\tLapel Brockway Glass 69kV","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398355,"projectNumber":"J2836","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Livingston","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tap - Cumberland 69.0kV","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398356,"projectNumber":"J2897","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"San Jacinto","state":"TX","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"RIVTRIN - SHECO CALVIN 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398357,"projectNumber":"J2902","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Warren","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Beech Grove SS 115 kV Substation","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398358,"projectNumber":"J2895","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-08-19T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clark","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bethlehem 138kV Substation","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":120.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398359,"projectNumber":"J2896","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Sargent","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gwinner 115kV Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398360,"projectNumber":"J2900","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"FRANKLIN EHV - MCKNIGHT 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398361,"projectNumber":"J2599","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Redwood","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lyon County 345kV Substation","summerNetMW":216.0,"winterNetMW":216.0,"dp1ErisMw":216.0,"dp1NrisMw":216.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398362,"projectNumber":"J2601","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"","county":"Wabasha","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Rochester - Briggs Road 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398363,"projectNumber":"J2845","queueDate":"2025-10-23T04:00:00+00:00","inService":"2025-10-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Freeborn","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Adams - Hayward 161kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398364,"projectNumber":"J2915","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2028-07-18T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Clark","state":"MO","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":223.0,"winterNetMW":223.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398365,"projectNumber":"J2603","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4PURO - 4HAVANA3 138.0kV","summerNetMW":320.0,"winterNetMW":320.0,"dp1ErisMw":320.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398366,"projectNumber":"J2604","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clinton","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"South Centralia 138 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398367,"projectNumber":"J2606","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES - TRANSMISSION","county":"Steele","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Alexandria 345kV","summerNetMW":361.0,"winterNetMW":361.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398368,"projectNumber":"J2634","queueDate":"2022-09-12T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Ouachita","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CAMDEN MAGUIRE - SMACKOVER 115.0kV","summerNetMW":105.8,"winterNetMW":105.8,"dp1ErisMw":105.8,"dp1NrisMw":67.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398369,"projectNumber":"J2811","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":210.0,"dp1NrisMw":210.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398370,"projectNumber":"J3829","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ETTA","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":770.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398371,"projectNumber":"J2636","queueDate":"2022-09-12T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clark","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BISMARCK-AECC ALPINE 115 KV","summerNetMW":78.5,"winterNetMW":78.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398372,"projectNumber":"J2684","queueDate":"2022-09-08T04:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"ITC","county":"St. Clair","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BUNCE","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398373,"projectNumber":"J2739","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Ohio","state":"KY","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WILSON","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398374,"projectNumber":"J2743","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Washington","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BOGALUSA","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398375,"projectNumber":"J2879","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Washington","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CHEMOLITE","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398376,"projectNumber":"J2913","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"","county":"Sargent","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Forman 115kV Substation","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":90.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398377,"projectNumber":"J2737","queueDate":"2025-09-05T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398378,"projectNumber":"J2697","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7ASTER - 7CMDR 345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398379,"projectNumber":"J2909","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-27T04:00:00+00:00","inService":"2027-06-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Remington AECC to Lonoke E 115kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398380,"projectNumber":"J2841","queueDate":"2022-09-15T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Independence","state":"AR","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Independent - Holland Bottom 500kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398381,"projectNumber":"J2798","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-08-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"E. Winamac - Monticello 138 kV line","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398382,"projectNumber":"J2771","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Coahoma","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"6CROSSROADS! (337100) - 6MOONLAKE%  (337107) 230 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398383,"projectNumber":"J2804","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2017-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"West Carroll","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Oak Grove - Galion 115kV Tap","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398384,"projectNumber":"J2869","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"","county":"Sunflower","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398385,"projectNumber":"J2898","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2026-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"FRANKLIN EHV - MCKNIGHT 500.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398386,"projectNumber":"J2914","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-04-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Tammany","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"MCKNIGHT - PLANT DANIEL 500.0kV","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":450.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398387,"projectNumber":"J2766","queueDate":"2023-08-21T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2025-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Howard","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":190.0,"dp1NrisMw":190.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398388,"projectNumber":"J2829","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Scott","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Scottsburg - Speed 69kV","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398389,"projectNumber":"J2873","queueDate":"2022-09-13T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SME","county":"Simpson","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Magee 161 - White Oak 161.0kV","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":165.0,"dp1NrisMw":165.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398390,"projectNumber":"J2807","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ingham","state":"MI","studyCycle":"DPP-2022","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DELHI to TOMPKINS 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398391,"projectNumber":"J2872","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Dakota","state":"MN","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hampton 345kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398392,"projectNumber":"J2852","queueDate":"2022-09-14T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Roberts","state":"SD","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Browns Valley 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398393,"projectNumber":"J2887","queueDate":"2022-09-13T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Simpson","state":"MS","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Magee 161 - White Oak 161.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398394,"projectNumber":"J2810","queueDate":"2022-09-14T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer 345/161 sub (Emery station 161 outlet)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398395,"projectNumber":"J2899","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-04-30T04:00:00+00:00","transmissionOwner":"","county":"Calcasieu","state":"LA","studyCycle":"DPP-2022","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"GOOS FERRY - CHALKLEY CO 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398396,"projectNumber":"J2842","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2023-03-24T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Mason 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398397,"projectNumber":"J3828","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Lapeer","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398398,"projectNumber":"J4253","queueDate":"2026-07-30T00:01:31+00:00","inService":"2029-04-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":86.0,"winterNetMW":86.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398399,"projectNumber":"J2843","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hendricks","state":"IN","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Qualitech 345kV - Amo 345kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398400,"projectNumber":"J2883","queueDate":"2022-09-15T04:00:00+00:00","withdrawnDate":"2025-10-27T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Mercer","state":"ND","studyCycle":"DPP-2022","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Coyote Switchyard 345kV Substation","summerNetMW":347.0,"winterNetMW":347.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398401,"projectNumber":"J2808","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ramsey East 138 sub (co-located with Dressor and Switchgrass)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398402,"projectNumber":"J2809","queueDate":"2022-09-14T04:00:00+00:00","inService":"2026-09-01T04:00:00+00:00","transmissionOwner":"","county":"Iroquois","state":"IL","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4GILMAN - 4PAXTON E 138 kV","summerNetMW":133.0,"winterNetMW":133.0,"dp1ErisMw":133.0,"dp1NrisMw":133.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398403,"projectNumber":"J4251","queueDate":"2026-07-15T19:50:41+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398404,"projectNumber":"S1001","queueDate":"2020-06-25T04:00:00+00:00","withdrawnDate":"2024-06-07T04:00:00+00:00","transmissionOwner":"","county":"","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":7.5,"winterNetMW":7.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398405,"projectNumber":"S1007","queueDate":"2021-07-08T04:00:00+00:00","withdrawnDate":"2024-08-15T04:00:00+00:00","inService":"2022-10-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Atlanta – Tuscola 120 kV line(265183)","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3398406,"projectNumber":"S1004","queueDate":"2020-10-28T04:00:00+00:00","transmissionOwner":"","county":"","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398407,"projectNumber":"S1005","queueDate":"2021-04-02T04:00:00+00:00","transmissionOwner":"","county":"","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398408,"projectNumber":"S1009","queueDate":"2021-08-17T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Pleasant Valley 161kV Substation","summerNetMW":258.92,"winterNetMW":258.92,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398409,"projectNumber":"S1016","queueDate":"2022-04-15T04:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Lone Rock 69kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398410,"projectNumber":"S1020","queueDate":"2022-04-25T04:00:00+00:00","doneDate":"2022-06-20T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Slate Substation 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398411,"projectNumber":"S1028","queueDate":"2022-05-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"White","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Reynolds - Burr Oak 345kV Line","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398412,"projectNumber":"S1033","queueDate":"2022-08-15T04:00:00+00:00","inService":"2023-07-05T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Green","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Bass Creek – Albany – North Monroe 138 kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398413,"projectNumber":"S1038","queueDate":"2022-12-07T05:00:00+00:00","inService":"2025-02-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Shiawassee","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Gross 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398414,"projectNumber":"S1041","queueDate":"2023-05-19T04:00:00+00:00","inService":"2026-04-23T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Ford","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Gibson City South (347114)","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398415,"projectNumber":"S1011","queueDate":"2021-10-15T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Slate 345 kV Sub (256573)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398416,"projectNumber":"S1014","queueDate":"2022-03-09T05:00:00+00:00","inService":"2025-10-31T04:00:00+00:00","negInService":"2028-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"","state":"ND","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Merricourt Wind 230kV","summerNetMW":9.0,"winterNetMW":9.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398417,"projectNumber":"S1018","queueDate":"2022-04-20T04:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"7 Mile Creek 138kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398418,"projectNumber":"S1042","queueDate":"2022-12-20T05:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398419,"projectNumber":"R1003","queueDate":"2020-08-05T04:00:00+00:00","inService":"2026-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Orange","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Sabine 138 & 230 kV (bus #334440, #334431, #334433","summerNetMW":1166.0,"winterNetMW":1163.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398420,"projectNumber":"R1007","queueDate":"2021-03-29T04:00:00+00:00","inService":"2023-07-01T04:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Linn","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"ITC DAEC Substation 161kV","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398421,"projectNumber":"S1023","queueDate":"2022-05-16T04:00:00+00:00","inService":"2023-03-27T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Grant","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Nelson Dewey - Lancaster 138kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398422,"projectNumber":"S1026","queueDate":"2022-05-26T04:00:00+00:00","doneDate":"2022-10-31T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Dubois","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Dubois - Culley 138kV line","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398423,"projectNumber":"R1010","queueDate":"2021-07-21T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marathon","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398424,"projectNumber":"R1014","queueDate":"2022-02-04T05:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"Alliant Energy East","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Edgewater 345kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398425,"projectNumber":"R1018","queueDate":"2022-02-23T05:00:00+00:00","withdrawnDate":"2024-03-11T04:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Allamakee","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Lansing 161 kV substation","summerNetMW":280.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398426,"projectNumber":"S1000","queueDate":"2020-06-20T04:00:00+00:00","transmissionOwner":"","county":"","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"LEGACY: Done","sisPhase1":"","postGIAStatus":""},{"id":3398427,"projectNumber":"S1006","queueDate":"2021-04-02T04:00:00+00:00","inService":"2023-10-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"REC Bradford - W. Darien 138kV Line","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398428,"projectNumber":"S1010","queueDate":"2021-10-15T04:00:00+00:00","inService":"2021-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Redstone138 kV Sub(256542)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398429,"projectNumber":"S1002","queueDate":"2020-10-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398430,"projectNumber":"S1008","queueDate":"2021-08-04T04:00:00+00:00","withdrawnDate":"2025-04-25T04:00:00+00:00","inService":"2022-12-31T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Line Tap between Edwardsport and Amo 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398431,"projectNumber":"S1012","queueDate":"2021-10-15T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Luce 138 kV Sub(256594)","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398432,"projectNumber":"S1029","queueDate":"2022-06-03T04:00:00+00:00","inService":"2024-02-01T05:00:00+00:00","transmissionOwner":"","county":"Mclean","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Aster Substation","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398433,"projectNumber":"S1031","queueDate":"2022-08-19T04:00:00+00:00","inService":"2025-07-30T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Salt River Substation 138kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398434,"projectNumber":"S1035","queueDate":"2022-08-15T04:00:00+00:00","inService":"2023-07-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Townline Rd. - Paddock 138kV","summerNetMW":33.0,"winterNetMW":33.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398435,"projectNumber":"S1040","queueDate":"2022-12-16T05:00:00+00:00","inService":"2026-04-23T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Gibson City South (347114)","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398436,"projectNumber":"S1044","queueDate":"2023-04-17T04:00:00+00:00","inService":"2024-04-07T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Lake","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Green Acres 138 kV Substation (43684)","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398437,"projectNumber":"R1001","queueDate":"2020-05-15T04:00:00+00:00","inService":"2022-04-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Otter Tail","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Hoot Lake 115KV","summerNetMW":49.9,"winterNetMW":49.9,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398438,"projectNumber":"R1004","queueDate":"2020-12-30T05:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"De Soto Parish","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Dolet Hills 345 kV (Bus #500260)","summerNetMW":330.0,"winterNetMW":330.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398439,"projectNumber":"S1013","queueDate":"2022-01-26T05:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","negInService":"2026-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Lakefield Junction 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398440,"projectNumber":"S1017","queueDate":"2022-04-11T04:00:00+00:00","inService":"2023-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Tennyson 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398441,"projectNumber":"S1021","queueDate":"2022-04-25T04:00:00+00:00","doneDate":"2022-05-17T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Luce Substation","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398442,"projectNumber":"S1015","queueDate":"2022-04-11T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Delta","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Garden Corners 138kV","summerNetMW":55.0,"winterNetMW":55.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398443,"projectNumber":"S1019","queueDate":"2022-04-25T04:00:00+00:00","inService":"2023-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Redstone 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398444,"projectNumber":"S1024","queueDate":"2022-05-16T04:00:00+00:00","inService":"2023-01-26T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Wautoma 138kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398445,"projectNumber":"R1008","queueDate":"2021-04-12T04:00:00+00:00","transmissionOwner":"","county":"Adair","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"J499 Arbor Hills","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398446,"projectNumber":"R1012","queueDate":"2021-09-30T04:00:00+00:00","inService":"2023-07-01T04:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Linn County","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Duane Arnold 161 kV","summerNetMW":640.0,"winterNetMW":640.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398447,"projectNumber":"R1016","queueDate":"2022-02-18T05:00:00+00:00","inService":"2023-05-10T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS INC.","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Bailey 161kV substation(338879)","summerNetMW":122.0,"winterNetMW":124.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398448,"projectNumber":"S1027","queueDate":"2022-05-26T04:00:00+00:00","negInService":"2028-05-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Lake County","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398449,"projectNumber":"S1030","queueDate":"2022-06-13T04:00:00+00:00","inService":"2024-02-01T05:00:00+00:00","transmissionOwner":"","county":"Fayette","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398450,"projectNumber":"S1032","queueDate":"2022-08-19T04:00:00+00:00","inService":"2025-07-30T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella County","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Salt River Substation 138kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398451,"projectNumber":"S1036","queueDate":"2022-09-09T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"McLean","state":"ND","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Dickinson 345 kV, Buffalo, MN","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398452,"projectNumber":"S1037","queueDate":"2022-10-26T04:00:00+00:00","withdrawnDate":"2023-03-22T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":50.4,"winterNetMW":50.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398453,"projectNumber":"R1002","queueDate":"2020-07-01T04:00:00+00:00","inService":"2022-07-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Manitowoc","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Lake Front 69KV","summerNetMW":11.4,"winterNetMW":11.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398454,"projectNumber":"R1005","queueDate":"2021-01-19T05:00:00+00:00","inService":"2022-03-14T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Sherburne","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Elk River Station: S6 69 kV","summerNetMW":49.0,"winterNetMW":49.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398455,"projectNumber":"R1006","queueDate":"2021-02-15T05:00:00+00:00","inService":"2023-07-01T04:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Lima","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Hoot Lake 115KV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398456,"projectNumber":"R1009","queueDate":"2021-05-28T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2023-12-01T05:00:00+00:00","transmissionOwner":"METC","county":"Montmorency","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Consumers Energy 138kV Progress St. Substation","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398457,"projectNumber":"R1013","queueDate":"2021-11-16T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"AB Brown 138kV Substation","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398458,"projectNumber":"R1017","queueDate":"2022-02-15T05:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Des Moines","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Burlington 161kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398459,"projectNumber":"R1020","queueDate":"2022-03-31T04:00:00+00:00","inService":"2024-10-30T04:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Linn","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"ITC DAEC Substation 161kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398460,"projectNumber":"R1024","queueDate":"2022-10-12T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"A.B. Brown 138kV Substation","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398461,"projectNumber":"S1022","queueDate":"2022-05-02T04:00:00+00:00","inService":"2023-10-11T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Pike","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"PETEUA31 4.14kV","summerNetMW":3.0,"winterNetMW":3.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398462,"projectNumber":"S1025","queueDate":"2022-05-16T04:00:00+00:00","inService":"2022-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Rock","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Sheepskin 69kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398463,"projectNumber":"S1034","queueDate":"2022-08-15T04:00:00+00:00","inService":"2023-06-06T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dodge","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"North Beaver Dam 69kV - Bus 698222","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398464,"projectNumber":"R1021","queueDate":"2022-05-31T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Pike","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Petersburg 345kV Substation","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398465,"projectNumber":"R1025","queueDate":"2022-10-14T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"Southern Illinois Power Cooperative","county":"Williamson","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Marion Unit 4 -Main Bus","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"LEGACY: Done","sisPhase1":"","postGIAStatus":""},{"id":3398466,"projectNumber":"R1029","queueDate":"2022-12-12T05:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","negInService":"2024-12-01T05:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Joppa 161kV Switchyard","summerNetMW":37.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398467,"projectNumber":"R1032","queueDate":"2023-01-20T05:00:00+00:00","inService":"2025-03-30T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Wheaton Substation","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398468,"projectNumber":"R1036","queueDate":"2022-12-28T05:00:00+00:00","inService":"2024-05-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Sherburne","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Sherburne County 345kV Substation","summerNetMW":710.0,"winterNetMW":710.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398469,"projectNumber":"S1039","queueDate":"2022-09-01T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"","county":"Polk","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Apple River 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398470,"projectNumber":"S1043","queueDate":"2023-04-17T04:00:00+00:00","inService":"2024-04-07T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Dubois","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Culley to Dubois 138kV tap","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398471,"projectNumber":"R1000","queueDate":"2019-06-24T04:00:00+00:00","inService":"2022-10-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Morton","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"R.M. Heskett Station","summerNetMW":103.1,"winterNetMW":103.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398472,"projectNumber":"R1011","queueDate":"2021-10-04T04:00:00+00:00","inService":"2024-01-15T05:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Pike","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Petersburg 345kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398473,"projectNumber":"R1015","queueDate":"2022-02-13T05:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"Alliant Energy East","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Edgewater 345kV","summerNetMW":423.1,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398474,"projectNumber":"R1019","queueDate":"2022-02-15T05:00:00+00:00","inService":"2024-12-31T05:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Des Moines","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Burlington 161kV","summerNetMW":212.0,"winterNetMW":103.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398475,"projectNumber":"R1022","queueDate":"2022-05-31T04:00:00+00:00","inService":"2025-01-15T05:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Pike","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Petersburg 345kV Substation","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398476,"projectNumber":"R1028","queueDate":"2022-11-22T05:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398477,"projectNumber":"J3468","queueDate":"2024-04-12T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Day","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale - Twin Brooks 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398478,"projectNumber":"R1026","queueDate":"2022-11-22T05:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Linn County","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"ITC DAEC Substation 161kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398479,"projectNumber":"R1030","queueDate":"2023-01-05T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Slocum (PSSE Bus #264511)","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398480,"projectNumber":"R1033","queueDate":"2023-02-13T05:00:00+00:00","inService":"2024-02-01T05:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Waterford 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398481,"projectNumber":"J3472","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Lapeer","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398482,"projectNumber":"J3478","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Vigo","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Other_","summerNetMW":35.0,"winterNetMW":35.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398483,"projectNumber":"J3479","queueDate":"2024-04-12T04:00:00+00:00","inService":"2027-02-28T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Rapides","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Hineston","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398484,"projectNumber":"J3572","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-02T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Catahoula","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"METROPOLIS - RED GUM 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398485,"projectNumber":"R1034","queueDate":"2023-07-20T04:00:00+00:00","inService":"2025-06-30T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"ITCM Lansing","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398486,"projectNumber":"J3469","queueDate":"2024-04-16T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marathon","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Stratford - McMillan 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398487,"projectNumber":"J3634","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON ROAD","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398488,"projectNumber":"J3633","queueDate":"2024-04-13T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GREENWOOD - RAPSON (BANNER) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398489,"projectNumber":"J3470","queueDate":"2024-04-16T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398490,"projectNumber":"J3481","queueDate":"2024-04-12T04:00:00+00:00","inService":"2027-02-28T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"J1577 Sub (337689)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398491,"projectNumber":"J3496","queueDate":"2024-04-12T04:00:00+00:00","inService":"2027-12-03T05:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GREENWOOD - RAPSON 345.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398492,"projectNumber":"J3511","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Arkansas","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398493,"projectNumber":"J3278","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Swift","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SWENODA TAP - DUBLIN TAP - SS360 - 360WSM1 115.0kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398494,"projectNumber":"J3277","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-08-17T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398495,"projectNumber":"J3306","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"","county":"Perry","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"J3064","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398496,"projectNumber":"J3318","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom 345 kV Substation","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398497,"projectNumber":"J3471","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WAGNER - BATAVIA 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398498,"projectNumber":"J3477","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-28T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Carroll","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398499,"projectNumber":"J3480","queueDate":"2024-04-17T04:00:00+00:00","inService":"2026-05-25T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SCOTT LAKE","summerNetMW":199.9,"winterNetMW":199.9,"dp1ErisMw":199.9,"dp1NrisMw":199.9,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398500,"projectNumber":"J3507","queueDate":"2024-04-01T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Coffeen North 138kV","summerNetMW":17.0,"winterNetMW":17.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398501,"projectNumber":"J3325","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Cherokee","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LITTLE SIOUX - LEMARS TAP 161.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398502,"projectNumber":"J3326","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES - TRANSMISSION","county":"Lyon","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398503,"projectNumber":"J3509","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-12-17T05:00:00+00:00","transmissionOwner":"CITY WATER LIGHT & POWER","county":"Sangamon","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"343505 Interstate","summerNetMW":380.0,"winterNetMW":380.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398504,"projectNumber":"J3573","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GALION - OAK GROVE 115 SUB 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398505,"projectNumber":"J3367","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-01-10T05:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Avoyelles","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Marksville - Yellow Bayou 138.0kV","summerNetMW":88.0,"winterNetMW":88.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398506,"projectNumber":"J3385","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Pike","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pittsfield Trans. - Liberty 138.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398507,"projectNumber":"J3308","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Woodruff","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MOSES SWYD - AECC HUNTER NORTH 161.0kV","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398508,"projectNumber":"J3328","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hoopeston West","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398509,"projectNumber":"J3632","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cleveland","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TEXAS EASTERN P.S. G SS - FORDYCE ORIENT SS 115.0kV","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398510,"projectNumber":"J3309","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Copiah","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FRANKLIN EHV - RAY BRASWELL EHV 500.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398511,"projectNumber":"J3312","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-04T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Washington","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RAPTOR","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398512,"projectNumber":"J3317","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398513,"projectNumber":"J3826","queueDate":"2025-10-27T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"3Pickens","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398514,"projectNumber":"R5066","queueDate":"2025-04-10T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Columbia","summerNetMW":20.2,"winterNetMW":20.2,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Compressed Air Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398515,"projectNumber":"R1023","queueDate":"2022-09-29T04:00:00+00:00","inService":"2023-11-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jackson","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398516,"projectNumber":"R1027","queueDate":"2022-11-22T05:00:00+00:00","transmissionOwner":"Alliant Energy West","county":"Linn County","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"ITC DAEC Substation 161kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398517,"projectNumber":"R1031","queueDate":"2023-03-07T05:00:00+00:00","inService":"2024-12-01T05:00:00+00:00","negInService":"2025-11-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Edwards 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"LEGACY: Done","sisPhase1":"","postGIAStatus":""},{"id":3398518,"projectNumber":"J3316","queueDate":"2024-05-06T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Washington","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Okawville 138 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398519,"projectNumber":"J3340","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rossville 138kV on the Hoopeston to Vermilion 138kV Line","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398520,"projectNumber":"R1035","queueDate":"2023-04-19T04:00:00+00:00","inService":"2023-03-31T04:00:00+00:00","transmissionOwner":"","county":"Massac","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"JOPPA 161 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398521,"projectNumber":"J3508","queueDate":"2024-04-01T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Duck Creek 345kV","summerNetMW":16.3,"winterNetMW":16.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398522,"projectNumber":"J3510","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FISHER - CHERRY VALLEY 161.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398523,"projectNumber":"J3562","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4VERMILION - 4NCHAMPGN W 138.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398524,"projectNumber":"J3352","queueDate":"2024-04-16T04:00:00+00:00","inService":"2027-12-17T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Cape Girardeau","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LUTESVILLE","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398525,"projectNumber":"J3393","queueDate":"2024-04-11T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"HENDERSON UTILITY COMM DBA HENDERSON MUNICIPAL POWER AND LIGHT","county":"Henderson","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HMPL Sub No.4","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398526,"projectNumber":"J3635","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Kent","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GAINES","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398527,"projectNumber":"J3307","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-08-05T04:00:00+00:00","inService":"2027-11-02T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Callaway","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Callaway","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398528,"projectNumber":"J3392","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"PRAIRIE POWER, INC. PPI","county":"Scott","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Murrayville Jct. W - Roodhouse 69.0kV","summerNetMW":25.0,"winterNetMW":25.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398529,"projectNumber":"J3387","queueDate":"2024-04-18T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Connersville  - New Castle 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398530,"projectNumber":"J3327","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Pike","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cato 138/69kV (facilities above 100kV)","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398531,"projectNumber":"J3329","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Sullivan","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom (HED) -  Dresser 345.0kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398532,"projectNumber":"J3338","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-10-28T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Hamilton","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7W_FRFT_E - 7NORRIS   345.0kV","summerNetMW":199.99,"winterNetMW":199.99,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398533,"projectNumber":"J3353","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Rising","summerNetMW":191.3,"winterNetMW":191.3,"dp1ErisMw":191.3,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398534,"projectNumber":"J3366","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-08-18T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - TILLATOBA 230.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398535,"projectNumber":"J3369","queueDate":"2024-03-28T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Scott","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BLUE LAKE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398536,"projectNumber":"J3390","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Miami","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kokomo East - Converse 69.0kV","summerNetMW":37.0,"winterNetMW":37.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398537,"projectNumber":"J3391","queueDate":"2024-04-10T04:00:00+00:00","inService":"2027-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7CASEY    - 7KANSAS   345.0kV","summerNetMW":200.3,"winterNetMW":200.3,"dp1ErisMw":200.3,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398538,"projectNumber":"J3943","queueDate":"2025-02-21T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sandford","summerNetMW":337.0,"winterNetMW":337.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398539,"projectNumber":"S1108","queueDate":"2025-07-18T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaGrange","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"LAGRANGE","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398540,"projectNumber":"J3389","queueDate":"2024-03-27T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4KINMUNDY S - 4TANNER 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398541,"projectNumber":"J3386","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398542,"projectNumber":"J3388","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398543,"projectNumber":"J3972","queueDate":"2025-03-26T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2029-03-18T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CHINA - STOWELL 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398544,"projectNumber":"J3913","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"GLOSTER - LIBERTY 115.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398545,"projectNumber":"J3915","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2025-10-28T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Perry","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"E-NRIS","poiName":"Purvis Bulk 161 - Hintonville 161 161.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398546,"projectNumber":"J3887","queueDate":"2025-01-10T05:00:00+00:00","withdrawnDate":"2026-02-20T05:00:00+00:00","inService":"2030-12-31T05:00:00+00:00","transmissionOwner":"METC","county":"Montcalm","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"KENOWA - NELSON ROAD 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398547,"projectNumber":"J4071","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-01-20T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Livingston","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"COLY","summerNetMW":1500.0,"winterNetMW":1500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398548,"projectNumber":"J4000","queueDate":"2025-04-29T04:00:00+00:00","inService":"2030-01-28T05:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Scott","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7MEREDOSIA - 7TURNER 345.0kV","summerNetMW":343.0,"winterNetMW":343.0,"dp1ErisMw":343.0,"dp1NrisMw":343.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398549,"projectNumber":"J4006","queueDate":"2025-05-07T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Ringgold","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Orient - Denny 345kV","summerNetMW":289.8,"winterNetMW":289.8,"dp1ErisMw":289.8,"dp1NrisMw":289.8,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398550,"projectNumber":"J3967","queueDate":"2025-04-01T04:00:00+00:00","inService":"2029-12-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"MINDEN","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398551,"projectNumber":"J3966","queueDate":"2025-04-01T04:00:00+00:00","inService":"2029-12-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"GRASSMERE","summerNetMW":318.0,"winterNetMW":318.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398552,"projectNumber":"J3916","queueDate":"2024-10-25T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Saline","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4HARCO    - 4MUDDY    138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398553,"projectNumber":"J4075","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"St. Landry","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ville Platte - West Fork 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398554,"projectNumber":"J3330","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-11T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pleasant Prairie - Arcadian 345.0kV","summerNetMW":705.0,"winterNetMW":705.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398555,"projectNumber":"J3351","queueDate":"2024-04-04T04:00:00+00:00","withdrawnDate":"2025-03-13T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hickok","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398556,"projectNumber":"J3361","queueDate":"2024-04-12T04:00:00+00:00","inService":"2027-12-03T05:00:00+00:00","transmissionOwner":"ITC","county":"Bay","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":254.0,"winterNetMW":254.0,"dp1ErisMw":254.0,"dp1NrisMw":254.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398557,"projectNumber":"J3399","queueDate":"2024-04-09T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hampton - Prairie Island 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398558,"projectNumber":"J4004","queueDate":"2025-05-03T04:00:00+00:00","withdrawnDate":"2026-01-07T05:00:00+00:00","inService":"2032-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":392.0,"winterNetMW":392.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398559,"projectNumber":"J4001","queueDate":"2025-04-29T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Marion","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7MAYWOOD - 7PALMYRA  345.0kV","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":245.0,"dp1NrisMw":245.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398560,"projectNumber":"J4002","queueDate":"2025-04-30T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Edgar","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7KANSAS   - 08SUGCRK 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398561,"projectNumber":"J4003","queueDate":"2025-04-30T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Edgar","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7KANSAS - 08SUGCRK 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398562,"projectNumber":"J4005","queueDate":"2025-05-01T04:00:00+00:00","inService":"2028-02-29T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Petersburg - Sullivan (AEP/PJM) 345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398563,"projectNumber":"R5065","queueDate":"2025-04-09T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Allamakee","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Lansing","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3398564,"projectNumber":"J3944","queueDate":"2025-02-20T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Bureau","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4BUREAU - 4PRN_MUNI TP 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398565,"projectNumber":"J3953","queueDate":"2024-11-05T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2028-12-15T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Faulkner","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BONO - GREENBRIER 161.0kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398566,"projectNumber":"J3965","queueDate":"2025-04-07T04:00:00+00:00","withdrawnDate":"2025-12-22T05:00:00+00:00","inService":"2030-01-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7LATHAM - KINCAID  ; B 345.0kV","summerNetMW":401.8,"winterNetMW":401.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398567,"projectNumber":"J3964","queueDate":"2025-04-07T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Brookings","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Split Rock - White (WAPA) 345.0kV","summerNetMW":490.0,"winterNetMW":490.0,"dp1ErisMw":490.0,"dp1NrisMw":490.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398568,"projectNumber":"J3914","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COMPTON CO","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398569,"projectNumber":"J4070","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-06-28T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Emmons","state":"ND","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Linton NW","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398570,"projectNumber":"S1128","queueDate":"2025-11-20T05:00:00+00:00","inService":"2030-05-10T04:00:00+00:00","transmissionOwner":"CITY WATER LIGHT & POWER","county":"Sangamon","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"343515 Chatham Main - 346555 North Aurburn (Ameren) 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398571,"projectNumber":"S1123","queueDate":"2025-10-21T04:00:00+00:00","inService":"2027-03-29T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Cole - Penton Road 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398572,"projectNumber":"J4195","queueDate":"2025-10-09T04:00:00+00:00","inService":"2030-04-02T04:00:00+00:00","transmissionOwner":"ITC","county":"Clinton","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"ERIS","poiName":"GREENWOOD - RAPSON 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398573,"projectNumber":"S1127","queueDate":"2025-11-10T05:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","negInService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Washington","state":"MS","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"GERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398574,"projectNumber":"S1163","queueDate":"2026-02-16T19:38:17+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Newton","state":"IN","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"SIS","poiName":"MORRISON DITCH","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398575,"projectNumber":"J4171","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-04-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Racine","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"138 kV Jupiter Substation (#50167)","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398576,"projectNumber":"S1129","queueDate":"2025-10-07T04:00:00+00:00","inService":"2026-03-21T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Arnott - Golden Sands 138.0kV","summerNetMW":50.31,"winterNetMW":50.31,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398577,"projectNumber":"J4189","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Sunflower","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ROUNDAWAY SS (CE) - CLARKSDALE 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398578,"projectNumber":"J4029","queueDate":"2025-06-03T04:00:00+00:00","inService":"2025-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS INC. EAI","county":"Mississippi","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hybar 230kV","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":85.0,"dp1NrisMw":85.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398579,"projectNumber":"J3999","queueDate":"2025-04-14T04:00:00+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sugar Creek - Cayuga CT  345.0kV","summerNetMW":1540.0,"winterNetMW":1540.0,"dp1ErisMw":1540.0,"dp1NrisMw":1540.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398580,"projectNumber":"J4007","queueDate":"2025-05-15T04:00:00+00:00","inService":"2027-11-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Peoria","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7FARGO - 7SANDBURG 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398581,"projectNumber":"J4008","queueDate":"2025-05-02T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2027-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Henry","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Greensboro  -  New Castle 138 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398582,"projectNumber":"S1084","queueDate":"2025-01-13T05:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Worthington","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398583,"projectNumber":"J4058","queueDate":"2025-08-22T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"WYATT","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398584,"projectNumber":"J4197","queueDate":"2025-09-05T04:00:00+00:00","withdrawnDate":"2026-02-26T05:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Drew","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MONTICELLO EAST - REED SS 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398585,"projectNumber":"J4191","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Iberville","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"WEBRE","summerNetMW":755.0,"winterNetMW":805.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398586,"projectNumber":"J4090","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-03-17T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Schuyler","state":"MO","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398587,"projectNumber":"J4091","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Otter Tail","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ALEXANDRIA - BISON 345.0kV","summerNetMW":295.0,"winterNetMW":295.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398588,"projectNumber":"S1098","queueDate":"2025-05-30T04:00:00+00:00","withdrawnDate":"2025-12-18T05:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Itasca","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Boswell 230kV","summerNetMW":85.01,"winterNetMW":85.01,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398589,"projectNumber":"J3830","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":225.0,"dp1NrisMw":225.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398590,"projectNumber":"J4092","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"Deridder - Longville 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398591,"projectNumber":"J4147","queueDate":"2025-10-03T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Clay","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"ALEXANDRIA - BISON 345.0kV","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":245.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398592,"projectNumber":"J3998","queueDate":"2025-02-25T05:00:00+00:00","withdrawnDate":"2025-11-14T05:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Killdeer - Quinn 345kV","summerNetMW":450.0,"winterNetMW":450.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398593,"projectNumber":"S1090","queueDate":"2025-01-31T05:00:00+00:00","inService":"2026-09-24T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"EAST PARIS","summerNetMW":133.0,"winterNetMW":133.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398594,"projectNumber":"J4060","queueDate":"2025-08-20T04:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"McLeod","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blue Lake - MCLEOD (GRE) 230.0kV","summerNetMW":129.0,"winterNetMW":129.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398595,"projectNumber":"J4059","queueDate":"2025-08-20T04:00:00+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"McLeod","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Blue Lake - MCLEOD (GRE) 230.0kV","summerNetMW":129.0,"winterNetMW":129.0,"dp1ErisMw":129.0,"dp1NrisMw":129.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398596,"projectNumber":"J3993","queueDate":"2025-04-29T04:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2027-02-01T05:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Wayne","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Geff","summerNetMW":21.44,"winterNetMW":21.44,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398597,"projectNumber":"S1088","queueDate":"2025-03-17T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Benton","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"GRE-BENTON 7 115kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398598,"projectNumber":"S1114","queueDate":"2025-08-19T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Scott","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Alsey Generation Station","summerNetMW":168.8,"winterNetMW":168.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398599,"projectNumber":"J4084","queueDate":"2025-06-19T04:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Jefferson","state":"TX","studyCycle":"0MW GIA","studyGroup":"NA","studyPhase":"","svcType":"ERIS","poiName":"Rhodair","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Waste Heat Recovery","facilityType":"Co-gen","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398600,"projectNumber":"J4088","queueDate":"2025-10-06T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Lee","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wheatley 500 kV Switching Station (being built by J1710 & J1820)","summerNetMW":340.0,"winterNetMW":340.0,"dp1ErisMw":340.0,"dp1NrisMw":170.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398601,"projectNumber":"J4115","queueDate":"2025-10-06T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Fond du Lac","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"South Fond du Lac - Fitzgerald 345.0kV","summerNetMW":525.0,"winterNetMW":525.0,"dp1ErisMw":525.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398602,"projectNumber":"S1078","queueDate":"2025-02-18T05:00:00+00:00","inService":"2027-06-15T04:00:00+00:00","negInService":"2028-02-28T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Rock","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Magnolia","summerNetMW":72.0,"winterNetMW":72.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398603,"projectNumber":"S1110","queueDate":"2025-08-22T04:00:00+00:00","inService":"2027-02-01T05:00:00+00:00","negInService":"2027-01-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"CHISAGO COUNTY","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398604,"projectNumber":"J4199","queueDate":"2025-09-29T04:00:00+00:00","inService":"2029-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fulton","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Canton South","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398605,"projectNumber":"J4089","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-06-11T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Freeborn","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Hayward","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398606,"projectNumber":"J4161","queueDate":"2025-09-26T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Watonwan","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lakefield Generation SW - LAKEFIELD JCT 345.0kV","summerNetMW":1000.0,"winterNetMW":1000.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398607,"projectNumber":"J4204","queueDate":"2025-12-03T19:39:47+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Marion","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"South Belleville","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398608,"projectNumber":"J4162","queueDate":"2025-09-29T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2028-04-03T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Stearns","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Quarry - Alexandria 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398609,"projectNumber":"S1126","queueDate":"2025-10-23T04:00:00+00:00","inService":"2029-05-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Edwardsport Station IGCC","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398610,"projectNumber":"J4190","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-06-14T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Iberville","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WILLOW GLEN 230 SWYD","summerNetMW":707.0,"winterNetMW":707.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398611,"projectNumber":"J4173","queueDate":"2025-10-07T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wapello","state":"IA","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Ottumwa Generating St. 161 kV","summerNetMW":199.0,"winterNetMW":199.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398612,"projectNumber":"J4201","queueDate":"2025-09-30T04:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2029-08-24T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Beauregard","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cole","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398613,"projectNumber":"S1112","queueDate":"2025-08-11T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","negInService":"2027-04-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Pike","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Cato 138/69kV (facilities above 100kV)","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398614,"projectNumber":"J4116","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sugar Creek 345 kV","summerNetMW":950.0,"winterNetMW":950.0,"dp1ErisMw":950.0,"dp1NrisMw":950.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398615,"projectNumber":"J4174","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Poinsett","state":"AR","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"MARKED TREE","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398616,"projectNumber":"S1131","queueDate":"2025-11-11T05:00:00+00:00","inService":"2027-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"7JORD - 7CMDR 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398617,"projectNumber":"J3872","queueDate":"2025-01-27T05:00:00+00:00","inService":"2029-01-05T05:00:00+00:00","transmissionOwner":"ITC","county":"Wayne","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RIVER ROUGE","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":350.0,"dp1NrisMw":350.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398618,"projectNumber":"J3903","queueDate":"2025-02-19T05:00:00+00:00","inService":"2029-03-30T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Mower","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"North Austin - Adams (ITC) 161.0kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":185.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398619,"projectNumber":"J3874","queueDate":"2024-12-19T05:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"ERIS","poiName":"White Bluff EHV","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":770.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398620,"projectNumber":"J3936","queueDate":"2025-02-12T05:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"PARIS 345kV Substation","summerNetMW":133.0,"winterNetMW":133.0,"dp1ErisMw":133.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398621,"projectNumber":"R5085","queueDate":"2025-12-29T05:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398622,"projectNumber":"J4211","queueDate":"2025-11-15T02:56:26+00:00","inService":"2027-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"0MW GIA","studyGroup":"NA","studyPhase":"","svcType":"ERIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398623,"projectNumber":"R5073","queueDate":"2025-12-17T05:00:00+00:00","inService":"2027-04-28T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398624,"projectNumber":"R5074","queueDate":"2025-12-18T02:41:58+00:00","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398625,"projectNumber":"S1149","queueDate":"2026-02-09T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"IL","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398626,"projectNumber":"J2037","queueDate":"2021-07-20T04:00:00+00:00","withdrawnDate":"2021-11-23T05:00:00+00:00","inService":"2024-10-31T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Olmsted","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Byron 345 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398627,"projectNumber":"J1981","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Gibson","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Francisco - Toyota 138kV","summerNetMW":15.0,"winterNetMW":15.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398628,"projectNumber":"J2285","queueDate":"2021-07-14T04:00:00+00:00","withdrawnDate":"2021-09-10T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Praire - Winger","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398629,"projectNumber":"J1950","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Gibson","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Francisco - Toyota 138kV","summerNetMW":83.16,"winterNetMW":83.16,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398630,"projectNumber":"J3736","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-12-03T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Osage","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LOOSE CREEK","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398631,"projectNumber":"J3737","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-10-24T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mills","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HASTINGS","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398632,"projectNumber":"J3637","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Otsego","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LIVINGSTON - TITTABAWASSEE 345.0kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398633,"projectNumber":"J3597","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":348.0,"winterNetMW":348.0,"dp1ErisMw":348.0,"dp1NrisMw":226.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398634,"projectNumber":"J3594","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2024-09-10T04:00:00+00:00","inService":"2026-12-30T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ELTON - COMPTON TAP 69.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398635,"projectNumber":"J3640","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON ROAD - STYX 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398636,"projectNumber":"J3642","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-10-16T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Nordic","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398637,"projectNumber":"J4170","queueDate":"2025-10-07T04:00:00+00:00","inService":"2029-08-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Richland","state":"ND","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Hankinson - Wahpeton 230.0kV","summerNetMW":172.0,"winterNetMW":172.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398638,"projectNumber":"J2204","queueDate":"2021-10-29T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DUPO FERRY","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398639,"projectNumber":"J3596","queueDate":"2024-04-19T04:00:00+00:00","withdrawnDate":"2025-04-17T04:00:00+00:00","inService":"2029-07-02T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Harris","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BEVIL - CYPRESS 230.0kV","summerNetMW":460.0,"winterNetMW":460.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398640,"projectNumber":"J3641","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-10-16T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Amberg - Plains 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398641,"projectNumber":"J3666","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Morgan","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Petersburg - Thompson 345.0kV","summerNetMW":263.7,"winterNetMW":263.7,"dp1ErisMw":263.7,"dp1NrisMw":263.7,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398642,"projectNumber":"J3667","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-04-17T04:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Dickey","state":"ND","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398643,"projectNumber":"J3668","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"METC","county":"Cheboygan","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PORT CALCITE - RIGGSVILLE 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398644,"projectNumber":"J3689","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Montgomery","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398645,"projectNumber":"J1919","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2023-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Ingham","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Oneida-Majestic 345 kV","summerNetMW":132.0,"winterNetMW":132.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398646,"projectNumber":"J2019","queueDate":"2021-08-27T04:00:00+00:00","withdrawnDate":"2021-11-30T05:00:00+00:00","inService":"2025-02-17T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Rolette","state":"ND","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rugby-Glenborough 230 kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398647,"projectNumber":"J1977","queueDate":"2021-08-17T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Trenton 120kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398648,"projectNumber":"J3716","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-07-03T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV","summerNetMW":199.0,"winterNetMW":199.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398649,"projectNumber":"J3595","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - TILLATOBA 230.0kV","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398650,"projectNumber":"J3639","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Columbia - Rockdale 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398651,"projectNumber":"J3664","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-12-30T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaGrange","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398652,"projectNumber":"J3665","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-12-30T05:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Redwood","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Redwood Falls Tap - Redwood Falls West 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398653,"projectNumber":"J2110","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2025-09-16T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Gilmore 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398654,"projectNumber":"J3730","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Macoupin","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"MORO 345 kV Substation","summerNetMW":305.0,"winterNetMW":305.0,"dp1ErisMw":305.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398655,"projectNumber":"J3638","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-10-16T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Amberg - Plains 138.0kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398656,"projectNumber":"J3636","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BAUER","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398657,"projectNumber":"J3685","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pike","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4HULL     - 4MEPPEN T 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398658,"projectNumber":"J3686","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4AUSTIN - 4TAYLORVL 138.0kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":190.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398659,"projectNumber":"J1928","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Grant","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Hill Valley 345kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398660,"projectNumber":"J2111","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2025-09-16T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"ERIS","poiName":"Marion to Marked Tree 161kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398661,"projectNumber":"J3868","queueDate":"2024-12-02T05:00:00+00:00","withdrawnDate":"2025-09-11T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Sharp","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CAVE CITY","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398662,"projectNumber":"J3744","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"1995-10-23T04:00:00+00:00","negInService":"1995-10-23T04:00:00+00:00","transmissionOwner":"METC","county":"Mason","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MICHIGAN POWER - PEREMARQUETTE 138.0kV","summerNetMW":15.0,"winterNetMW":15.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3398663,"projectNumber":"S1104","queueDate":"2025-07-28T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Ramsey","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398664,"projectNumber":"J3791","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-16T04:00:00+00:00","inService":"2028-05-07T04:00:00+00:00","transmissionOwner":"SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY","county":"Houston","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Caledonia","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398665,"projectNumber":"S1182","queueDate":"2026-03-17T00:11:30+00:00","inService":"2027-02-19T05:00:00+00:00","transmissionOwner":"METC","county":"Isabella","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Salt River 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398666,"projectNumber":"J3739","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Warren","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"138kV Line Tap Between Galesburg Monmouth Boulevard (BUS 348956) and Castro JCT (BUS 348917). Distan","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398667,"projectNumber":"J3762","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Clay","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ALEXANDRIA - BISON 345.0kV","summerNetMW":430.0,"winterNetMW":430.0,"dp1ErisMw":430.0,"dp1NrisMw":430.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398668,"projectNumber":"J3768","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-10-01T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Walker","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ROCKY CREEK","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398669,"projectNumber":"J3284","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-05-05T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Woodford","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Spring Bay","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398670,"projectNumber":"J3290","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MAGNETATION","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398671,"projectNumber":"J3717","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-07-03T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Yalobusha","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ENID - TILLATOBA 230.0kV","summerNetMW":199.0,"winterNetMW":199.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398672,"projectNumber":"J3738","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-04-22T04:00:00+00:00","inService":"2026-12-09T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Vermilion","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gueydan Entergy Power Station 69kV","summerNetMW":65.0,"winterNetMW":65.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398673,"projectNumber":"J3869","queueDate":"2024-12-02T05:00:00+00:00","withdrawnDate":"2025-09-11T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Pike","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"5PIKE 1 - 5CALUMET 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398674,"projectNumber":"J3790","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MARIANNA - WEST HELENA 115.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398675,"projectNumber":"J3759","queueDate":"2024-04-01T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Newton Switchyard","summerNetMW":15.0,"winterNetMW":15.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398676,"projectNumber":"J3285","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2024-08-30T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TH Pfizer Jct. - Worthington (HED)","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398677,"projectNumber":"J3675","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2029-09-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Greene","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SEDGEWICK SS - AECC LIGHT 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398678,"projectNumber":"J3676","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-12-15T05:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Otsego","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Gaylord - Atlanta 138.0kV","summerNetMW":93.0,"winterNetMW":93.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398679,"projectNumber":"J3291","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaGrange","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HIPLE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398680,"projectNumber":"J3681","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"7CLINTON  - 7BROKAW 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398681,"projectNumber":"J3688","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"White","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Luse Road Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398682,"projectNumber":"J3687","queueDate":"2024-04-16T04:00:00+00:00","inService":"2027-07-23T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Fayette","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4OTEGO - 4KINMUNDY 138.0kV","summerNetMW":113.0,"winterNetMW":113.0,"dp1ErisMw":113.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398683,"projectNumber":"J1941","queueDate":"2021-08-25T04:00:00+00:00","withdrawnDate":"2021-10-22T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Crookston","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398684,"projectNumber":"J3788","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Grant","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC GRAPEVINE - CARTHAGE (AR) 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398685,"projectNumber":"J2306","queueDate":"2021-07-21T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-11-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Commodore-Jordan","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398686,"projectNumber":"J1968","queueDate":"2021-08-18T04:00:00+00:00","withdrawnDate":"2021-10-22T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Polk","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Crookston","summerNetMW":30.0,"winterNetMW":30.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398687,"projectNumber":"J3677","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-16T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Daviess","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":148.0,"winterNetMW":148.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398688,"projectNumber":"J1878","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Decatur","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HE Westport 138kV","summerNetMW":145.0,"winterNetMW":145.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398689,"projectNumber":"J1879","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Decatur","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HE Westport 138kV","summerNetMW":43.5,"winterNetMW":43.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398690,"projectNumber":"J4207","queueDate":"2025-12-20T03:36:16+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398691,"projectNumber":"J3789","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-02-13T05:00:00+00:00","inService":"2028-07-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hancock","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FOUNTAINTOWN","summerNetMW":77.0,"winterNetMW":77.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398692,"projectNumber":"S1180","queueDate":"2026-03-16T23:24:06+00:00","inService":"2028-09-12T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Story County","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398693,"projectNumber":"S1183","queueDate":"2026-03-17T00:30:05+00:00","inService":"2027-02-19T05:00:00+00:00","transmissionOwner":"METC","county":"Isabella","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Salt River 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398694,"projectNumber":"S1150","queueDate":"2026-03-24T04:19:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"IL","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398695,"projectNumber":"J4238","queueDate":"2026-04-10T01:25:06+00:00","inService":"2029-12-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398696,"projectNumber":"R5094","queueDate":"2026-01-03T07:08:00+00:00","inService":"2023-01-03T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398697,"projectNumber":"S1154","queueDate":"2026-03-10T21:41:58+00:00","inService":"2029-12-01T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"","state":"MN","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398698,"projectNumber":"J3752","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-10-01T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Aitkin","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cromwell (GRE) - Riverton 115kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398699,"projectNumber":"J3760","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Richland","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV","summerNetMW":405.0,"winterNetMW":405.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398700,"projectNumber":"J3288","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-15T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Carroll","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Kokomo Webster St.  - Walton 230.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398701,"projectNumber":"J3289","queueDate":"2024-04-17T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Sherburne","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ELK RIVER 14","summerNetMW":60.0,"winterNetMW":60.0,"dp1ErisMw":35.0,"dp1NrisMw":60.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398702,"projectNumber":"S1138","queueDate":"2025-12-13T01:31:09+00:00","inService":"2027-03-27T04:00:00+00:00","negInService":"2026-12-22T05:00:00+00:00","transmissionOwner":"METC","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398703,"projectNumber":"J4206","queueDate":"2025-12-20T03:35:57+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398704,"projectNumber":"S1148","queueDate":"2026-01-09T03:31:13+00:00","inService":"2027-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Rock","state":"MN","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Magnolia","summerNetMW":230.0,"winterNetMW":230.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398705,"projectNumber":"J3678","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CAYUGA 345","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398706,"projectNumber":"J3674","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4NEWTON   - 4WISEMAN 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398707,"projectNumber":"J4223","queueDate":"2026-03-11T20:22:10+00:00","inService":"2029-04-03T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398708,"projectNumber":"S1136","queueDate":"2025-12-19T22:52:01+00:00","inService":"2026-12-04T05:00:00+00:00","negInService":"2027-01-08T05:00:00+00:00","transmissionOwner":"METC","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398709,"projectNumber":"R5089","queueDate":"2026-01-01T00:47:48+00:00","inService":"2027-08-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398710,"projectNumber":"S1147","queueDate":"2026-01-17T01:27:24+00:00","inService":"2027-01-07T05:00:00+00:00","transmissionOwner":"METC","county":"","state":"MI","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":132.0,"winterNetMW":132.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398711,"projectNumber":"S1158","queueDate":"2026-02-06T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Story","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Story County","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398712,"projectNumber":"S1133","queueDate":"2026-02-11T05:00:00+00:00","inService":"2029-01-09T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Sangamon","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"343515 Chatham Main - 346555 North Aurburn (Ameren) 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398713,"projectNumber":"J2256","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-09-17T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Humboldt","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Irvington - Webster 345kV Line","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398714,"projectNumber":"J3840","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"St. Landry","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Wells","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398715,"projectNumber":"J3292","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"RITCHIE SWYD - TARLETON 230.0kV","summerNetMW":193.0,"winterNetMW":193.0,"dp1ErisMw":193.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398716,"projectNumber":"J3673","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"GOODLAND - MORRISON DITCH 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398717,"projectNumber":"J3680","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-11-15T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Scott","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PELAHATCHIE","summerNetMW":189.0,"winterNetMW":189.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398718,"projectNumber":"J3679","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-01-31T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"LaPorte","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BABCOCK - STILLWELL 345.0kV","summerNetMW":149.0,"winterNetMW":149.0,"dp1ErisMw":149.0,"dp1NrisMw":115.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398719,"projectNumber":"S1130","queueDate":"2026-01-29T22:56:59+00:00","inService":"2027-03-15T04:00:00+00:00","negInService":"2027-03-15T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398720,"projectNumber":"R5091","queueDate":"2026-01-09T02:25:07+00:00","inService":"2027-11-14T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"ERIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398721,"projectNumber":"J4231","queueDate":"2026-03-20T19:05:07+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Pike","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398722,"projectNumber":"J4212","queueDate":"2026-02-18T07:21:38+00:00","inService":"2030-01-06T05:00:00+00:00","transmissionOwner":"ITC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398723,"projectNumber":"J4213","queueDate":"2026-02-18T03:20:21+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398724,"projectNumber":"R5097","queueDate":"2026-02-04T06:30:30+00:00","inService":"2027-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse Parish","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"ERIS","poiName":"Sterlington - Bastrop 115 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398725,"projectNumber":"J4209","queueDate":"2025-12-20T03:34:56+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398726,"projectNumber":"J4222","queueDate":"2026-03-11T20:22:09+00:00","inService":"2029-04-03T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398727,"projectNumber":"J4214","queueDate":"2026-02-18T02:43:26+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398728,"projectNumber":"R5090","queueDate":"2025-12-30T00:33:06+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398729,"projectNumber":"S1144","queueDate":"2026-02-10T05:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398730,"projectNumber":"S1165","queueDate":"2026-03-31T02:47:33+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"WI","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398731,"projectNumber":"J4215","queueDate":"2026-02-18T02:47:47+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398732,"projectNumber":"S1152","queueDate":"2026-04-15T07:38:42+00:00","inService":"2028-07-03T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"","state":"MO","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":139.0,"winterNetMW":139.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398733,"projectNumber":"J3870","queueDate":"2024-12-23T05:00:00+00:00","inService":"2024-01-26T05:00:00+00:00","negInService":"2002-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SUGAR CREEK","summerNetMW":87.0,"winterNetMW":87.0,"dp1ErisMw":87.0,"dp1NrisMw":87.0,"dp2ErisMw":87.0,"dp2NrisMw":87.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398734,"projectNumber":"J4249","queueDate":"2026-06-03T17:30:43+00:00","inService":"2031-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398735,"projectNumber":"J4245","queueDate":"2026-06-25T20:02:21+00:00","inService":"2031-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398736,"projectNumber":"J4244","queueDate":"2026-06-06T02:06:17+00:00","inService":"2031-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398737,"projectNumber":"S1167","queueDate":"2026-07-02T04:00:00+00:00","inService":"2028-12-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Greenway 138 kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398738,"projectNumber":"J3234","queueDate":"2024-03-28T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Carver","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ST BONIFACIUS","summerNetMW":130.0,"winterNetMW":130.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398739,"projectNumber":"J3235","queueDate":"2024-03-28T04:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Benton","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cherry Park Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398740,"projectNumber":"J3236","queueDate":"2024-03-28T04:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Chisago County 115kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398741,"projectNumber":"J3241","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-25T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Lincoln","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ARLINGTON GOAB","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398742,"projectNumber":"J3282","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Mason","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"KEYSTONE - LUDINGTON 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398743,"projectNumber":"J3280","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Dickey","state":"ND","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398744,"projectNumber":"J4254","queueDate":"2026-08-08T05:14:01+00:00","inService":"2031-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398745,"projectNumber":"J4243","queueDate":"2026-06-08T02:28:38+00:00","inService":"2031-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398746,"projectNumber":"J3233","queueDate":"2024-03-28T04:00:00+00:00","inService":"2028-01-15T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Yellow Medicine","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Canby 115 kV Substation","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398747,"projectNumber":"J3283","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"METC","county":"Grand Traverse","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"KEYSTONE - WEXFORD 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398748,"projectNumber":"J3281","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Marquette","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Presque Isle - North Lake 138.0kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398749,"projectNumber":"J3466","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Winnebago","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FTZGERLD","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":75.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398750,"projectNumber":"J3465","queueDate":"2024-03-27T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Isanti","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CAMBRIDGE","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":20.0,"dp1NrisMw":40.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398751,"projectNumber":"J3512","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Bay","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MONITOR","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398752,"projectNumber":"J3513","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Acadia","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RICHARD - WELLS 500.0kV","summerNetMW":550.0,"winterNetMW":550.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398753,"projectNumber":"J3540","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-05-13T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Monroe","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"RITCHIE SWYD - TARLETON 230.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398754,"projectNumber":"J3541","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-05-13T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Bolivar","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"CLEVELAND/SOUTH","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398755,"projectNumber":"J3565","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rising","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398756,"projectNumber":"J3570","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC WYNNE EAST - PARKIN 161.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398757,"projectNumber":"J3571","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-08-28T04:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MARKED TREE - TWIST 161.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398758,"projectNumber":"J3567","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-05-09T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Calhoun","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398759,"projectNumber":"J3467","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2027-04-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bloomington Brokaw","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398760,"projectNumber":"J3494","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Greene","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TH Pfizer Jct. - Worthington (HED)","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398761,"projectNumber":"J3556","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Montgomery","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7COFFEEN  - 7PANA     345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398762,"projectNumber":"J3563","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Franklin","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7W_FRFT_E - 7MTVERNW 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398763,"projectNumber":"J3576","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Walthall","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"BOGALUSA 500 SS - FRANKLIN EHV 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398764,"projectNumber":"J3580","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398765,"projectNumber":"J3583","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HOLLAND BOTTOM - KEO EHV 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398766,"projectNumber":"J3584","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-03-28T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BRINKLEY EAST - AECC AUBREY 230.0kV","summerNetMW":215.0,"winterNetMW":215.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398767,"projectNumber":"J4248","queueDate":"2026-06-25T19:26:56+00:00","inService":"2031-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398768,"projectNumber":"J3255","queueDate":"2024-04-13T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398769,"projectNumber":"R5082","queueDate":"2026-02-03T20:14:47+00:00","inService":"2028-01-02T05:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398770,"projectNumber":"J4247","queueDate":"2026-06-24T22:51:21+00:00","inService":"2031-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398771,"projectNumber":"J3253","queueDate":"2024-03-26T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT","county":"Woodruff","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Bailey","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398772,"projectNumber":"J3273","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Madison","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV","summerNetMW":473.8,"winterNetMW":473.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398773,"projectNumber":"J3279","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-09-04T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.MDU","county":"Day","state":"SD","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Ellendale 345 - Twin Brooks 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398774,"projectNumber":"J3514","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-04-17T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Chippewa","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pine River 69 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398775,"projectNumber":"J3538","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2027-03-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Warren","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Baxter 115/34kV","summerNetMW":730.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398776,"projectNumber":"J3542","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Lincoln","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398777,"projectNumber":"J3557","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"INDIANAPOLIS POWER & LIGHT COMPANY","county":"Morgan","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Heartland Crossing Tap - Eagle Valley 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398778,"projectNumber":"J3495","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Greene","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Merom Primary - Worthington Primary 345.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":220.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398779,"projectNumber":"J3539","queueDate":"2024-03-28T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Alcona","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ALPENA - SPRUCE ROAD 138.0kV","summerNetMW":116.9,"winterNetMW":116.9,"dp1ErisMw":116.9,"dp1NrisMw":116.9,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398780,"projectNumber":"J3558","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Rising","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398781,"projectNumber":"J3564","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":275.0,"winterNetMW":275.0,"dp1ErisMw":275.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398782,"projectNumber":"J3566","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Other_","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":198.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398783,"projectNumber":"J3568","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-07-31T04:00:00+00:00","inService":"2028-05-13T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Leflore","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"SCHLATER","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398784,"projectNumber":"J3569","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"TRUMANN - HARRISBURG SS 161.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398785,"projectNumber":"J3581","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-05-31T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Avoyelles","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Eola - Marksville 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398786,"projectNumber":"J3575","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GILMORE - WILSON 161.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398787,"projectNumber":"J3579","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lee","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MARIANNA WEST SS - MARIANNA 115.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398788,"projectNumber":"J3585","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Sabine","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"ERIS","poiName":"HARTBURG - AEP LAYFIELD 500.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398789,"projectNumber":"J3313","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MOROCCO  - ALLEN JUNCTION 345.0kV","summerNetMW":263.0,"winterNetMW":263.0,"dp1ErisMw":263.0,"dp1NrisMw":263.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398790,"projectNumber":"J3582","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2024-10-17T04:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Longville - Nelson (EES) 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":"Withdrawn"},{"id":3398791,"projectNumber":"J3314","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-05-23T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Clayton","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Postville","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398792,"projectNumber":"J3321","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Wayne","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398793,"projectNumber":"J3346","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Lyon","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398794,"projectNumber":"J3370","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-08-28T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Kittson","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398795,"projectNumber":"J3384","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Big Stone","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Big Stone South - Alexandria 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398796,"projectNumber":"J3577","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-11-15T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Simpson","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MAGEE - NEW HEBRON 115.0kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398797,"projectNumber":"J3593","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-10-01T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Clay","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Wabash River  -  Staunton 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398798,"projectNumber":"J3347","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Hancock","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Greenfield Hastings Park - Greensboro 138.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398799,"projectNumber":"J3357","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Kosciusko","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LEESBURG","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398800,"projectNumber":"J3403","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-08-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398801,"projectNumber":"J3426","queueDate":"2024-03-19T04:00:00+00:00","withdrawnDate":"2025-07-01T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Chicot","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MACON LAKE SS","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398802,"projectNumber":"J3322","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-06-03T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON 500 SWYD - RICHARD 500.0kV","summerNetMW":325.0,"winterNetMW":325.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398803,"projectNumber":"J3430","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Lawrence","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4LAWRNCVL - 4JASPER 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398804,"projectNumber":"J3808","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Webster","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"IRVINGTON - WEBSTER 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398805,"projectNumber":"J3815","queueDate":"2024-06-29T04:00:00+00:00","inService":"2026-10-22T04:00:00+00:00","negInService":"2026-10-22T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Charles","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Waterford 3 SWYD","summerNetMW":153.1,"winterNetMW":59.5,"dp1ErisMw":59.5,"dp1NrisMw":153.1,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398806,"projectNumber":"J3363","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tensas","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RED GUM","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398807,"projectNumber":"J3362","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Oakland","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BLACKFOOT - MADRID 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398808,"projectNumber":"J3371","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398809,"projectNumber":"J3381","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2026-01-07T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"FORREST CITY SOUTH - HUGHES 161.0kV","summerNetMW":150.92,"winterNetMW":150.92,"dp1ErisMw":150.92,"dp1NrisMw":150.92,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398810,"projectNumber":"J3382","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Piatt","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4WEEDMAN  - 4MAHOMET 1 138.0kV","summerNetMW":171.0,"winterNetMW":171.0,"dp1ErisMw":171.0,"dp1NrisMw":171.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398811,"projectNumber":"J3383","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Boone","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Nucor  -  Whitestown 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398812,"projectNumber":"J3440","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Daviess","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398813,"projectNumber":"J3442","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Scott","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"5STODDARD - 5MORLEY (AECI) 161.0kV","summerNetMW":156.0,"winterNetMW":156.0,"dp1ErisMw":156.0,"dp1NrisMw":156.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398814,"projectNumber":"J3823","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-09-26T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Watonwan","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Crandall - Fieldon 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398815,"projectNumber":"J3787","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Stutsman","state":"ND","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Jamestown 345 kV Substation","summerNetMW":247.0,"winterNetMW":247.0,"dp1ErisMw":247.0,"dp1NrisMw":247.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398816,"projectNumber":"J3786","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-03-13T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Coventry 230kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398817,"projectNumber":"J3784","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Ozaukee","state":"WI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Saukville (Cedarsauk)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398818,"projectNumber":"J3431","queueDate":"2024-03-19T04:00:00+00:00","withdrawnDate":"2025-08-25T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Holmes","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398819,"projectNumber":"J3811","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clay","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4KINMUNDY S - 4TANNER 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398820,"projectNumber":"J3323","queueDate":"2024-04-12T04:00:00+00:00","withdrawnDate":"2025-08-18T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Knox","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398821,"projectNumber":"J3348","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"PLYMOUTH - KOSCIUSKO & LEESBURG & KOSCIUSKO CO REMC - NORTHWEST 138.0kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398822,"projectNumber":"J3424","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Posey","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AB Brown 345 - Gibson (Duke Terminal) 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398823,"projectNumber":"J3436","queueDate":"2024-04-17T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Daviess","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398824,"projectNumber":"J3432","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Lawrence","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4LAWRNCVL - 4JASPER 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398825,"projectNumber":"J3433","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE DPC","county":"Barron","state":"WI","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BARRON  - WASHCO  161.0kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398826,"projectNumber":"J3434","queueDate":"2024-03-18T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"MISSOURI RIVER ENERGY SERVICES - TRANSMISSION","county":"Kandiyohi","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Willmar","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398827,"projectNumber":"J3803","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LEMOYNE - MAJESTIC 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398828,"projectNumber":"J3807","queueDate":"2024-04-09T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hampton - Prairie Island 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398829,"projectNumber":"J3782","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-07-26T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"18MURPHY","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398830,"projectNumber":"J3987","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Amite","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SMITHDALE SS (CE) - LIBERTY 115.0kV","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398831,"projectNumber":"J3997","queueDate":"2025-05-01T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2028-02-10T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Pike","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gibson Sta  - Petersburg - (IP&L) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398832,"projectNumber":"J3994","queueDate":"2025-04-17T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Monroe","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"18MOROCCO 256583","summerNetMW":360.0,"winterNetMW":360.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398833,"projectNumber":"J3996","queueDate":"2025-04-29T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"St. Charles","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SIOUX","summerNetMW":2220.0,"winterNetMW":2220.0,"dp1ErisMw":2200.0,"dp1NrisMw":2200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398834,"projectNumber":"J3812","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BALD KNOB T.E.T.C. P.S. #6 SS - AECC COFFEEVILLE 161.0kV","summerNetMW":158.59,"winterNetMW":158.59,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398835,"projectNumber":"J3820","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Hancock","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LRTP Line","summerNetMW":127.0,"winterNetMW":127.0,"dp1ErisMw":127.0,"dp1NrisMw":127.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398836,"projectNumber":"J3938","queueDate":"2025-04-01T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BURR OAK - EAST WINAMAC 138.0 kV","summerNetMW":123.0,"winterNetMW":123.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398837,"projectNumber":"J3982","queueDate":"2024-12-24T05:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Lonoke","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":319.5,"winterNetMW":319.5,"dp1ErisMw":319.5,"dp1NrisMw":128.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398838,"projectNumber":"J3822","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Pointe Coupee","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DEVIN - LIVONIA 138.0kV","summerNetMW":139.58,"winterNetMW":139.58,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398839,"projectNumber":"J3781","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-07-27T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"HEBERT (SLEMCO) - HENNING 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398840,"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Buchanan","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Hazleton","summerNetMW":205.0,"winterNetMW":205.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398841,"projectNumber":"J3935","queueDate":"2025-02-28T05:00:00+00:00","inService":"2030-03-01T05:00:00+00:00","transmissionOwner":"METC","county":"Genesee","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"THETFORD","summerNetMW":975.4,"winterNetMW":975.4,"dp1ErisMw":975.4,"dp1NrisMw":975.4,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398842,"projectNumber":"J3995","queueDate":"2025-04-23T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-07-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jasper","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"7CASEY    - 7NEWTON   345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398843,"projectNumber":"J3961","queueDate":"2025-04-07T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lincoln","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"YANKEE","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398844,"projectNumber":"J3783","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"AECC WYNNE EAST - PARKIN 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398845,"projectNumber":"S1101","queueDate":"2025-06-16T04:00:00+00:00","inService":"2027-10-31T04:00:00+00:00","negInService":"2028-01-20T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"BRINKLEY EAST - AECC AUBREY 230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398846,"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00","inService":"2027-05-28T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Perry","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"7ASTER - 7CMDR 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398847,"projectNumber":"J3988","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NORTH BASTROP TAP - LOG CABIN (LAGEN) 115.0kV","summerNetMW":85.0,"winterNetMW":85.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398848,"projectNumber":"J3941","queueDate":"2025-03-26T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Deuel","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Astoria 345kV substation","summerNetMW":1144.0,"winterNetMW":1144.0,"dp1ErisMw":1144.0,"dp1NrisMw":744.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398849,"projectNumber":"J3959","queueDate":"2025-04-17T04:00:00+00:00","inService":"2029-11-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Grundy","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398850,"projectNumber":"J3960","queueDate":"2025-04-08T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Lac qui Parle","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South - Deuel County 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398851,"projectNumber":"J3962","queueDate":"2025-03-12T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"BAUER - HAMPTON 1 345.0kV","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind/Battery","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398852,"projectNumber":"R5070","queueDate":"2025-08-26T04:00:00+00:00","negInService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Duane Arnold (ARNOLD 5)","summerNetMW":64.0,"winterNetMW":64.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398853,"projectNumber":"S1107","queueDate":"2025-07-08T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","negInService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Calamus East","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398854,"projectNumber":"J3806","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STEINER (CE) - SHAW SS (CE) 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398855,"projectNumber":"J3810","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398856,"projectNumber":"J3814","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Cross","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS-Only","poiName":"FORREST CITY N SS - WYNNE SOUTH 161.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398857,"projectNumber":"J3813","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398858,"projectNumber":"R5071","queueDate":"2025-08-26T04:00:00+00:00","negInService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Duane Arnold (ARNOLD 5)","summerNetMW":251.0,"winterNetMW":251.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398859,"projectNumber":"J4061","queueDate":"2025-08-07T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Lenawee","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"KNOWLES - MOORE ROAD 138.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398860,"projectNumber":"J3821","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Walker","state":"TX","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"RIVTRIN","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398861,"projectNumber":"J3785","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ATC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pleasant Prairie","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398862,"projectNumber":"J3796","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Calcasieu","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"NELSON 230 SWYD","summerNetMW":735.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined-Cycle – Steam Plant","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398863,"projectNumber":"R5063","queueDate":"2025-05-09T04:00:00+00:00","transmissionOwner":"METC","county":"Shiawassee","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"BELL ROAD - CORNELL 138.0kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398864,"projectNumber":"J3986","queueDate":"2024-10-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"JACINTO - PEACH CREEK 230.0kV","summerNetMW":270.0,"winterNetMW":270.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398865,"projectNumber":"J3985","queueDate":"2024-11-18T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-02T04:00:00+00:00","transmissionOwner":"SAM HOUSTON ELECTRIC COOPERATIVE, INC.SHTO","county":"Polk","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SHECO/ETEC, BUS#334130","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398866,"projectNumber":"J3989","queueDate":"2025-04-01T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Williamson","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Marion North","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398867,"projectNumber":"J3937","queueDate":"2025-04-01T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Dallas","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SHERIDAN EHV - EL DORADO EHV 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398868,"projectNumber":"J3940","queueDate":"2025-02-14T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Isabella","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SALT RIVER - WARREN 138.0kV","summerNetMW":214.0,"winterNetMW":214.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398869,"projectNumber":"J3942","queueDate":"2025-02-20T05:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Sandford","summerNetMW":365.0,"winterNetMW":365.0,"dp1ErisMw":365.0,"dp1NrisMw":365.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398870,"projectNumber":"J3957","queueDate":"2025-04-17T04:00:00+00:00","inService":"2029-11-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Sullivan","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398871,"projectNumber":"J3963","queueDate":"2025-04-07T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Brookings","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BROOKINGS COUNTY","summerNetMW":490.0,"winterNetMW":490.0,"dp1ErisMw":490.0,"dp1NrisMw":490.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398872,"projectNumber":"J3958","queueDate":"2025-04-17T04:00:00+00:00","withdrawnDate":"2025-10-22T04:00:00+00:00","inService":"2029-11-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Sullivan","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398873,"projectNumber":"R5069","queueDate":"2025-08-26T04:00:00+00:00","negInService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Duane Arnold (ARNOLD 5)","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398874,"projectNumber":"J4057","queueDate":"2025-08-22T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-05-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Mower","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"YANKEE","summerNetMW":127.4,"winterNetMW":127.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398875,"projectNumber":"J4054","queueDate":"2025-09-18T04:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Saginaw","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"CLAREMONT - LAYTON 138.0kV","summerNetMW":146.0,"winterNetMW":146.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398876,"projectNumber":"J3930","queueDate":"2025-02-13T05:00:00+00:00","withdrawnDate":"2026-04-17T04:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Iberia","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Morbihan","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398877,"projectNumber":"J4102","queueDate":"2025-10-10T04:00:00+00:00","inService":"2029-08-31T04:00:00+00:00","transmissionOwner":"METC","county":"Cass","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"WEEDS LAKE - HIPLE 345.0kV","summerNetMW":539.0,"winterNetMW":539.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398878,"projectNumber":"J4103","queueDate":"2025-10-06T04:00:00+00:00","inService":"2029-06-30T04:00:00+00:00","transmissionOwner":"SAM HOUSTON ELECTRIC COOPERATIVE, INC.","county":"Trinity","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ONALASKA","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398879,"projectNumber":"J4106","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2027-02-15T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Buffalo 345 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398880,"projectNumber":"J4056","queueDate":"2025-08-27T04:00:00+00:00","inService":"2030-08-01T04:00:00+00:00","transmissionOwner":"THE MUNICIPAL ELECTRIC UTILITY OF THE CITY OF CEDAR FALLS, IOWA","county":"Marshall","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lehigh - Marshalltown (Twinkle) 345kV","summerNetMW":310.0,"winterNetMW":310.0,"dp1ErisMw":310.0,"dp1NrisMw":310.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398881,"projectNumber":"J4055","queueDate":"2025-08-29T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Ionia","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS-Only","poiName":"Peddler","summerNetMW":198.0,"winterNetMW":198.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398882,"projectNumber":"J3904","queueDate":"2025-03-12T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398883,"projectNumber":"J3920","queueDate":"2025-03-10T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Clay","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398884,"projectNumber":"J3919","queueDate":"2025-03-07T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-11-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Lincoln","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398885,"projectNumber":"J4104","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Houston","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398886,"projectNumber":"R5072","queueDate":"2025-08-26T04:00:00+00:00","negInService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Duane Arnold (ARNOLD 5)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398887,"projectNumber":"R5067","queueDate":"2025-07-03T04:00:00+00:00","negInService":"2028-05-31T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Lake","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"NIPSCO Green Acres 138kV Sub","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398888,"projectNumber":"J3892","queueDate":"2025-01-29T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"CITY WATER LIGHT & POWER","county":"Sangamon","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"343506 Eastdale","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398889,"projectNumber":"J3902","queueDate":"2025-02-06T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Jefferson","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STOWELL","summerNetMW":288.5,"winterNetMW":288.5,"dp1ErisMw":218.94,"dp1NrisMw":218.94,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398890,"projectNumber":"S1096","queueDate":"2025-05-20T04:00:00+00:00","inService":"2028-02-01T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Wood","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Saratoga - Badger West 138.0kV","summerNetMW":50.3,"winterNetMW":50.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398891,"projectNumber":"J4101","queueDate":"2025-10-07T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Jefferson","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"University (UWW)","summerNetMW":71.0,"winterNetMW":71.0,"dp1ErisMw":71.0,"dp1NrisMw":35.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398892,"projectNumber":"J4127","queueDate":"2025-09-18T04:00:00+00:00","inService":"2029-01-19T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Barron","state":"WI","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ridgeland","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":90.0,"dp1NrisMw":90.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398893,"projectNumber":"R5093","queueDate":"2025-10-14T04:00:00+00:00","inService":"2023-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. James","state":"LA","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"NRIS","poiName":"VACHERIE","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398894,"projectNumber":"J4105","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Cass","state":"ND","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Buffalo 345 kV Substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398895,"projectNumber":"J4125","queueDate":"2025-09-16T04:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398896,"projectNumber":"R5086","queueDate":"2025-10-17T04:00:00+00:00","inService":"2028-02-29T05:00:00+00:00","transmissionOwner":"","county":"Pointe Coupee","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Big Cajun II 500kV Substation","summerNetMW":593.0,"winterNetMW":593.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398897,"projectNumber":"S1151","queueDate":"2025-11-19T05:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Jefferson","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"University (UWW)","summerNetMW":109.0,"winterNetMW":109.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398898,"projectNumber":"J4126","queueDate":"2025-09-16T04:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"MOROCCO  - ALLEN JUNCTION 345.0kV","summerNetMW":112.0,"winterNetMW":112.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398899,"projectNumber":"J4193","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Meeker","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"SHERBURNE CO","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398900,"projectNumber":"J3891","queueDate":"2025-01-31T05:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2030-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Pope","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ATKINS","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398901,"projectNumber":"J4192","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-04-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Racine","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Bain - State Line 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398902,"projectNumber":"S1153","queueDate":"2025-11-04T05:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Sand Lake 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398903,"projectNumber":"R5087","queueDate":"2025-11-06T05:00:00+00:00","inService":"2027-06-01T04:00:00+00:00","transmissionOwner":"","county":"Washington","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"4JORD - 4ASHLEY 138.0kV","summerNetMW":185.0,"winterNetMW":185.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398904,"projectNumber":"J4032","queueDate":"2025-05-30T04:00:00+00:00","withdrawnDate":"2025-12-26T05:00:00+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Deuel","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Astoria - Brookings County 345.0kV","summerNetMW":442.0,"winterNetMW":442.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398905,"projectNumber":"J3990","queueDate":"2025-04-17T04:00:00+00:00","inService":"2029-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398906,"projectNumber":"J3991","queueDate":"2025-04-17T04:00:00+00:00","inService":"2029-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":340.0,"winterNetMW":340.0,"dp1ErisMw":340.0,"dp1NrisMw":340.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398907,"projectNumber":"J3978","queueDate":"2025-04-08T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Petersburg - Sullivan (AEP/PJM) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398908,"projectNumber":"S1142","queueDate":"2026-01-30T00:15:13+00:00","inService":"2027-08-20T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"East Feliciana","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"SIS","poiName":"MOLER - COLFEL 230.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398909,"projectNumber":"J4016","queueDate":"2025-05-20T04:00:00+00:00","inService":"2029-12-30T05:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"ATLANTA - THETFORD [KARN] 138.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398910,"projectNumber":"J4015","queueDate":"2025-05-09T04:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Mason","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Quiver","summerNetMW":136.0,"winterNetMW":136.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398911,"projectNumber":"J3977","queueDate":"2025-03-31T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Sanilac","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"GREENWOOD - RAPSON 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398912,"projectNumber":"S1094","queueDate":"2025-04-08T04:00:00+00:00","inService":"2026-10-31T04:00:00+00:00","negInService":"2028-03-03T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"BOB WHITE","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398913,"projectNumber":"J4053","queueDate":"2025-07-28T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Grand Traverse","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"KEYSTONE - WEXFORD 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398914,"projectNumber":"J3979","queueDate":"2025-04-08T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Sullivan","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Petersburg - Sullivan (AEP/PJM) 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398915,"projectNumber":"J4051","queueDate":"2025-09-02T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NELSON 500 SWYD - RICHARD 500.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398916,"projectNumber":"J4014","queueDate":"2025-05-21T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Calumet","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Forest Junction","summerNetMW":650.0,"winterNetMW":650.0,"dp1ErisMw":650.0,"dp1NrisMw":650.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398917,"projectNumber":"J4028","queueDate":"2025-05-01T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Creek 138kV","summerNetMW":324.0,"winterNetMW":324.0,"dp1ErisMw":324.0,"dp1NrisMw":163.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398918,"projectNumber":"S1097","queueDate":"2025-05-23T04:00:00+00:00","inService":"2027-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Vermilion","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Tilton Switchyard","summerNetMW":188.0,"winterNetMW":188.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398919,"projectNumber":"S1077","queueDate":"2025-01-13T05:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"St. Clair","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Fayetteville Bee Hollow Road","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398920,"projectNumber":"J3992","queueDate":"2025-04-17T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"MAJESTIC - ONEIDA 345.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398921,"projectNumber":"J4052","queueDate":"2025-09-02T04:00:00+00:00","withdrawnDate":"2026-04-17T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NELSON 500 SWYD - RICHARD 500.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398922,"projectNumber":"J3888","queueDate":"2025-02-06T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-12T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EL DORADO EHV - SAREPTA 345/115 SS 345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398923,"projectNumber":"J3894","queueDate":"2025-02-14T05:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Lyon","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lyon County - Brookings County 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398924,"projectNumber":"J3909","queueDate":"2025-02-28T05:00:00+00:00","withdrawnDate":"2026-04-17T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"METC","county":"Gratiot","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ALMA - VESTABURG 138.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398925,"projectNumber":"J3926","queueDate":"2025-03-13T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Webster","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Grimes - Lehigh 345kV","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":170.0,"dp1NrisMw":170.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398926,"projectNumber":"J3928","queueDate":"2025-01-31T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"METC","county":"Bay","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"TITTABAWASSEE 345kV- GALLEGHER 345kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398927,"projectNumber":"J4131","queueDate":"2025-10-01T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Scott","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"J1347 TO Switchyard (115kV Entergy MS Switchyard)","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398928,"projectNumber":"J3889","queueDate":"2025-02-06T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-12T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EL DORADO EHV - SAREPTA 345/115 SS 345.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398929,"projectNumber":"J3907","queueDate":"2025-03-11T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Stark","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4BUREAU - 4EKEWANEE N 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398930,"projectNumber":"J3929","queueDate":"2025-01-31T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Audrain","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SPENCER CREEK","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398931,"projectNumber":"J4076","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NELSON 500 SWYD - RICHARD 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398932,"projectNumber":"J4100","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Livingston","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COLY - WILLOW GLEN 500 SWYD 500.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398933,"projectNumber":"J4118","queueDate":"2025-09-24T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"McLean","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Radbourn 345kV (LRTP-41)","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398934,"projectNumber":"J3945","queueDate":"2025-04-07T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"MAJESTIC - MILAN 345.0kV","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398935,"projectNumber":"J3895","queueDate":"2025-02-07T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"Muskegon","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ITC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"KENOWA - LUDINGTON 345.0kV","summerNetMW":199.72,"winterNetMW":199.72,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398936,"projectNumber":"J4132","queueDate":"2025-10-03T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Benton","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Mud Lake - Benton County (GRE) 230kV","summerNetMW":303.8,"winterNetMW":303.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398937,"projectNumber":"J4145","queueDate":"2025-10-06T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Cerro Gordo","state":"IA","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Emery","summerNetMW":98.0,"winterNetMW":98.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398938,"projectNumber":"J4149","queueDate":"2025-10-05T04:00:00+00:00","withdrawnDate":"2025-12-24T05:00:00+00:00","inService":"2030-04-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant","state":"SD","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South 345 kV substation","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398939,"projectNumber":"J4155","queueDate":"2025-10-06T04:00:00+00:00","inService":"2029-09-03T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Prairie Creek - Stony Point 115kV","summerNetMW":195.0,"winterNetMW":195.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398940,"projectNumber":"J3905","queueDate":"2025-03-12T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":175.0,"dp1NrisMw":175.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398941,"projectNumber":"J3932","queueDate":"2025-03-14T04:00:00+00:00","inService":"2029-06-29T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Duane Arnold 161 kV","summerNetMW":646.0,"winterNetMW":646.0,"dp1ErisMw":646.0,"dp1NrisMw":646.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398942,"projectNumber":"J3927","queueDate":"2025-02-24T05:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SHEBOYGAN FALLS STATION 138 KV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398943,"projectNumber":"J4083","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"Perry","state":"MS","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"Purvis Bulk 161 - Hintonville 161 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398944,"projectNumber":"J4117","queueDate":"2025-09-26T04:00:00+00:00","inService":"2030-09-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"North Rochester - Prairie Island 345.0kV","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":240.0,"dp1NrisMw":240.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398945,"projectNumber":"J4128","queueDate":"2025-09-19T04:00:00+00:00","inService":"2030-02-28T05:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Eaton","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Clinton Interconnection","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398946,"projectNumber":"J4129","queueDate":"2025-10-01T04:00:00+00:00","inService":"2029-04-12T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Otter Tail","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ALEXANDRIA - BISON 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398947,"projectNumber":"J4130","queueDate":"2025-10-01T04:00:00+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE","county":"Pepin","state":"WI","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ALMA  - ROCK ELM 161.0kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":110.0,"dp1NrisMw":110.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398948,"projectNumber":"J4144","queueDate":"2025-10-06T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Columbia","summerNetMW":525.0,"winterNetMW":525.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398949,"projectNumber":"J4148","queueDate":"2025-10-03T04:00:00+00:00","inService":"2030-01-31T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Clay","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"ERIS","poiName":"ALEXANDRIA - BISON 345.0kV","summerNetMW":245.0,"winterNetMW":245.0,"dp1ErisMw":245.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398950,"projectNumber":"J3893","queueDate":"2025-02-20T05:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC AUBREY - RITCHIE SWYD 230.0kV","summerNetMW":214.0,"winterNetMW":214.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398951,"projectNumber":"J3906","queueDate":"2025-03-12T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Stoddard","state":"MO","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"5STODDARD - 5MORLEY (AECI) 161.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398952,"projectNumber":"J3908","queueDate":"2025-03-10T04:00:00+00:00","inService":"2025-04-30T04:00:00+00:00","transmissionOwner":"METC","county":"St. Joseph","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"BATAVIA - MORROW  138.0kV","summerNetMW":196.0,"winterNetMW":196.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398953,"projectNumber":"J3931","queueDate":"2025-02-07T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Jasper","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":500.0,"dp1NrisMw":500.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398954,"projectNumber":"J4082","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Jefferson","state":"AR","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398955,"projectNumber":"J4085","queueDate":"2025-10-07T04:00:00+00:00","inService":"2027-10-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Nordic","summerNetMW":42.0,"winterNetMW":42.0,"dp1ErisMw":42.0,"dp1NrisMw":42.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398956,"projectNumber":"J4086","queueDate":"2025-10-07T04:00:00+00:00","inService":"2029-04-02T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wapello","state":"IA","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Ottumwa Generation - Tri-County 161kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398957,"projectNumber":"J4124","queueDate":"2025-08-25T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Trinity","state":"TX","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"MAGNOLIA GROVETON - KICKAPOO (L-111) TAP 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398958,"projectNumber":"J4143","queueDate":"2025-10-04T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"West Carroll","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"DARNELL","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398959,"projectNumber":"J4150","queueDate":"2025-10-06T04:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO.","county":"Cass","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"ATLANTIC - ADAIR 161.0kV","summerNetMW":42.24,"winterNetMW":42.24,"dp1ErisMw":39.0,"dp1NrisMw":39.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398960,"projectNumber":"J4168","queueDate":"2025-10-03T04:00:00+00:00","inService":"2028-04-03T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NROC 3 (601039) to PR ISLD3 (601003) 345 kV line","summerNetMW":330.0,"winterNetMW":330.0,"dp1ErisMw":330.0,"dp1NrisMw":330.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398961,"projectNumber":"R5088","queueDate":"2025-11-18T05:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Calcasieu","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"ERIS","poiName":"GOOS FERRY","summerNetMW":325.0,"winterNetMW":325.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398962,"projectNumber":"S1135","queueDate":"2025-12-23T02:01:14+00:00","inService":"2028-04-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Mower","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"SIS","poiName":"Adams","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398963,"projectNumber":"J4172","queueDate":"2025-10-07T04:00:00+00:00","inService":"2028-08-31T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Wapello","state":"IA","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Ottumwa Generating St. 161 kV","summerNetMW":99.0,"winterNetMW":99.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398964,"projectNumber":"S1125","queueDate":"2025-10-20T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"St. Francis","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"WEST MEMPHIS EHV - KEO EHV 500.0kV","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398965,"projectNumber":"S1132","queueDate":"2025-09-12T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Walworth","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"North Creek 138kV Station","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398966,"projectNumber":"J4167","queueDate":"2025-09-17T04:00:00+00:00","inService":"2030-10-31T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"ARGENTA","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398967,"projectNumber":"J4188","queueDate":"2025-10-03T04:00:00+00:00","inService":"2029-09-06T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"Beauregard","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cole - Cooper 230.0kV","summerNetMW":140.0,"winterNetMW":140.0,"dp1ErisMw":140.0,"dp1NrisMw":140.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398968,"projectNumber":"J3515","queueDate":"2024-04-17T04:00:00+00:00","inService":"2026-05-25T04:00:00+00:00","transmissionOwner":"CITY WATER LIGHT & POWER","county":"Sangamon","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"343505 Interstate","summerNetMW":199.9,"winterNetMW":199.9,"dp1ErisMw":199.9,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398969,"projectNumber":"J3726","queueDate":"2024-03-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-01-15T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Hancock","state":"KY","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Skillman","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398970,"projectNumber":"R5083","queueDate":"2025-09-30T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"St. James","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"ERIS","poiName":"CHACKBAY - VACHERIE 230.0kV","summerNetMW":135.0,"winterNetMW":135.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398971,"projectNumber":"R5084","queueDate":"2025-11-04T05:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"DONALDSONVILLE - EVERGREEN 230.0kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398972,"projectNumber":"S1170","queueDate":"2025-06-27T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Union","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"HUTTIG SS - STRONG SS 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398973,"projectNumber":"J3517","queueDate":"2024-04-19T04:00:00+00:00","inService":"2028-10-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Williamson","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Ordill","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":145.0,"dp1NrisMw":145.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3398974,"projectNumber":"J3772","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Panola","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BATESVILLE [MS] - MARKS 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398975,"projectNumber":"J3775","queueDate":"2024-04-15T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-12-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Desha","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"DUMAS - REED SS 115.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398976,"projectNumber":"J3516","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-08-14T04:00:00+00:00","inService":"2026-05-25T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jackson","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"Makanda North","summerNetMW":83.4,"winterNetMW":83.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398977,"projectNumber":"J3769","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"WOLVERINE POWER SUPPLY COOPERATIVE","county":"Saginaw","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MURPHY - NELSON ROAD 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398978,"projectNumber":"J2206","queueDate":"2021-08-19T04:00:00+00:00","withdrawnDate":"2023-04-04T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Fountain","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Attica Substation 230kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398979,"projectNumber":"J3700","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7BUNSONVILLE - 7SIDNEY   345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398980,"projectNumber":"J3710","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-31T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Jersey","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Jerseyville Northwest","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398981,"projectNumber":"J3714","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-07-15T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY SMEP","county":"Scott","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Homewood 69 - Lake 69.0kV","summerNetMW":95.0,"winterNetMW":95.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398982,"projectNumber":"S1179","queueDate":"2026-07-09T01:49:42+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"WI","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Plover","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398983,"projectNumber":"J3770","queueDate":"2024-04-01T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2027-04-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Randolph","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p","summerNetMW":45.8,"winterNetMW":45.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398984,"projectNumber":"J2299","queueDate":"2021-09-09T04:00:00+00:00","withdrawnDate":"2023-04-04T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Greene","state":"AR","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Marmaduke","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398985,"projectNumber":"J3237","queueDate":"2024-04-09T04:00:00+00:00","withdrawnDate":"2025-07-30T04:00:00+00:00","inService":"2028-06-09T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Itasca","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"National Tac Plant 115kV (Customer-owned)","summerNetMW":86.0,"winterNetMW":86.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398986,"projectNumber":"J1865","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-09-17T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Hardin","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Quinn-Blackhawk 345kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398987,"projectNumber":"J2067","queueDate":"2021-09-14T04:00:00+00:00","withdrawnDate":"2021-10-12T04:00:00+00:00","inService":"2024-09-01T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Clay","state":"MN","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Tamarac","summerNetMW":39.4,"winterNetMW":39.4,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398988,"projectNumber":"J1859","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-10-12T04:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Pottawattamie","state":"IA","studyCycle":"DPP-2021","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Council Bluffs - Fallow Avenue 345kV Line Tap","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398989,"projectNumber":"J2303","queueDate":"2021-07-19T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Waushara","state":"WI","studyCycle":"DPP-2021","studyGroup":"East (ATC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Sand Lake 138kV Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398990,"projectNumber":"J3238","queueDate":"2024-04-10T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Evangeline","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cocodrie - Ville Platte 230.0kV","summerNetMW":155.0,"winterNetMW":155.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398991,"projectNumber":"J3693","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Marshall","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"BURR OAK - LEESBURG 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398992,"projectNumber":"J3771","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Sabine","state":"LA","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fisher - Many 138.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398993,"projectNumber":"J3774","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - TILLATOBA 230.0kV","summerNetMW":303.0,"winterNetMW":303.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398994,"projectNumber":"J3804","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Edwardsport IGCC - Amo 345.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3398995,"projectNumber":"J3749","queueDate":"2024-04-11T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Lyon","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"LYON COUNTY","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398996,"projectNumber":"J3758","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Macon","state":"MO","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398997,"projectNumber":"J3801","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Mercer","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"OAK GROVE - SANDBURG (AMRN) 345.0kV","summerNetMW":195.64,"winterNetMW":195.64,"dp1ErisMw":195.64,"dp1NrisMw":195.64,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398998,"projectNumber":"J3695","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Clark","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"7CASEY - 7SNYDER  345.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3398999,"projectNumber":"J3699","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Henry","state":"IL","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"SUB 39 - OAK GROVE 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399000,"projectNumber":"J3704","queueDate":"2024-04-16T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Redwood","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399001,"projectNumber":"J1881","queueDate":"2021-08-16T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2024-09-15T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Decatur","state":"IN","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Decatur Switching Station 161kV","summerNetMW":48.0,"winterNetMW":48.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399002,"projectNumber":"J3706","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2030-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"GILMORE - WILSON 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399003,"projectNumber":"J2017","queueDate":"2021-08-26T04:00:00+00:00","withdrawnDate":"2021-12-08T05:00:00+00:00","inService":"2025-10-01T04:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Daviess","state":"KY","studyCycle":"DPP-2021","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"F B Culley- Northeast 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399004,"projectNumber":"J3734","queueDate":"2024-04-05T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Oakland","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"STRATFORD","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399005,"projectNumber":"J3757","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-03-13T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Dubuque","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Salem 161kv","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399006,"projectNumber":"J2058","queueDate":"2021-08-24T04:00:00+00:00","withdrawnDate":"2021-09-07T04:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Monroe to Wayne","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399007,"projectNumber":"J1887","queueDate":"2021-08-13T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2024-11-30T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"St. Martin","state":"LA","studyCycle":"DPP-2021","studyGroup":"South","studyPhase":"Phase 3","svcType":"NRIS","poiName":"St John 69kV","summerNetMW":90.0,"winterNetMW":90.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399008,"projectNumber":"J3753","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Iroquois","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":195.55,"winterNetMW":195.55,"dp1ErisMw":195.55,"dp1NrisMw":195.55,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399009,"projectNumber":"J3755","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Iroquois","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":146.66,"winterNetMW":146.66,"dp1ErisMw":146.66,"dp1NrisMw":146.66,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399010,"projectNumber":"J3819","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-08-15T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Madison","state":"MS","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"CATLETT - TINNIN ROAD 230.0kV","summerNetMW":36.1,"winterNetMW":36.1,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399011,"projectNumber":"J3817","queueDate":"2024-04-11T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-08-17T04:00:00+00:00","transmissionOwner":"METC","county":"Allegan","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399012,"projectNumber":"J3773","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-07-31T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Drew","state":"AR","studyCycle":"DPP-2023","studyGroup":"South","studyPhase":"Phase 2","svcType":"NRIS","poiName":"MONTICELLO EAST - REED SS 115.0kV","summerNetMW":265.0,"winterNetMW":265.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399013,"projectNumber":"J3239","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-30T04:00:00+00:00","inService":"2028-05-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Pana 138kV","summerNetMW":175.0,"winterNetMW":175.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399014,"projectNumber":"J3754","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Iroquois","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":146.66,"winterNetMW":146.66,"dp1ErisMw":146.66,"dp1NrisMw":146.66,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399015,"projectNumber":"J3745","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-07-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Dearborn","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sunman Weisburg","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":150.0,"dp1NrisMw":150.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399016,"projectNumber":"J3683","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-12-23T05:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Scott","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4BALLARD - 4MEREDOSA 138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399017,"projectNumber":"J3703","queueDate":"2024-03-25T04:00:00+00:00","inService":"2028-06-15T04:00:00+00:00","transmissionOwner":"MINNESOTA POWER INC.","county":"Itasca","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Blackberry 230/115kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399018,"projectNumber":"J3910","queueDate":"2025-02-28T05:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Newton","state":"IN","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":300.0,"dp1NrisMw":300.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399019,"projectNumber":"J3885","queueDate":"2025-02-25T05:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Morehouse","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"STERLINGTON 115 SWYD - AECC MERIDIAN 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399020,"projectNumber":"J3740","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-07-01T04:00:00+00:00","inService":"2027-09-15T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Putnam","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Other_","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399021,"projectNumber":"J4217","queueDate":"2026-02-23T23:10:31+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY SERVICES, LLC.","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":800.0,"winterNetMW":800.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399022,"projectNumber":"J3694","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-09-29T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vermillion","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Sugar Creek - Cayuga CT  345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399023,"projectNumber":"J3705","queueDate":"2024-04-16T04:00:00+00:00","withdrawnDate":"2025-09-24T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Redwood","state":"MN","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399024,"projectNumber":"J1987","queueDate":"2021-08-23T04:00:00+00:00","withdrawnDate":"2021-12-09T05:00:00+00:00","inService":"2024-10-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"DPP-2021","studyGroup":"East (ITC)","studyPhase":"Phase 3","svcType":"NRIS","poiName":"Coventry","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399025,"projectNumber":"J3818","queueDate":"2024-06-07T04:00:00+00:00","inService":"2028-03-01T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"ERIS","poiName":"4PANA 1 - 4SHELBYVL E 138.0kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":40.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399026,"projectNumber":"J3684","queueDate":"2024-04-17T04:00:00+00:00","withdrawnDate":"2025-04-22T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Morgan","state":"IL","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4JACK_IND N - 4YATES  138.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399027,"projectNumber":"J3886","queueDate":"2025-02-11T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Swift","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South - Alexandria 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399028,"projectNumber":"J4220","queueDate":"2026-02-26T01:51:55+00:00","withdrawnDate":"2026-05-28T04:00:00+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1500.0,"winterNetMW":1500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399029,"projectNumber":"S1175","queueDate":"2026-03-23T16:39:10+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399030,"projectNumber":"J4234","queueDate":"2026-03-21T01:20:07+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399031,"projectNumber":"J4221","queueDate":"2026-02-26T01:53:49+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1500.0,"winterNetMW":1500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399032,"projectNumber":"S1139","queueDate":"2026-03-04T09:27:50+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"","state":"MS","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":96.0,"winterNetMW":96.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399033,"projectNumber":"J4232","queueDate":"2026-03-20T19:15:57+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399034,"projectNumber":"J3702","queueDate":"2024-03-27T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Mitchell","state":"IA","studyCycle":"DPP-2023","studyGroup":"West","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ADAMS","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399035,"projectNumber":"S1109","queueDate":"2025-07-11T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Kossuth","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Bison","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399036,"projectNumber":"J3767","queueDate":"2024-04-18T04:00:00+00:00","withdrawnDate":"2025-09-23T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","transmissionOwner":"HOOSIER ENERGY","county":"Crawford","state":"IN","studyCycle":"DPP-2023","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ECKERTY - BUECHLER 69.0kV","summerNetMW":38.0,"winterNetMW":38.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399037,"projectNumber":"J3911","queueDate":"2025-02-25T05:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"Louisa","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SUB 93 LOUISA - SUB T HASKINS 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":250.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399038,"projectNumber":"J4224","queueDate":"2026-03-20T18:57:57+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399039,"projectNumber":"J4229","queueDate":"2026-03-20T18:50:34+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"DAIRYLAND POWER COOPERATIVE","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399040,"projectNumber":"S1173","queueDate":"2026-03-16T19:13:11+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Union","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"HUTTIG SS - STRONG SS 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399041,"projectNumber":"J3912","queueDate":"2025-02-21T05:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chippewa","state":"WI","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Red Cedar - Wheaton 56 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399042,"projectNumber":"S1174","queueDate":"2026-03-23T16:41:35+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399043,"projectNumber":"J3743","queueDate":"2024-04-12T04:00:00+00:00","inService":"2027-05-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"DPP-2023","studyGroup":"East (ITC)","studyPhase":"Phase 2","svcType":"NRIS","poiName":"ARROWHEAD","summerNetMW":175.5,"winterNetMW":175.5,"dp1ErisMw":175.5,"dp1NrisMw":175.5,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399044,"projectNumber":"J4216","queueDate":"2026-02-23T21:49:02+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY SERVICES, LLC.","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1500.0,"winterNetMW":1500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399045,"projectNumber":"J4024","queueDate":"2025-05-05T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":1499.0,"winterNetMW":1499.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399046,"projectNumber":"J4025","queueDate":"2025-05-05T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Monroe","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":1499.0,"winterNetMW":1499.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399047,"projectNumber":"S1159","queueDate":"2026-02-27T02:29:24+00:00","inService":"2028-08-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"WI","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399048,"projectNumber":"J4228","queueDate":"2026-03-19T21:36:16+00:00","inService":"2032-04-20T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399049,"projectNumber":"R5100","queueDate":"2026-07-22T22:09:39+00:00","inService":"2028-04-15T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Hot Spring","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"NRIS","poiName":"Arklahoma 115 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399050,"projectNumber":"J4218","queueDate":"2026-02-24T02:16:35+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY SERVICES, LLC.","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":800.0,"winterNetMW":800.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399051,"projectNumber":"J4219","queueDate":"2026-02-24T03:15:09+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1500.0,"winterNetMW":1500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399052,"projectNumber":"S1146","queueDate":"2026-03-16T20:02:28+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Muskegon","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"DU PONT - WHITE LAKE 138.0kV","summerNetMW":125.0,"winterNetMW":125.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399053,"projectNumber":"J4236","queueDate":"2026-03-20T20:03:44+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399054,"projectNumber":"S1162","queueDate":"2026-03-20T20:58:20+00:00","inService":"2029-03-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"AR","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":390.0,"winterNetMW":390.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399055,"projectNumber":"J4239","queueDate":"2026-04-23T23:01:14+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":770.0,"winterNetMW":770.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399056,"projectNumber":"R5096","queueDate":"2026-03-17T06:40:55+00:00","inService":"2027-07-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"ERIS","poiName":"AECC Dell East - Blytheville Elm St 161 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399057,"projectNumber":"J4026","queueDate":"2025-05-21T04:00:00+00:00","inService":"2029-01-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Lenawee","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"BEECHER - KNOWLES 138.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399058,"projectNumber":"S1172","queueDate":"2026-03-07T03:13:45+00:00","inService":"2027-12-01T05:00:00+00:00","transmissionOwner":"METC","county":"Clinton","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Calamus East","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399059,"projectNumber":"J4237","queueDate":"2026-03-24T01:07:46+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399060,"projectNumber":"J4230","queueDate":"2026-03-20T18:56:10+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399061,"projectNumber":"J4027","queueDate":"2025-05-28T04:00:00+00:00","withdrawnDate":"2026-01-07T05:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Clay","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC MCDOUGAL - TEXAS EASTERN STA 8 161.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399062,"projectNumber":"J3939","queueDate":"2025-04-01T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Beauregard","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"COLE to PENTON 230.0 kV","summerNetMW":386.0,"winterNetMW":386.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399063,"projectNumber":"J3956","queueDate":"2025-04-21T04:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Wilkin","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Hankinson 230 kV Substation","summerNetMW":240.0,"winterNetMW":240.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399064,"projectNumber":"J4062","queueDate":"2025-06-17T04:00:00+00:00","withdrawnDate":"2026-07-13T04:00:00+00:00","inService":"2025-05-12T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC.","county":"Jefferson","state":"TX","studyCycle":"0MW GIA","studyGroup":"NA","studyPhase":"","svcType":"ERIS","poiName":"Rhodair","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Waste Heat Recovery","facilityType":"Co-gen","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399065,"projectNumber":"J3969","queueDate":"2025-03-10T04:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2030-10-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Poinsett","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"HARRISBURG","summerNetMW":196.0,"winterNetMW":196.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399066,"projectNumber":"J4040","queueDate":"2025-07-25T04:00:00+00:00","inService":"2029-10-01T04:00:00+00:00","transmissionOwner":"METC","county":"Van Buren","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Palisades Switchyard","summerNetMW":735.0,"winterNetMW":735.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399067,"projectNumber":"J4044","queueDate":"2025-08-13T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"BEECHER - SEEMLESS EAST 138.0kV","summerNetMW":190.0,"winterNetMW":190.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399068,"projectNumber":"J4047","queueDate":"2025-08-13T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Tuscola","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"KARN - THETFORD (ATLANTA) 138.0kV","summerNetMW":160.0,"winterNetMW":160.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399069,"projectNumber":"J4065","queueDate":"2025-09-22T04:00:00+00:00","inService":"2030-06-28T04:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"Dakota","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Nininger 115 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399070,"projectNumber":"J4063","queueDate":"2025-09-04T04:00:00+00:00","inService":"2030-08-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Knox","state":"IN","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Gibson Sta - Bedford 345 345.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399071,"projectNumber":"J4226","queueDate":"2026-03-21T01:47:08+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Story","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"Story County","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399072,"projectNumber":"J4227","queueDate":"2026-03-21T01:49:23+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Story","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"Story County","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399073,"projectNumber":"J4050","queueDate":"2025-09-02T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Jefferson Davis","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"NELSON 500 SWYD - RICHARD 500.0kV","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":220.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399074,"projectNumber":"J3899","queueDate":"2024-12-03T05:00:00+00:00","inService":"2027-11-07T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Putnam","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399075,"projectNumber":"S1176","queueDate":"2026-04-13T22:25:17+00:00","inService":"2028-06-30T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399076,"projectNumber":"J3955","queueDate":"2025-04-08T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Lac qui Parle","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Big Stone South - Deuel County 345.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":200.0,"dp1NrisMw":200.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399077,"projectNumber":"J4233","queueDate":"2026-03-21T01:18:26+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399078,"projectNumber":"J4225","queueDate":"2026-03-20T19:02:22+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399079,"projectNumber":"J4235","queueDate":"2026-03-21T01:44:17+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Duane Arnold","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399080,"projectNumber":"J3954","queueDate":"2025-04-09T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"AMEREN TRANSMISSION COMPANY OF ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"ERIS","poiName":"7AUSTIN - 7PANA 345.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":250.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399081,"projectNumber":"J3970","queueDate":"2025-04-01T04:00:00+00:00","inService":"2029-12-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"MINDEN","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399082,"projectNumber":"J4009","queueDate":"2025-04-25T04:00:00+00:00","inService":"2030-08-30T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Marshall","state":"MN","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Viking - Karlstad 115.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399083,"projectNumber":"J4011","queueDate":"2025-05-15T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-08-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Miller","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"AECC LEWISVILLE WEST","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399084,"projectNumber":"S1100","queueDate":"2025-06-18T04:00:00+00:00","inService":"2027-10-31T04:00:00+00:00","negInService":"2028-04-21T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Mississippi","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399085,"projectNumber":"J4049","queueDate":"2025-08-28T04:00:00+00:00","withdrawnDate":"2026-04-17T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Ouachita","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"RILLA","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399086,"projectNumber":"J3901","queueDate":"2025-01-17T05:00:00+00:00","withdrawnDate":"2026-04-14T04:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Shelby","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4MATOONW S - 4NEOGA 3 138.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399087,"projectNumber":"J4073","queueDate":"2025-09-29T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Coahoma","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"LULA - JONESTOWN SS 115.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399088,"projectNumber":"J4072","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-09-30T04:00:00+00:00","transmissionOwner":"MINNESOTA MUNICIPAL POWER AGENCY M2PA","county":"Redwood","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Cedar Mountain - Lyon County 345.0kV","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399089,"projectNumber":"J4077","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-28T04:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Emmons","state":"ND","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Linton NW","summerNetMW":45.0,"winterNetMW":45.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399090,"projectNumber":"J3968","queueDate":"2025-03-14T04:00:00+00:00","inService":"2028-09-15T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Coles","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Mattoon West","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":100.0,"dp1NrisMw":100.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399091,"projectNumber":"J3971","queueDate":"2025-04-01T04:00:00+00:00","inService":"2029-12-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"STEIN","summerNetMW":255.0,"winterNetMW":255.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399092,"projectNumber":"J4079","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"CLECO POWER LLC CLEC","county":"Calcasieu","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"NELSON 230 SWYD - PENTON ROAD (CLECO) 230.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399093,"projectNumber":"J4080","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-05-19T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Jefferson","state":"AR","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399094,"projectNumber":"J4064","queueDate":"2025-09-04T04:00:00+00:00","withdrawnDate":"2025-12-22T05:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Tallahatchie","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"WEBB","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399095,"projectNumber":"J4010","queueDate":"2025-04-30T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"De Witt","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Clinton 345kV Substation","summerNetMW":21.0,"winterNetMW":21.0,"dp1ErisMw":21.0,"dp1NrisMw":21.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Nuclear","facilityType":"Nuclear","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399096,"projectNumber":"J4012","queueDate":"2025-05-15T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-09-04T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Crittenden","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"TWIST - PARKIN 161.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399097,"projectNumber":"J4046","queueDate":"2025-07-17T04:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Attala","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"CONEHOMA CREEK - CARTHAGE (MS) 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399098,"projectNumber":"J3917","queueDate":"2024-11-20T05:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Columbia","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SPRINGHILL - TAYLOR 115.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399099,"projectNumber":"J4068","queueDate":"2025-10-03T04:00:00+00:00","inService":"2030-08-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO.","county":"Marshall","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Lehigh - Marshalltown (Twinkle) 345kV","summerNetMW":232.0,"winterNetMW":232.0,"dp1ErisMw":232.0,"dp1NrisMw":232.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399100,"projectNumber":"J4067","queueDate":"2025-09-25T04:00:00+00:00","withdrawnDate":"2026-01-02T05:00:00+00:00","inService":"2029-02-01T05:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Panola","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Batesville","summerNetMW":180.0,"winterNetMW":180.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399101,"projectNumber":"J4066","queueDate":"2025-09-24T04:00:00+00:00","withdrawnDate":"2026-02-19T05:00:00+00:00","inService":"2030-01-06T05:00:00+00:00","transmissionOwner":"ITC","county":"Isabella","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"ERIS","poiName":"Weidman - Deerfield 69.0kV","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399102,"projectNumber":"J4048","queueDate":"2025-08-19T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Oceana","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"MEYER - LUDINGTON 345.0kV","summerNetMW":110.0,"winterNetMW":110.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399103,"projectNumber":"J3900","queueDate":"2024-12-26T05:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2030-04-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Sunflower","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"INDIANOLA 230/115 SUB - TILLATOBA 230.0kV","summerNetMW":163.0,"winterNetMW":163.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399104,"projectNumber":"J4078","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-28T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Mower","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"ADAMS","summerNetMW":500.0,"winterNetMW":500.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399105,"projectNumber":"J4095","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"GRASSMERE","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399106,"projectNumber":"J4041","queueDate":"2025-06-12T04:00:00+00:00","inService":"2030-11-01T04:00:00+00:00","transmissionOwner":"","county":"Menard","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Shockey","summerNetMW":220.0,"winterNetMW":220.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399107,"projectNumber":"J4043","queueDate":"2025-08-13T04:00:00+00:00","inService":"2028-04-01T04:00:00+00:00","transmissionOwner":"METC","county":"Eaton","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"Oneida","summerNetMW":178.0,"winterNetMW":178.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399108,"projectNumber":"J3918","queueDate":"2025-02-06T05:00:00+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Champaign","state":"IL","studyCycle":"DPP-2025","studyGroup":"Central","studyPhase":"Phase 1","svcType":"NRIS","poiName":"4RANTOUL  - 4RISING   138.0kV","summerNetMW":138.38,"winterNetMW":138.38,"dp1ErisMw":138.38,"dp1NrisMw":138.38,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399109,"projectNumber":"J4074","queueDate":"2025-09-29T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2029-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Crittenden","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"TWIST","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399110,"projectNumber":"J4081","queueDate":"2025-10-07T04:00:00+00:00","inService":"2031-06-28T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Grant","state":"SD","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Big Stone South 345 kV substation","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399111,"projectNumber":"J4087","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2026-06-11T04:00:00+00:00","inService":"2029-06-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Blue Earth","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"SOUTH BEND","summerNetMW":183.0,"winterNetMW":183.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399112,"projectNumber":"J4096","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-01-30T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Goodhue","state":"MN","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399113,"projectNumber":"J4094","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"GRASSMERE","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399114,"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"METC","county":"Mason","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"PERE MARQUETTE","summerNetMW":400.0,"winterNetMW":400.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399115,"projectNumber":"J4107","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2025-12-26T05:00:00+00:00","inService":"2030-10-15T04:00:00+00:00","transmissionOwner":"COOPERATIVE ENERGY","county":"Covington","state":"MS","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Southwest Lone Star 161 - Mississippi Hub 161.0kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399116,"projectNumber":"J4141","queueDate":"2025-10-07T04:00:00+00:00","withdrawnDate":"2025-12-19T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Morehouse","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV","summerNetMW":650.0,"winterNetMW":650.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399117,"projectNumber":"J4137","queueDate":"2025-09-29T04:00:00+00:00","inService":"2030-08-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Pulaski","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Other_","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399118,"projectNumber":"S1079","queueDate":"2025-03-25T04:00:00+00:00","inService":"2028-07-30T04:00:00+00:00","negInService":"2028-02-28T05:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cass","state":"ND","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"BISON","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399119,"projectNumber":"S1092","queueDate":"2025-03-04T05:00:00+00:00","inService":"2027-09-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Lafayette","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Falcon","summerNetMW":98.0,"winterNetMW":98.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Revision Approval","sisPhase1":"","postGIAStatus":""},{"id":3399120,"projectNumber":"J4140","queueDate":"2025-09-25T04:00:00+00:00","withdrawnDate":"2026-04-16T04:00:00+00:00","inService":"2030-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Ouachita","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Cotton","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399121,"projectNumber":"J4139","queueDate":"2025-09-25T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Nevada","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"EMMET SS - HOPE EAST SS 115.0kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399122,"projectNumber":"S1141","queueDate":"2025-08-26T04:00:00+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Hinds","state":"MS","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"TINNIN ROAD","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399123,"projectNumber":"J4203","queueDate":"2025-06-06T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"DPP-2026","studyGroup":"East (ITC)","studyPhase":"","svcType":"NRIS","poiName":"RAPSON - STEIN 345.0kV","summerNetMW":350.0,"winterNetMW":350.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Wind","facilityType":"Wind Turbine","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399124,"projectNumber":"J4138","queueDate":"2025-10-07T04:00:00+00:00","inService":"2030-01-02T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC","county":"Iberville","state":"LA","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"WEBRE","summerNetMW":755.0,"winterNetMW":805.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combined Cycle","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399125,"projectNumber":"S1145","queueDate":"2025-10-30T04:00:00+00:00","inService":"2029-07-31T04:00:00+00:00","transmissionOwner":"ITC","county":"Huron","state":"MI","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Harvest Wind Point Tap 120 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399126,"projectNumber":"S1103","queueDate":"2025-06-17T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Perry","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Aster 138kV Station","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399127,"projectNumber":"J4169","queueDate":"2025-10-06T04:00:00+00:00","inService":"2025-09-15T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Dickinson","state":"MI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Nordic","summerNetMW":5.99,"winterNetMW":5.99,"dp1ErisMw":0.0,"dp1NrisMw":5.99,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399128,"projectNumber":"S1181","queueDate":"2026-03-02T22:47:59+00:00","inService":"2028-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Story County","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399129,"projectNumber":"J4034","queueDate":"2025-06-13T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Vigo","state":"IN","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Sandford 345 kV","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399130,"projectNumber":"J4035","queueDate":"2025-06-09T04:00:00+00:00","withdrawnDate":"2026-01-05T05:00:00+00:00","inService":"2029-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Greene","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"SEDGEWICK SS - AECC LIGHT 115.0kV","summerNetMW":113.0,"winterNetMW":113.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399131,"projectNumber":"J4039","queueDate":"2025-06-13T04:00:00+00:00","withdrawnDate":"2026-07-22T04:00:00+00:00","inService":"2030-06-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Montgomery","state":"IN","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Cayuga  -  Frankfort  230.0kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399132,"projectNumber":"S1102","queueDate":"2025-06-16T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"Cass","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Walton 230","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Battery Storage","facilityType":"Battery Storage","applicationStatus":"Pending Transfer","sisPhase1":"","postGIAStatus":""},{"id":3399133,"projectNumber":"J4037","queueDate":"2025-06-30T04:00:00+00:00","withdrawnDate":"2026-04-15T04:00:00+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO.","county":"Franklin","state":"IA","studyCycle":"DPP-2025","studyGroup":"West","studyPhase":"Phase 1","svcType":"NRIS","poiName":"FRANKLIN - WALL LAKE 161.0kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399134,"projectNumber":"J4165","queueDate":"2025-09-29T04:00:00+00:00","inService":"2030-05-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Kenosha","state":"WI","studyCycle":"DPP-2025","studyGroup":"East (ATC)","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Other_","summerNetMW":1203.0,"winterNetMW":1203.0,"dp1ErisMw":1203.0,"dp1NrisMw":1203.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399135,"projectNumber":"J4163","queueDate":"2025-11-05T05:00:00+00:00","inService":"2026-08-03T04:00:00+00:00","transmissionOwner":"","county":"Drew","state":"AR","studyCycle":"0MW GIA","studyGroup":"NA","studyPhase":"","svcType":"ERIS","poiName":"Wilmar East","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Biomass","facilityType":"Co-gen","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399136,"projectNumber":"J4142","queueDate":"2025-10-04T04:00:00+00:00","withdrawnDate":"2026-03-11T04:00:00+00:00","inService":"2030-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Franklin","state":"LA","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"Gilbert 115 kV","summerNetMW":115.0,"winterNetMW":115.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399137,"projectNumber":"J4038","queueDate":"2025-06-18T04:00:00+00:00","inService":"2030-01-01T05:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"St. Francis","state":"AR","studyCycle":"DPP-2025","studyGroup":"South","studyPhase":"Phase 1","svcType":"NRIS","poiName":"BRINKLEY EAST - AECC PALESTINE 161.0kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":80.0,"dp1NrisMw":80.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Solar/Battery","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399138,"projectNumber":"J4284","queueDate":"2026-08-15T01:40:04+00:00","inService":"2029-04-02T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":118.0,"winterNetMW":118.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399139,"projectNumber":"J4285","queueDate":"2026-08-15T01:40:17+00:00","inService":"2029-04-02T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":189.0,"winterNetMW":189.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399140,"projectNumber":"J4266","queueDate":"2026-08-14T02:51:26+00:00","inService":"2031-05-01T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399141,"projectNumber":"J4255","queueDate":"2026-07-24T21:04:01+00:00","inService":"2031-01-14T05:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399142,"projectNumber":"R5099","queueDate":"2026-07-22T16:54:37+00:00","inService":"2029-03-30T04:00:00+00:00","transmissionOwner":"ENTERGY TEXAS, INC. ETTO","county":"Liberty","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"ERIS","poiName":"Colony - Plum Grove 230 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399143,"projectNumber":"J4033","queueDate":"2025-06-13T04:00:00+00:00","withdrawnDate":"2025-12-22T05:00:00+00:00","inService":"2030-01-30T05:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Christian","state":"IL","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"7LATHAM - KINCAID  ; B 345.0kV","summerNetMW":156.8,"winterNetMW":156.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399144,"projectNumber":"J4257","queueDate":"2026-08-17T19:45:28+00:00","inService":"2031-10-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399145,"projectNumber":"J4268","queueDate":"2026-08-12T20:37:25+00:00","inService":"2030-10-01T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399146,"projectNumber":"J4278","queueDate":"2026-08-28T02:36:10+00:00","inService":"2031-05-12T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399147,"projectNumber":"J4277","queueDate":"2026-08-28T02:26:06+00:00","inService":"2031-05-12T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399148,"projectNumber":"J4271","queueDate":"2026-08-24T21:38:02+00:00","inService":"2031-05-12T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399149,"projectNumber":"J4256","queueDate":"2026-08-10T22:42:47+00:00","inService":"2031-06-30T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":2015.0,"winterNetMW":2015.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399150,"projectNumber":"J4270","queueDate":"2026-08-14T18:50:55+00:00","inService":"2031-05-01T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC CIN","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399151,"projectNumber":"J4259","queueDate":"2026-08-21T17:46:46+00:00","inService":"2030-12-01T05:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399152,"projectNumber":"J4252","queueDate":"2026-07-15T19:34:08+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399153,"projectNumber":"J4250","queueDate":"2026-07-15T19:16:39+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"GREAT RIVER ENERGY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399154,"projectNumber":"J4272","queueDate":"2026-08-24T17:37:24+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399155,"projectNumber":"J4274","queueDate":"2026-08-24T17:38:08+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399156,"projectNumber":"J4297","queueDate":"2026-09-04T21:16:39+00:00","inService":"2030-07-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399157,"projectNumber":"S1178","queueDate":"2026-07-29T01:54:06+00:00","inService":"2027-09-29T04:00:00+00:00","transmissionOwner":"MIDAMERICAN ENERGY CO. MEC","county":"","state":"","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399158,"projectNumber":"J4287","queueDate":"2026-08-14T18:44:16+00:00","inService":"2028-09-01T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC. EMTO","county":"Morehouse","state":"","studyCycle":"DPP-2026","studyGroup":"South","studyPhase":"","svcType":"NRIS","poiName":"BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399159,"projectNumber":"J4275","queueDate":"2026-08-18T21:41:50+00:00","inService":"2031-05-01T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399160,"projectNumber":"J4261","queueDate":"2026-08-24T17:35:42+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"East (ATC)","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399161,"projectNumber":"J4291","queueDate":"2026-08-24T23:21:22+00:00","inService":"2026-11-30T05:00:00+00:00","transmissionOwner":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS-Only","poiName":"","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399162,"projectNumber":"J4264","queueDate":"2026-08-20T19:51:19+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":1000.0,"winterNetMW":1000.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399163,"projectNumber":"J4300","queueDate":"2026-08-28T21:30:16+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":238.7,"winterNetMW":238.7,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399164,"projectNumber":"R1049","queueDate":"2024-12-24T05:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Edgewater 345kV","summerNetMW":303.5,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399165,"projectNumber":"R1045","queueDate":"2024-03-01T05:00:00+00:00","inService":"2025-06-03T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chippewa","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Wheaton 161kV","summerNetMW":237.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399166,"projectNumber":"S1069","queueDate":"2024-11-01T04:00:00+00:00","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Montcalm","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Eureka to Vestaburg 138kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399167,"projectNumber":"R1051","queueDate":"2024-05-16T04:00:00+00:00","inService":"2025-04-01T04:00:00+00:00","transmissionOwner":"","county":"Scott County","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Blue Lake 115kV","summerNetMW":55.0,"winterNetMW":42.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399168,"projectNumber":"J4273","queueDate":"2026-08-24T17:36:27+00:00","inService":"2029-12-31T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399169,"projectNumber":"S1072","queueDate":"2024-12-05T05:00:00+00:00","inService":"2025-08-15T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Sherburne","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Sherburne 345kV","summerNetMW":10.0,"winterNetMW":10.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399170,"projectNumber":"S1074","queueDate":"2025-02-28T05:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"ENTERGY ARKANSAS, LLC EATO","county":"Phillips","state":"AR","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Ritchie Plant 230 kV Substation","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399171,"projectNumber":"J4280","queueDate":"2026-08-28T21:27:09+00:00","inService":"2030-04-15T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"","state":"","studyCycle":"DPP-2026","studyGroup":"West","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":245.8,"winterNetMW":245.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399172,"projectNumber":"S1066","queueDate":"2024-10-07T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Lenawee County","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399173,"projectNumber":"S1086","queueDate":"2025-02-18T05:00:00+00:00","inService":"2026-12-01T05:00:00+00:00","transmissionOwner":"","county":"Stoddard","state":"MO","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Stoddard - Morley 161kV","summerNetMW":225.0,"winterNetMW":225.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399174,"projectNumber":"J4260","queueDate":"2026-08-25T21:10:25+00:00","inService":"2031-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Portage","state":"","studyCycle":"DPP-2026","studyGroup":"Central","studyPhase":"","svcType":"NRIS","poiName":"Plover","summerNetMW":250.0,"winterNetMW":250.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399175,"projectNumber":"R1038","queueDate":"2023-11-28T05:00:00+00:00","inService":"2025-11-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Benton","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Mayhew Lake 115kV","summerNetMW":100.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399176,"projectNumber":"S1003","queueDate":"2020-11-06T05:00:00+00:00","withdrawnDate":"2021-02-10T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"White","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Reynolds 345KV substation","summerNetMW":55.0,"winterNetMW":55.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399177,"projectNumber":"R1052","queueDate":"2024-06-24T04:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"METC","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"ERIS","poiName":"\"18CAMPBELLW”, “18CAMPBELLB","summerNetMW":615.0,"winterNetMW":615.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399178,"projectNumber":"R1057","queueDate":"2024-08-16T04:00:00+00:00","inService":"2025-09-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Jefferson","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Rush Island Plant – 345KV Switchyard (Existing)","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399179,"projectNumber":"S1053","queueDate":"2024-07-09T04:00:00+00:00","inService":"2026-10-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Chisago","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Chisago County Substation","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399180,"projectNumber":"S1071","queueDate":"2024-11-15T05:00:00+00:00","inService":"2025-11-07T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Lee","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Wever - Burlington 161 kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399181,"projectNumber":"S1073","queueDate":"2025-02-19T05:00:00+00:00","inService":"2026-08-31T04:00:00+00:00","negInService":"2027-03-01T05:00:00+00:00","transmissionOwner":"BIG RIVERS ELECTRIC CORPORATION BREC","county":"Webster","state":"KY","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Hopkins to Reid EVH 161kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399182,"projectNumber":"S1060","queueDate":"2024-07-25T04:00:00+00:00","inService":"2026-02-01T05:00:00+00:00","transmissionOwner":"METC","county":"Shiawasse","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Gross 138kV - Bus #256155","summerNetMW":149.0,"winterNetMW":149.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399183,"projectNumber":"S1063","queueDate":"2024-08-28T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","negInService":"2027-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Verona - Foundry 138kV","summerNetMW":70.0,"winterNetMW":70.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Under Construction"},{"id":3399184,"projectNumber":"R1059","queueDate":"2024-12-16T05:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"St. Louis","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Meramec Plant – 138KV Switchyard","summerNetMW":98.8,"winterNetMW":98.8,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399185,"projectNumber":"S1057","queueDate":"2024-07-15T04:00:00+00:00","inService":"2027-07-11T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland and Coles","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Neoga South","summerNetMW":210.0,"winterNetMW":210.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399186,"projectNumber":"R1056","queueDate":"2024-07-12T04:00:00+00:00","withdrawnDate":"2025-12-31T05:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"E.D. Edwards 138kV","summerNetMW":184.71,"winterNetMW":184.71,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399187,"projectNumber":"S1075","queueDate":"2024-12-20T05:00:00+00:00","inService":"2027-12-27T05:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Jasper and Starke","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Hinshaw 345 kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399188,"projectNumber":"R1040","queueDate":"2023-11-09T05:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"METC","county":"Ottawa","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Campbell Substation 345kV","summerNetMW":749.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399189,"projectNumber":"R1039","queueDate":"2023-10-05T04:00:00+00:00","inService":"2025-01-31T05:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Ouachita","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Sterlington 115kV","summerNetMW":49.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399190,"projectNumber":"R1054","queueDate":"2024-07-12T04:00:00+00:00","withdrawnDate":"2025-12-31T05:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Tazewell","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"E.D. Edwards 69kV","summerNetMW":261.0,"winterNetMW":261.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399191,"projectNumber":"R5061","queueDate":"2025-02-01T05:00:00+00:00","inService":"2025-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Sheboygan","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Edgewater 5 - 345kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399192,"projectNumber":"S1059","queueDate":"2024-07-26T04:00:00+00:00","inService":"2027-01-30T05:00:00+00:00","negInService":"2013-11-18T05:00:00+00:00","transmissionOwner":"ITC","county":"Tuscola","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Dixon 120kV - Bus # 265182","summerNetMW":100.3,"winterNetMW":100.3,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399193,"projectNumber":"R1046","queueDate":"2024-05-08T04:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Jefferson","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Madison Substation 138kV","summerNetMW":150.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399194,"projectNumber":"R1055","queueDate":"2024-07-12T04:00:00+00:00","inService":"2025-09-30T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Peoria","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"E.D. Edwards 138kV","summerNetMW":322.0,"winterNetMW":110.15,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399195,"projectNumber":"S1076","queueDate":"2025-01-07T05:00:00+00:00","inService":"2027-08-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Tangipahoa Parish","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Amite 115kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399196,"projectNumber":"S1091","queueDate":"2025-02-19T05:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Cape Girardeau","state":"MO","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Adna 345 kV","summerNetMW":200.0,"winterNetMW":200.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399197,"projectNumber":"R1047","queueDate":"2024-05-28T04:00:00+00:00","inService":"2025-12-31T05:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"St. Louis","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Meramec Substation 138kV","summerNetMW":824.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399198,"projectNumber":"J2656","queueDate":"2022-09-15T04:00:00+00:00","inService":"2026-05-01T04:00:00+00:00","transmissionOwner":"","county":"Macon","state":"","studyCycle":"DPP-2022","studyGroup":"Central","studyPhase":"Phase 2","svcType":"NRIS","poiName":"4LATHAM-4N DEC E 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":180.0,"dp1NrisMw":180.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"},{"id":3399199,"projectNumber":"R1048","queueDate":"2024-05-13T04:00:00+00:00","inService":"2025-05-13T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC ELTO","county":"Iberville","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Dow Meter Point","summerNetMW":0.0,"winterNetMW":1231.73,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399200,"projectNumber":"R1043","queueDate":"2023-12-01T05:00:00+00:00","withdrawnDate":"2024-12-09T05:00:00+00:00","inService":"2024-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Des Moines","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"ITCM Burlington 161kV","summerNetMW":31.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399201,"projectNumber":"S1068","inService":"2027-01-01T05:00:00+00:00","transmissionOwner":"ITC","county":"Hillsdale","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Cronk Road","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399202,"projectNumber":"R1044","queueDate":"2024-02-06T05:00:00+00:00","inService":"2028-03-31T04:00:00+00:00","transmissionOwner":"DUKE ENERGY INDIANA, LLC","county":"Vermillion","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Cayuga Steam Station Switchyards 230kV and 345kV","summerNetMW":1040.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399203,"projectNumber":"S1055","queueDate":"2024-07-09T04:00:00+00:00","inService":"2026-08-01T04:00:00+00:00","negInService":"2026-12-03T05:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Beltrami","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Wilton (endpoint 1) to Bagley (endpoint 2) 115kV","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399204,"projectNumber":"R1050","queueDate":"2024-05-31T04:00:00+00:00","inService":"2027-04-01T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Scott","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Blue Lake 115kV","summerNetMW":135.5,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399205,"projectNumber":"R1060","queueDate":"2025-01-22T05:00:00+00:00","withdrawnDate":"2025-10-31T04:00:00+00:00","inService":"2027-11-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Green","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"North Monroe 138 kV","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399206,"projectNumber":"S1058","inService":"2026-08-01T04:00:00+00:00","negInService":"2022-03-30T04:00:00+00:00","transmissionOwner":"METC","county":"Calhoun","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Stonehill Substation 138kV","summerNetMW":100.0,"winterNetMW":100.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399207,"projectNumber":"S1050","queueDate":"2024-04-04T04:00:00+00:00","withdrawnDate":"2024-07-12T04:00:00+00:00","inService":"2026-05-31T04:00:00+00:00","transmissionOwner":"ENTERGY LOUISIANA, LLC","county":"Jefferson Davies","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Lake Charles Bulk 38kV Tap","summerNetMW":165.0,"winterNetMW":165.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399208,"projectNumber":"R5068","inService":"2023-11-27T05:00:00+00:00","negInService":"2023-10-20T04:00:00+00:00","transmissionOwner":"","county":"","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399209,"projectNumber":"S1052","queueDate":"2024-06-14T04:00:00+00:00","inService":"2026-09-22T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Cumberland","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Neoga South 138kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399210,"projectNumber":"S1047","queueDate":"2023-10-13T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY OTP","county":"Codington","state":"SD","studyCycle":"NO_CYCLE","studyGroup":"NO_GROUP","studyPhase":"","svcType":"SIS","poiName":"Big Stone South 230kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399211,"projectNumber":"R1058","queueDate":"2024-08-16T04:00:00+00:00","inService":"2025-09-25T04:00:00+00:00","transmissionOwner":"AMEREN MISSOURI","county":"Jefferson","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS-Only","poiName":"Rush Island Plant – 345kV Switchyard (Existing) Bus Number in Power Flow","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399212,"projectNumber":"J544","inService":"2018-09-01T04:00:00+00:00","giaToExec":"2018-01-12T05:00:00+00:00","negInService":"2021-09-15T04:00:00+00:00","transmissionOwner":"","county":"","state":"LA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":98.1,"dp1NrisMw":98.1,"dp2ErisMw":98.1,"dp2NrisMw":98.1,"fuelType":"","facilityType":"","applicationStatus":"LEGACY: Done","sisPhase1":"","postGIAStatus":"In Service"},{"id":3399213,"projectNumber":"S1065","queueDate":"2024-10-07T04:00:00+00:00","inService":"2028-09-30T04:00:00+00:00","negInService":"2028-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw County","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Majestic 345kV to Milan 345kV","summerNetMW":76.5,"winterNetMW":76.5,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399214,"projectNumber":"R1042","queueDate":"2022-10-22T04:00:00+00:00","withdrawnDate":"2025-05-13T04:00:00+00:00","inService":"2023-10-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Linn","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"Duane Arnold 161kV","summerNetMW":64.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399215,"projectNumber":"R1053","queueDate":"2024-06-17T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Milwaukee","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"Elm Road","summerNetMW":1138.0,"winterNetMW":1138.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Gas","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399216,"projectNumber":"S1046","queueDate":"2023-10-13T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"Codington","state":"SD","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Big Stone South 230kV","summerNetMW":120.0,"winterNetMW":120.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399217,"projectNumber":"S1045","queueDate":"2023-09-17T04:00:00+00:00","inService":"2024-03-02T05:00:00+00:00","transmissionOwner":"MONTANA-DAKOTA UTILITIES CO.","county":"Emmons","state":"ND","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Napoleon SW 230 kV (661091)","summerNetMW":170.0,"winterNetMW":170.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399218,"projectNumber":"S1054","queueDate":"2024-07-19T04:00:00+00:00","inService":"2027-10-30T04:00:00+00:00","negInService":"2028-05-31T04:00:00+00:00","transmissionOwner":"NORTHERN STATES POWER COMPANY","county":"Cottonwood","state":"MN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Lakefield Junction 345kV","summerNetMW":300.0,"winterNetMW":300.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399219,"projectNumber":"S1061","queueDate":"2024-08-01T04:00:00+00:00","inService":"2026-09-30T04:00:00+00:00","negInService":"2026-09-30T04:00:00+00:00","transmissionOwner":"METC","county":"Midland","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Redstone 138 kV - Bus #256543","summerNetMW":50.0,"winterNetMW":50.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399220,"projectNumber":"S1070","inService":"2025-08-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Union","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"ROUNDHOUSEJ1","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399221,"projectNumber":"S1048","queueDate":"2023-10-30T04:00:00+00:00","inService":"2025-05-01T04:00:00+00:00","transmissionOwner":"AMEREN ILLINOIS","county":"Logan","state":"IL","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Fogarty Substation 138kV","summerNetMW":40.0,"winterNetMW":40.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399222,"projectNumber":"R5062","queueDate":"2024-12-23T05:00:00+00:00","withdrawnDate":"2026-04-13T04:00:00+00:00","transmissionOwner":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC","county":"Jasper","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"SCHAHFER GEN STA","summerNetMW":732.73,"winterNetMW":732.73,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"Hybrid","facilityType":"Combustion Turbine (Simple Cycle)","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399223,"projectNumber":"S1049","queueDate":"2024-04-04T04:00:00+00:00","inService":"2026-08-30T04:00:00+00:00","transmissionOwner":"ENTERGY MISSISSIPPI, LLC.","county":"Sunflower","state":"MS","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Shaw to Indianola 115kV Line Tap","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399224,"projectNumber":"S1062","queueDate":"2024-08-15T04:00:00+00:00","inService":"2026-10-15T04:00:00+00:00","transmissionOwner":"METC","county":"Branch","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"New Byers 138kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399225,"projectNumber":"S1056","queueDate":"2024-07-15T04:00:00+00:00","withdrawnDate":"2025-04-09T04:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"AMERICAN TRANSMISSION COMPANY","county":"Columbia","state":"WI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Columbia 345kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399226,"projectNumber":"R1037","queueDate":"2023-09-28T04:00:00+00:00","inService":"2026-02-28T05:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Allamakee","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"ITCM Lansing 161kV","summerNetMW":180.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399227,"projectNumber":"S1087","queueDate":"2025-02-18T05:00:00+00:00","inService":"2026-06-01T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Clinton","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Rock Creek 345 kV","summerNetMW":150.0,"winterNetMW":150.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Active","sisPhase1":"","postGIAStatus":""},{"id":3399228,"projectNumber":"S1064","queueDate":"2024-09-06T04:00:00+00:00","withdrawnDate":"2026-06-23T04:00:00+00:00","inService":"2026-11-01T04:00:00+00:00","transmissionOwner":"OTTER TAIL POWER COMPANY","county":"","state":"ND","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"EDGE SS9 41.6 kV","summerNetMW":20.0,"winterNetMW":20.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399229,"projectNumber":"R1041","queueDate":"2023-10-11T04:00:00+00:00","inService":"2025-05-31T04:00:00+00:00","transmissionOwner":"METC","county":"Wayne","state":"","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"NRIS","poiName":"TCHPP Position JC 120kV","summerNetMW":220.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399230,"projectNumber":"S1051","queueDate":"2024-06-03T04:00:00+00:00","inService":"2029-03-15T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Worth","state":"IA","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Worth County Substation 161kV","summerNetMW":80.0,"winterNetMW":80.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""},{"id":3399231,"projectNumber":"J446","withdrawnDate":"2023-02-21T05:00:00+00:00","transmissionOwner":"","county":"","state":"IN","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"","poiName":"","summerNetMW":0.0,"winterNetMW":0.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Withdrawn","sisPhase1":"","postGIAStatus":""},{"id":3399232,"projectNumber":"S1067","queueDate":"2024-10-02T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00","transmissionOwner":"ITC","county":"Washtenaw","state":"MI","studyCycle":"","studyGroup":"","studyPhase":"","svcType":"SIS","poiName":"Majestic- Lemoyne 345 kV","summerNetMW":75.0,"winterNetMW":75.0,"dp1ErisMw":0.0,"dp1NrisMw":0.0,"dp2ErisMw":0.0,"dp2NrisMw":0.0,"fuelType":"","facilityType":"","applicationStatus":"Done","sisPhase1":"","postGIAStatus":""}]